메뉴 건너뛰기




Volumn 51, Issue 1-4, 2010, Pages 341-355

Simulation-based metamodels for the analysis of scheduling decisions in a flexible manufacturing system operating in a tool-sharing environment

Author keywords

Flexible manufacturing system; Metamodels; Regression; Simulation; Tool sharing

Indexed keywords

DISCRETE-EVENT SIMULATION MODEL; MEAN FLOW TIME; MEAN INTER-ARRIVAL TIME; MEAN TARDINESS; META MODEL; PART SCHEDULING; PERFORMANCE MEASURE; REGRESSION; SCHEDULING DECISIONS; SCHEDULING RULES; SIMULATION; SIMULATION EXPERIMENTS; SIMULATION MODEL; SIMULATION RESULT; SIMULATION-BASED; SYSTEMATIC ANALYSIS;

EID: 78149467080     PISSN: 02683768     EISSN: 14333015     Source Type: Journal    
DOI: 10.1007/s00170-010-2603-9     Document Type: Article
Times cited : (10)

References (34)
  • 1
    • 0018430630 scopus 로고
    • Regression metamodels for generalising simulation results
    • 10.1109/TSMC.1979.4310155
    • JPC Kleijnen 1979 Regression metamodels for generalising simulation results IEEE Trans Syst Man Cybern 9 93 96 10.1109/TSMC.1979.4310155
    • (1979) IEEE Trans Syst Man Cybern , vol.9 , pp. 93-96
    • Kleijnen, J.P.C.1
  • 2
    • 64249119255 scopus 로고    scopus 로고
    • Flexible manufacturing system selection using an improved compromise ranking method
    • 10.1504/IJISE.2009.022372
    • RV Rao 2009 Flexible manufacturing system selection using an improved compromise ranking method Int J of Ind Syst Eng 4 2 198 215 10.1504/IJISE.2009. 022372
    • (2009) Int J of Ind Syst Eng , vol.4 , Issue.2 , pp. 198-215
    • Rao, R.V.1
  • 3
    • 34250111322 scopus 로고
    • Design, planning, scheduling and control problems in flexible manufacturing systems
    • 10.1007/BF02023765
    • KE Stecke 1985 Design, planning, scheduling and control problems in flexible manufacturing systems Ann Oper Res 3 3 12 10.1007/BF02023765
    • (1985) Ann Oper Res , vol.3 , pp. 3-12
    • Stecke, K.E.1
  • 4
    • 2642567726 scopus 로고    scopus 로고
    • Tool allocation in flexible manufacturing systems with tool alternatives
    • 10.1016/j.rcim.2004.01.001
    • N Buyurgan C Saygin SE Kilic 2004 Tool allocation in flexible manufacturing systems with tool alternatives Robotics Comput Integrated Manuf 20 341 349 10.1016/j.rcim.2004.01.001
    • (2004) Robotics Comput Integrated Manuf , vol.20 , pp. 341-349
    • Buyurgan, N.1    Saygin, C.2    Kilic, S.E.3
  • 5
    • 0028273650 scopus 로고
    • Performance analysis of a LIM-based high-speed tool-delivery system for machining
    • 0907.90171 10.1080/00207549408956923
    • HS Hahn JL Sanders 1994 Performance analysis of a LIM-based high-speed tool-delivery system for machining Int J Prod Res 32 1 179 207 0907.90171 10.1080/00207549408956923
    • (1994) Int J Prod Res , vol.32 , Issue.1 , pp. 179-207
    • Hahn, H.S.1    Sanders, J.L.2
  • 6
    • 0037144829 scopus 로고    scopus 로고
    • High performance loading robot design for a tool-delivery system
    • 10.1080/00207540210146170
    • H Gougar S Cho V Prabhu 2002 High performance loading robot design for a tool-delivery system Int J Prod Res 40 14 3401 3424 10.1080/00207540210146170
    • (2002) Int J Prod Res , vol.40 , Issue.14 , pp. 3401-3424
    • Gougar, H.1    Cho, S.2    Prabhu, V.3
  • 7
    • 0030106944 scopus 로고
    • The classification of FMS scheduling problems
    • 10.1080/00207549608904925
    • J Liu BL MacCarthy 1993 The classification of FMS scheduling problems Int J Prod Res 34 3 647 656 10.1080/00207549608904925
