Volumn 15, Issue 4, 2009, Pages 377-385

Contractor prequalification model using fuzzy sets

Author keywords

Contractor; Fuzzy sets; Prequalification

Indexed keywords

CONTRACTOR PRE-QUALIFICATION; DECISION MAKERS; FUZZY SETS THEORY; MODEL-BASED; NUMERICAL EXAMPLE; PRE-QUALIFICATION; PRE-QUALIFICATION MODELS;

EID: 73349113523     PISSN: 13923730     EISSN: 18223605     Source Type: Journal    
DOI: 10.3846/1392-3730.2009.15.377-385     Document Type: Article
Times cited : (97)

References (39)
  • 1
    • 0035197791 scopus 로고    scopus 로고
    • Application of the AHP in project management
    • DOI 10.1016/S0263-7863(99)00038-1
    • Al-Harbi, K. M. 2001. Application of the AHP in project management, International Journal of Project Management 19: 19-27. doi: 10.1016/S0263- 7863(99)00038-1. (Pubitemid 32020455)
    • (2001) International Journal of Project Management , vol.19 , Issue.1 , pp. 19-27
    • Al-Harbi, K.M.A.-S.1
  • 2
    • 70350634865 scopus 로고    scopus 로고
    • Multi-objective contractor's ranking by applying the MOORA method
    • doi: 10.3846/1611-1699.2008.9.245-255
    • Brauers, W. K. M.; Zavadskas, E. K.; Turskis, Z.; Vilutienė, T. 2008. Multi-objective contractor's ranking by applying the MOORA method, Journal of Business Economics and Management 9(4): 245-255. doi: 10.3846/1611-1699. 2008.9.245-255.
    • (2008) Journal of Business Economics and Management , vol.9 , Issue.4 , pp. 245-255
    • Brauers, W.K.M.1    Zavadskas, E.K.2    Turskis, Z.3    Vilutiene, T.4
  • 3
    • 33751261580 scopus 로고    scopus 로고
    • Classifying construction contractors using unsupervised-learning neural networks
    • doi: 10.1061/(ASCE)0733-9364(2006)132: 12(1242)
    • Elazouni, A. M. 2006. Classifying construction contractors using unsupervised-learning neural networks, Journal of Construction Engineering and Management 132(12): 1242-1253. doi: 10.1061/(ASCE)0733-9364(2006)132: 12(1242).
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.12 , pp. 1242-1253
    • Elazouni, A.M.1
  • 4
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytical hierarchy process
    • doi: 10.1080/014461900407356
    • Fong Sik-Wah, P.; Choi Kit-Young, S. 2000. Final contractor selection using the analytical hierarchy process, Construction Management and Economics 18: 547-557. doi: 10.1080/014461900407356.
    • (2000) Construction Management and Economics , vol.18 , pp. 547-557
    • Fong Sik-Wah, P.1    Choi Kit-Young, S.2
  • 5
    • 0000771440 scopus 로고    scopus 로고
    • Assessment and evaluation of contractor data against client goals using PERT approach
    • doi: 10.1080/014461997372881
    • Hatush, Z.; Skitmore, M. 1997a. Assessment and evaluation of contractor data against client goals using PERT approach, Construction Management and Economics 15: 327-340. doi: 10.1080/014461997372881.
    • (1997) Construction Management and Economics , vol.15 , pp. 327-340
    • Hatush, Z.1    Skitmore, M.2
  • 6
    • 0000942012 scopus 로고    scopus 로고
    • Evaluating contractor prequali-fication data: Selection criteria and project success factors
    • doi: 10.1080/01446199700000002
    • Hatush, Z.; Skitmore, M. 1997b. Evaluating contractor prequali-fication data: selection criteria and project success factors, Construction Management and Economics 15: 129-147. doi: 10.1080/01446199700000002.
    • (1997) Construction Management and Economics , vol.15 , pp. 129-147
    • Hatush, Z.1    Skitmore, M.2
  • 8
    • 0342327410 scopus 로고
    • An efficiently structured approach for selection of most promising construction contractors
    • Jaselskis, E. J.; Russell, J. S. 1991. An efficiently structured approach for selection of most promising construction contractors, Project Management Journal 12(4): 31-39.
    • (1991) Project Management Journal , vol.12 , Issue.4 , pp. 31-39
    • Jaselskis, E.J.1    Russell, J.S.2
  • 9
    • 1342337557 scopus 로고    scopus 로고
    • Prequalification and multi-criteria selection: A measure of contractors' opinions
    • doi: 10.1080/014461998371944