    • (1993) Int J Prod Res , vol.34 , Issue.3 , pp. 647-656
    • Liu, J.1    MacCarthy, B.L.2
  • 8
    • 0032000897 scopus 로고    scopus 로고
    • A study of scheduling rules of flexible manufacturing systems: A simulation approach
    • 0949.90656 10.1080/002075498193877
    • I Sabuncuoglu 1998 A study of scheduling rules of flexible manufacturing systems: a simulation approach Int J Prod Res 36 2 527 546 0949.90656 10.1080/002075498193877
    • (1998) Int J Prod Res , vol.36 , Issue.2 , pp. 527-546
    • Sabuncuoglu, I.1
  • 9
    • 0025416939 scopus 로고
    • Analysis of scheduling rules for an FMS
    • 10.1080/00207549008942754
    • M Montazeri L Van Wassenhove 1990 Analysis of scheduling rules for an FMS Int J Prod Res 28 4 785 802 10.1080/00207549008942754
    • (1990) Int J Prod Res , vol.28 , Issue.4 , pp. 785-802
    • Montazeri, M.1    Van Wassenhove, L.2
  • 10
    • 0027591340 scopus 로고
    • Decision models for tool management in automated manufacturing
    • 10.1287/mnsc.39.5.549
    • AE Gray A Seidmann KE Stecke 1993 Decision models for tool management in automated manufacturing Manage Sci 39 5 549 567 10.1287/mnsc.39.5.549
    • (1993) Manage Sci , vol.39 , Issue.5 , pp. 549-567
    • Gray, A.E.1    Seidmann, A.2    Stecke, K.E.3
  • 11
    • 0013324531 scopus 로고
    • Automated tool management in flexible manufacturing
    • 10.1016/0278-6125(85)90003-2
    • HA ElMaraghy 1985 Automated tool management in flexible manufacturing J Manuf Syst 4 1 13 10.1016/0278-6125(85)90003-2
    • (1985) J Manuf Syst , vol.4 , pp. 1-13
    • Elmaraghy, H.A.1
  • 12
    • 0022750519 scopus 로고
    • Tool sharing in an FMS-a feasibility study
    • 10.1016/0167-188X(87)90068-1
    • GJ Gaalman WM Nawijn LW Platzer 1987 Tool sharing in an FMS-a feasibility study Eng Costs Prod Econom 12 107 115 10.1016/0167-188X(87)90068-1
    • (1987) Eng Costs Prod Econom , vol.12 , pp. 107-115
    • Gaalman, G.J.1    Nawijn, W.M.2    Platzer, L.W.3
  • 13
    • 0024716540 scopus 로고
    • Real time tool control and job dispatching in flexible manufacturing systems
    • 10.1080/00207548908942621
    • MH Han KN Yoon LH Gary 1989 Real time tool control and job dispatching in flexible manufacturing systems Int J Prod Res 27 8 1257 1267 10.1080/00207548908942621
    • (1989) Int J Prod Res , vol.27 , Issue.8 , pp. 1257-1267
    • Han, M.H.1    Yoon, K.N.2    Gary, L.H.3
  • 14
    • 0029760756 scopus 로고    scopus 로고
    • Analysis of tool sharing in an FMS: A simulation study
    • 10.1016/0360-8352(95)00020-8
    • AS Kashyap SK Khator 1996 Analysis of tool sharing in an FMS: a simulation study Comput Ind 30 1 137 145 10.1016/0360-8352(95)00020-8
    • (1996) Comput Ind , vol.30 , Issue.1 , pp. 137-145
    • Kashyap, A.S.1    Khator, S.K.2
  • 15
    • 0031332099 scopus 로고    scopus 로고
    • Tool planning models for flexible manufacturing systems
    • 0921.90081 10.1016/S0377-2217(96)00251-2
    • ZM Mohamed JJ Bernardo 1997 Tool planning models for flexible manufacturing systems Eur J Oper Res 103 3 497 514 0921.90081 10.1016/S0377-2217(96)00251-2
    • (1997) Eur J Oper Res , vol.103 , Issue.3 , pp. 497-514
    • Mohamed, Z.M.1    Bernardo, J.J.2
  • 16
    • 0031275801 scopus 로고    scopus 로고
    • Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter
    • 0942.90542 10.1080/002075497194255
    • HK Roh YD Kim 1997 Due-date based loading and scheduling methods for a flexible manufacturing system with an automatic tool transporter Int J Prod Res 35 11 2989 3003 0942.90542 10.1080/002075497194255
    • (1997) Int J Prod Res , vol.35 , Issue.11 , pp. 2989-3003
    • Roh, H.K.1    Kim, Y.D.2
  • 17
    • 0032311540 scopus 로고    scopus 로고
    • Real-time control and scheduling of flexible manufacturing systems: An ordinal optimization based approach
    • 10.1007/BF01438229
    • C Peng FF Chen 1998 Real-time control and scheduling of flexible manufacturing systems: an ordinal optimization based approach Int J Adv Manuf Tech 14 775 786 10.1007/BF01438229
    • (1998) Int J Adv Manuf Tech , vol.14 , pp. 775-786
    • Peng, C.1    Chen, F.F.2
  • 18
    • 0035708657 scopus 로고    scopus 로고
    • Tool requirements planning in a flexible manufacturing system with an automatic tool transporter
    • 10.1109/70.975993
    • KYD Lee CSK GC SK Lim 2001 Tool requirements planning in a flexible manufacturing system with an automatic tool transporter IEEE Trans Robot Automa 17 6 795 804 10.1109/70.975993
    • (2001) IEEE Trans Robot Automa , vol.17 , Issue.6 , pp. 795-804
    • Lee, K.Y.D.1    K, G.C.C.S.2    Lim, S.K.3
  • 19
    • 0036069575 scopus 로고    scopus 로고
    • The state of the art in simulation study on FMS scheduling: A comprehensive survey
    • 10.1007/s001700200095
    • FTS Chan HK Chan HCW Lau 2002 The state of the art in simulation study on FMS scheduling: a comprehensive survey Int J Adv Manuf Tech 19 11 830 849 10.1007/s001700200095
    • (2002) Int J Adv Manuf Tech , vol.19 , Issue.11 , pp. 830-849
    • Chan, F.T.S.1    Chan, H.K.2    Lau, H.C.W.3
  • 20
    • 0038243040 scopus 로고    scopus 로고
    • Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation
    • 10.1016/S0360-8352(03)00019-6
    • CS Lee SS Kim JS Choi 2003 Operation sequence and tool selection in flexible manufacturing systems under dynamic tool allocation Comput Ind 45 61 73 10.1016/S0360-8352(03)00019-6
    • (2003) Comput Ind , vol.45 , pp. 61-73
    • Lee, C.S.1    Kim, S.S.2    Choi, J.S.3
  • 21
    • 0344898438 scopus 로고    scopus 로고
    • Scheduling decisions in FMS using a heuristic approach
    • 10.1007/s00170-002-1474-0
    • NA Haq T Karthikeyan M Dinesh 2003 Scheduling decisions in FMS using a heuristic approach Int J Adv Manu Tech 22 5-6 374 379 10.1007/s00170-002-1474-0
    • (2003) Int J Adv Manu Tech , vol.22 , Issue.56 , pp. 374-379
    • Haq, N.A.1    Karthikeyan, T.2    Dinesh, M.3
  • 22
    • 0037274883 scopus 로고    scopus 로고
    • Effects of dispatching and routeing decisions on the performance of a flexible manufacturing system
    • 10.1007/s001700300038
    • FTS Chan 2003 Effects of dispatching and routeing decisions on the performance of a flexible manufacturing system Int J Adv Manuf Tech 21 328 338 10.1007/s001700300038
    • (2003) Int J Adv Manuf Tech , vol.21 , pp. 328-338
    • Chan, F.T.S.1
  • 23
    • 0142216504 scopus 로고    scopus 로고
    • Real-time scheduling with deadlock avoidance in flexible manufacturing systems
    • 10.1007/s00170-002-1468-y
    • TY EIMekkawy HA EIMaraghy 2003 Real-time scheduling with deadlock avoidance in flexible manufacturing systems Int J Adv Manuf Tech 22 259 270 10.1007/s00170-002-1468-y
    • (2003) Int J Adv Manuf Tech , vol.22 , pp. 259-270
    • Eimekkawy, T.Y.1    Eimaraghy, H.A.2
  • 24
    • 7044233479 scopus 로고    scopus 로고