    • Jennings, P.; Holt, G. D. 1998. Prequalification and multi-criteria selection: a measure of contractors' opinions, Construction Management and Economics 16: 651-660. doi: 10.1080/014461998371944.
    • (1998) Construction Management and Economics , vol.16 , pp. 651-660
    • Jennings, P.1    Holt, G.D.2
  • 12
    • 84993073505 scopus 로고    scopus 로고
    • Neural network model for contractors' prequalification for local authority projects
    • Khosrowshahi, F. 1999. Neural network model for contractors' prequalification for local authority projects, Engine, 315-328.
    • (1999) Engine , pp. 315-328
    • Khosrowshahi, F.1
  • 14
    • 0035282199 scopus 로고    scopus 로고
    • A fuzzy neural network approach for contractor prequalification
    • DOI 10.1080/01446190150505108
    • Lam, K. C.; Hu, T.; Ng, S. T.; Skitmore, M.; Cheung, S. O. 2001. A fuzzy neural network approach for contractor prequalification, Construction Management and Economics 19: 175-180. doi: 10.1080/01446190150505108. (Pubitemid 32228859)
    • (2001) Construction Management and Economics , vol.19 , Issue.2 , pp. 175-188
    • Lam, K.C.1    Hu, T.2    Ng, S.T.3    Skitmore, M.4    Cheoung, S.O.5
  • 15
    • 25844517320 scopus 로고    scopus 로고
    • Using the principal component analysis method as a tool in contractor pre-qualification
    • DOI 10.1080/01446190500041263
    • Lam, K. C.; Hu, T.; Ng, S. T. 2005. Using the principal component analysis method as a tool in contractor pre-qualification, Construction Management and Economics 23: 673-684. doi: 10.1080/01446190500041263. (Pubitemid 41388507)
    • (2005) Construction Management and Economics , vol.23 , Issue.7 , pp. 673-684
    • Lam, K.C.1    Hu, T.S.2    Ng, S.T.3
  • 17
    • 84860498580 scopus 로고    scopus 로고
    • A multi-criteria approach to contractor selection, engineering
    • doi: 10.1046/j.1365-232X.2002.00228.x
    • Mahdi, I. M.; Riley, M. J.; Fereig, S. M.; Alex, A. P. 2002. A multi-criteria approach to contractor selection, Engineering, Construction and Architectural Management 9(1): 29-37. doi: 10.1046/j.1365-232X.2002.00228.x.
    • (2002) Construction and Architectural Management , vol.9 , Issue.1 , pp. 29-37
    • Mahdi, I.M.1    Riley, M.J.2    Fereig, S.M.3    Alex, A.P.4
  • 18
  • 19
    • 53349122307 scopus 로고    scopus 로고
    • Reasoned decisions in construction contracts evaluation
    • doi: 10.3846/1392-8619.2008.14.402-416
    • Mitkus, S.; Trinkūnienė, E. 2008. Reasoned decisions in construction contracts evaluation, Technological and Economic Development of Economy 14(3): 402-416. doi: 10.3846/1392-8619.2008.14.402-416.
    • (2008) Technological and Economic Development of Economy , vol.14 , Issue.3 , pp. 402-416
    • Mitkus, S.1    Trinkuniene, E.2
  • 20
    • 0022128664 scopus 로고
    • Tender evaluation by fuzzy sets
    • doi: 10.1061/(ASCE)0733-9364(1985)111: 3(231)
    • Nguyen, V. U. 1985. Tender evaluation by fuzzy sets, Journal of Construction Engineering and Management 111: 231-243. doi: 10.1061/(ASCE)0733- 9364(1985)111: 3(231).
    • (1985) Journal of Construction Engineering and Management , vol.111 , pp. 231-243
    • Nguyen, V.U.1
  • 21
    • 16644393246 scopus 로고    scopus 로고
    • Web-based client advisory decision support system for design-builder pre-qualification
    • doi: 10.1061/(ASCE)0887-3801(2005)19: 1(69)
    • Palaneeswaran, E.; Kumaraswamy, M. 2005. Web-based client advisory decision support system for design-builder pre-qualification, Journal of Computing in Civil Engineering 19(1): 69-82. doi: 10.1061/(ASCE)0887-3801(2005) 19: 1(69).
    • (2005) Journal of Computing in Civil Engineering , vol.19 , Issue.1 , pp. 69-82
    • Palaneeswaran, E.1    Kumaraswamy, M.2
  • 22
    • 0344032254 scopus 로고    scopus 로고
    • TenSeM: A multicriteria and multidecision-makers' model in tender evaluation
    • DOI 10.1080/0144619032000065090
    • Pongpeng, J.; Liston, J. 2003a. TenSeM: a multicritria and multidecision-makers' model in tender evaluation, Construction Management and Economics 21: 21-30. doi: 10.1080/0144619032000065090. (Pubitemid 41716145)