    • Impact of operation flexibility and dispatching rules on the performance of a flexible manufacturing system
    • 10.1007/s00170-003-1594-1
    • FTS Chan 2004 Impact of operation flexibility and dispatching rules on the performance of a flexible manufacturing system Int J Adv Manuf Tech 24 447 459 10.1007/s00170-003-1594-1
    • (2004) Int J Adv Manuf Tech , vol.24 , pp. 447-459
    • Chan, F.T.S.1
  • 25
    • 42949132332 scopus 로고    scopus 로고
    • Controlling flexible manufacturing systems based on a dynamic selection of the appropriate operational criteria and scheduling policy
    • 05772869 10.1007/s10696-006-9001-5
    • B Shnits D Sinreich 2006 Controlling flexible manufacturing systems based on a dynamic selection of the appropriate operational criteria and scheduling policy Int J Flex Manuf Syst 18 1 27 05772869 10.1007/s10696-006-9001-5
    • (2006) Int J Flex Manuf Syst , vol.18 , pp. 1-27
    • Shnits, B.1    Sinreich, D.2
  • 26
    • 63049137316 scopus 로고    scopus 로고
    • A simulation analysis of controlling rules for flexible pull systems
    • 10.1504/IJMR.2006.011961
    • MC Yu TJ Greene 2006 A simulation analysis of controlling rules for flexible pull systems Int J Manuf Res 1 3 314 331 10.1504/IJMR.2006.011961
    • (2006) Int J Manuf Res , vol.1 , Issue.3 , pp. 314-331
    • Yu, M.C.1    Greene, T.J.2
  • 27
    • 0028406902 scopus 로고
    • Metamodels in manufacturing: A review
    • 0901.90123 10.1080/00207549408956970
    • B Yu K Popplewell 1994 Metamodels in manufacturing: a review Int J Prod Res 32 787 796 0901.90123 10.1080/00207549408956970
    • (1994) Int J Prod Res , vol.32 , pp. 787-796
    • Yu, B.1    Popplewell, K.2
  • 28
    • 0003067640 scopus 로고
    • An investigation of due date assignment rules with constraint tightness
    • 10.1016/0272-6963(81)90014-0
    • KR Baker JWM Betrand 1981 An investigation of due date assignment rules with constraint tightness J Oper Manage 1 3 109 120 10.1016/0272-6963(81)90014-0
    • (1981) J Oper Manage , vol.1 , Issue.3 , pp. 109-120
    • Baker, K.R.1    Betrand, J.W.M.2
  • 29
    • 33947593937 scopus 로고    scopus 로고
    • Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine flexible manufacturing systems
    • 10.1016/j.rcim.2006.02.013
    • KN Suresh R Sridharan 2007 Simulation modeling and analysis of tool sharing and part scheduling decisions in single-stage multimachine flexible manufacturing systems Robot Comput Integr Manuf 23 361 370 10.1016/j.rcim.2006. 02.013
    • (2007) Robot Comput Integr Manuf , vol.23 , pp. 361-370
    • Suresh, K.N.1    Sridharan, R.2
  • 30
    • 0002112447 scopus 로고
    • The statistical analysis of simulation results
    • S.S. Lavenberg (eds). Academic New York
    • Welch PD (1983) The statistical analysis of simulation results. In: Lavenberg SS (ed) The computer performance modeling handbook. Academic, New York
    • (1983) The Computer Performance Modeling Handbook
    • Welch, P.D.1
  • 33
    • 0002337285 scopus 로고    scopus 로고
    • A methodology for fitting and validating metamodels in simulation
    • 0985.65007 10.1016/S0377-2217(98)00392-0
    • JPC Kleijnen RG Sargent 2000 A methodology for fitting and validating metamodels in simulation Euro J Oper Res 120 1 14 29 0985.65007 10.1016/S0377-2217(98)00392-0
    • (2000) Euro J Oper Res , vol.120 , Issue.1 , pp. 14-29
    • Kleijnen, J.P.C.1    Sargent, R.G.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.