    • (2003) Construction Management and Economics , vol.21 , Issue.1 , pp. 21-30
    • Pongpeng, J.1    Liston, J.2
  • 23
    • 0344121708 scopus 로고    scopus 로고
    • A multicriteria model's survey: State of the art and some necessary capabilities of future models
    • DOI 10.1080/0144619032000093288
    • Pongpeng, J.; Liston, J. 2003b. A multicriteria model's survey: state of the art and some necessary capabilities of future models, Construction Management and Economics 21: 665-670. doi: 10.1080/0144619032000093288. (Pubitemid 37436375)
    • (2003) Construction Management and Economics , vol.21 , Issue.7 , pp. 665-670
    • Pongpeng, J.1    Liston, J.2
  • 24
    • 62149084858 scopus 로고    scopus 로고
    • Criteria of contractor selection used by polish investors
    • Scientific Papers of the Institute of Building Engineering of the Wroclaw University of Tech-nology, 91
    • Plebankiewicz, E. 2008. Criteria of contractor selection used by Polish investors, Scientific Papers of the Institute of Building Engineering of the Wroclaw University of Technology, 91, Technology and Management in Building Engineering, 121-129.
    • (2008) Technology and Management in Building Engineering , pp. 121-129
    • Plebankiewicz, E.1
  • 25
    • 0042951149 scopus 로고
    • Decision models for analysis and evaluation of construction contractors
    • doi: 10.1080/01446199200000018
    • Russell, J. S. 1992. Decision models for analysis and evaluation of construction contractors, Construction Management and Economics 10: 185-202. doi: 10.1080/01446199200000018.
    • (1992) Construction Management and Economics , vol.10 , pp. 185-202
    • Russell, J.S.1
  • 26
    • 0038279070 scopus 로고
    • Contractor prequalification data for construction owners
    • doi: 10.1080/01446199200000012
    • Russell, J. S.; Hancher, D. E.; Skibniewski, M. J. 1992. Contractor prequalification data for construction owners, Construction Management and Economics 10: 117-135. doi: 10.1080/01446199200000012.
    • (1992) Construction Management and Economics , vol.10 , pp. 117-135
    • Russell, J.S.1    Hancher, D.E.2    Skibniewski, M.J.3
  • 27
    • 0028401477 scopus 로고
    • Automated corrective action selection assistant
    • doi: 10.1061/(ASCE)0733-9364(1994)120: 1(11)
    • Russel, J. S.; Fayek, A. 1994. Automated corrective action selection assistant, Journal of Construction Engineering and Management, ASCE 120(1): 11-33. doi: 10.1061/(ASCE)0733-9364(1994)120: 1(11).
    • (1994) Journal of Construction Engineering and Management, ASCE , vol.120 , Issue.1 , pp. 11-33
    • Russel, J.S.1    Fayek, A.2
  • 28
    • 0025220842 scopus 로고
    • QUALIFIER-1: Contractor prequalification model
    • doi: 10.1061/(ASCE)0887-3801(1990)4: 1(77)
    • Russell, J. S.; Skibniewski, M. J. 1990. QUALIFIER-1: Contractor prequalification model, Journal of Computing in Civil Engineering 4(1): 77-90. doi: 10.1061/(ASCE)0887-3801(1990)4: 1(77).
    • (1990) Journal of Computing in Civil Engineering , vol.4 , Issue.1 , pp. 77-90
    • Russell, J.S.1    Skibniewski, M.J.2
  • 29
    • 0025398528 scopus 로고
    • QUALIFIER-2: Knowledge-based system for contractor prequalification
    • doi: 10.1061/(ASCE)0733-9364(1990)116: 1(157)
    • Russell, J. S.; Skibniewski, M. J.; Cozier, D. R. 1990. QUALIFIER-2: Knowledge-based system for contractor prequalification, Journal of Construction Engineering and Management 116(1): 157-171. doi: 10.1061/(ASCE)0733-9364(1990) 116: 1(157).
    • (1990) Journal of Construction Engineering and Management , vol.116 , Issue.1 , pp. 157-171
    • Russell, J.S.1    Skibniewski, M.J.2    Cozier, D.R.3
  • 30
    • 12344271940 scopus 로고    scopus 로고
    • A fuzzy decision framework for contractor selection
    • doi: 10.1061/(ASCE)0733-9364(2005)131: 1(62)
    • Singh, D.; Tiong, R. L. K. 2005. A fuzzy decision framework for contractor selection, Journal of Construction Engineering and Management 131(1): 62-70. doi: 10.1061/(ASCE)0733-9364(2005)131: 1(62).
    • (2005) Journal of Construction Engineering and Management , vol.131 , Issue.1 , pp. 62-70
    • Singh, D.1    Tiong, R.L.K.2
  • 31
    • 33747347789 scopus 로고    scopus 로고
    • Contractor selection criteria: Investigation of opinions of Singapore construction practitioners
    • doi: 10.1061/(ASCE)0733-9364(2006)132: 9(998)
    • Singh, D.; Tiong, R. L. K. 2006. Contractor selection criteria: investigation of opinions of Singapore construction practitioners, Journal of Construction Engineering and Management 132(9): 998-1008. doi: 10.1061/(ASCE)0733-9364(2006)132: 9(998).
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.9 , pp. 998-1008
    • Singh, D.1    Tiong, R.L.K.2
  • 32
    • 47149101108 scopus 로고    scopus 로고
    • Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique
    • doi: 10.3846/1392-8619.2008.14.224-239
    • Turskis, Z. 2008. Multi-attribute contractors ranking method by applying ordering of feasible alternatives of solutions in terms of preferability technique, Technological and Economic Development of Economy 14(2): 224-239. doi: 10.3846/1392-8619.2008.14.224-239.
    • (2008) Technological and Economic Development of Economy , vol.14 , Issue.2 , pp. 224-239
    • Turskis, Z.1
  • 33
    • 33746190822 scopus 로고    scopus 로고
    • Price and nonprice criteria for contractor selection
    • doi: 10.1061/(ASCE)0733-9364(2006)132: 8(797)
    • Waara, F.; Brochner, J. 2006. Price and nonprice criteria for contractor selection, Journal of Construction Engineering and Management 132(8): 797-804. doi: 10.1061/(ASCE)0733-9364(2006)132: 8(797).
    • (2006) Journal of Construction Engineering and Management , vol.132 , Issue.8 , pp. 797-804
    • Waara, F.1    Brochner, J.2
  • 35
    • 54149111585 scopus 로고    scopus 로고
    • Multi-attribute decision-making methods for assessment of quality in bridges and road construction: State-of-the-art surveys
    • doi: 10.3846/1822-427X.2008.3.152-160
    • Zavadskas, E. K.; Liias, R.; Turskis, Z. 2008a. Multi-attribute decision-making methods for assessment of quality in bridges and road construction: state-of-the-art surveys, The Baltic Journal of Road and Bridge Engineering 3(3): 152-160. doi: 10.3846/1822-427X.2008.3.152-160.
    • (2008) The Baltic Journal of Road and Bridge Engineering , vol.3 , Issue.3 , pp. 152-160
    • Zavadskas, E.K.1    Liias, R.2    Turskis, Z.3
  • 36
    • 57849118192 scopus 로고    scopus 로고
    • Contractor selection of construction in a competitive environment
    • doi: 10.3846/1611-1699.2008.9.181-187
    • Zavadskas, E. K.; Turskis, Z.; Tamošaitienė, J. 2008b. Contractor selection of construction in a competitive environment, Journal of Business Economics and Management 9(3): 181-187. doi: 10.3846/1611-1699.2008.9. 181-187.
    • (2008) Journal of Business Economics and Management , vol.9 , Issue.3 , pp. 181-187
    • Zavadskas, E.K.1    Turskis, Z.2    Tamošaitiene, J.3
  • 37
    • 30444458522 scopus 로고    scopus 로고
    • A multiple criteria evaluation of multi-family apartment block's maintenance contractors: I - Model for maintenance contractor evaluation and the determination of its selection criteria
    • DOI 10.1016/j.buildenv.2005.02.019, PII S0360132305000995
    • Zavadskas, E. K.; Vilutienė, T. 2006. A multiple criteria evaluation of multi-family apartment block's maintenance contractors: I - Model for maintenance contractor evaluation and the determination of its selection criteria, Building and Environment 41(5): 621-632. doi: 10.1016/j.buildenv.2005. 02.019. (Pubitemid 43071551)
    • (2006) Building and Environment , vol.41 , Issue.5 , pp. 621-632
    • Zavadskas, E.K.1    Vilutiene, T.2
  • 39
    • 34248666540 scopus 로고
    • Fuzzy sets
    • doi: 10.1016/S0019-9958(65)90241-X
    • Zadeh, L. H. 1965. Fuzzy sets, Information and Control 8(3): 338-353. doi: 10.1016/S0019-9958(65)90241-X.
    • (1965) Information and Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.H.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.