-
1
-
-
0034398493
-
A blackboard software architecture for integrated intelligent control systems
-
Abbod M.F., Linkens D.A., Browne A blackboard software architecture for integrated intelligent control systems. Kybernetes. 29(7/8):2000;999-1015.
-
(2000)
Kybernetes
, vol.29
, Issue.7-8
, pp. 999-1015
-
-
Abbod, M.F.1
Linkens, D.A.2
Browne3
-
2
-
-
1242284867
-
Wrestling with trade, energy, and new markets
-
Berry B. Wrestling with trade, energy, and new markets. New Steel. 17(7):2001;20-23.
-
(2001)
New Steel
, vol.17
, Issue.7
, pp. 20-23
-
-
Berry, B.1
-
3
-
-
1242284864
-
A simulation approach to manage finished good inventory replenishment economically in a mixed push/pull environment
-
Bertolini M., Rizzi A. A simulation approach to manage finished good inventory replenishment economically in a mixed push/pull environment. Logistics Information Management. 15(4):2002;291-293.
-
(2002)
Logistics Information Management
, vol.15
, Issue.4
, pp. 291-293
-
-
Bertolini, M.1
Rizzi, A.2
-
5
-
-
0034413334
-
Intelligent systems for optimisation and control
-
Burnham K.J., Haas O.C.L., James D.J.G. Intelligent systems for optimisation and control. Kybernetes. 29(5/6):2000;716-732.
-
(2000)
Kybernetes
, vol.29
, Issue.5-6
, pp. 716-732
-
-
Burnham, K.J.1
Haas, O.C.L.2
James, D.J.G.3
-
7
-
-
0038789162
-
A flexible decision support system for steel hot rolling mill scheduling
-
Cowling P. A flexible decision support system for steel hot rolling mill scheduling. Computers and Industrial Engineering. 45:2003;408-421.
-
(2003)
Computers and Industrial Engineering
, vol.45
, pp. 408-421
-
-
Cowling, P.1
-
8
-
-
0030577310
-
What are fuzzy rules and how to use them
-
Dubois D., Prade H. What are fuzzy rules and how to use them. Fuzzy Sets and Systems. 84(2):1996;169-185.
-
(1996)
Fuzzy Sets and Systems
, vol.84
, Issue.2
, pp. 169-185
-
-
Dubois, D.1
Prade, H.2
-
9
-
-
0037410423
-
Fuzzy scheduling: Modelling flexible constraints vs. coping with incomplete knowledge
-
Dubois D., Fargier H., Fortemps P. Fuzzy scheduling. modelling flexible constraints vs. coping with incomplete knowledge European Journal of Operational Research. 147(2):2003;231-252.
-
(2003)
European Journal of Operational Research
, vol.147
, Issue.2
, pp. 231-252
-
-
Dubois, D.1
Fargier, H.2
Fortemps, P.3
-
11
-
-
1242284863
-
Weirton's rolling-mil/roll-shop partnership
-
Greissel M. Weirton's rolling-mil/roll-shop partnership. New Steel. 15(2):1999;56.
-
(1999)
New Steel
, vol.15
, Issue.2
, pp. 56
-
-
Greissel, M.1
-
12
-
-
0031997813
-
Fuzzy set theory applications in production management research: A literature survey
-
Guiffrida A.L., Nagi R. Fuzzy set theory applications in production management research. a literature survey Journal of Intelligent Manufacturing. 9(1):1998;39-56.
-
(1998)
Journal of Intelligent Manufacturing
, vol.9
, Issue.1
, pp. 39-56
-
-
Guiffrida, A.L.1
Nagi, R.2
-
14
-
-
0030102183
-
Primary production scheduling at steelmaking industries
-
Lee H.S., Murthy S.S., Haider S.W., Morse D.V. Primary production scheduling at steelmaking industries. IBM Journal of Research and Development. 40(2):1996;231-252.
-
(1996)
IBM Journal of Research and Development
, vol.40
, Issue.2
, pp. 231-252
-
-
Lee, H.S.1
Murthy, S.S.2
Haider, S.W.3
Morse, D.V.4
-
19
-
-
0042363413
-
Integrating industrial maintenance strategy into ERP
-
Nikolopoulos K., Metaxiotis K., Lekatis N., Assimakopoulos V. Integrating industrial maintenance strategy into ERP. Industrial Management and Data Systems. 103(3):2003;184-191.
-
(2003)
Industrial Management and Data Systems
, vol.103
, Issue.3
, pp. 184-191
-
-
Nikolopoulos, K.1
Metaxiotis, K.2
Lekatis, N.3
Assimakopoulos, V.4
-
20
-
-
1242329681
-
Scheduling smarter to reduce inventories
-
Ninneman P. Scheduling smarter to reduce inventories. New Steel. 13(3):1997;66.
-
(1997)
New Steel
, vol.13
, Issue.3
, pp. 66
-
-
Ninneman, P.1
-
21
-
-
0034135449
-
Life of rolls in a cold rolling mill in a steel plant-operation versus manufacture
-
Ray A.K., Mishra K.K., Das G., Chaudhary P.N. Life of rolls in a cold rolling mill in a steel plant-operation versus manufacture. Engineering Failure Analysis. 7(1):2000;55-67.
-
(2000)
Engineering Failure Analysis
, vol.7
, Issue.1
, pp. 55-67
-
-
Ray, A.K.1
Mishra, K.K.2
Das, G.3
Chaudhary, P.N.4
-
22
-
-
10844292682
-
Reaching for maximum flexibility
-
Ritt A. Reaching for maximum flexibility. New Steel. 16(1):2000;20.
-
(2000)
New Steel
, vol.16
, Issue.1
, pp. 20
-
-
Ritt, A.1
-
23
-
-
0001141613
-
Fuzzy sets and decision analysis
-
Roubens M. Fuzzy sets and decision analysis. Fuzzy Sets and Systems. 90(2):1997;199-206.
-
(1997)
Fuzzy Sets and Systems
, vol.90
, Issue.2
, pp. 199-206
-
-
Roubens, M.1
-
24
-
-
0033881797
-
Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms
-
Sakawa M., Kubota R. Fuzzy programming for multiobjective job shop scheduling with fuzzy processing time and fuzzy due date through genetic algorithms. European Journal of Operational Research. 120(2):2000;393-407.
-
(2000)
European Journal of Operational Research
, vol.120
, Issue.2
, pp. 393-407
-
-
Sakawa, M.1
Kubota, R.2
-
25
-
-
0032592176
-
An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate
-
Sakawa M., Mori T. An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate. Computers and Industrial Engineering. 36(2):1999;325-341.
-
(1999)
Computers and Industrial Engineering
, vol.36
, Issue.2
, pp. 325-341
-
-
Sakawa, M.1
Mori, T.2
-
26
-
-
0033226070
-
Workshop scheduling using practical (inaccurate) data. Part: 2: The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach
-
Shafei K., Brunn P. Workshop scheduling using practical (inaccurate) data. Part: 2. The performance of heuristic scheduling rules in a dynamic job shop environment using a rolling time horizon approach International Journal of Production Research. 37(17):1999;3913-3925.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.17
, pp. 3913-3925
-
-
Shafei, K.1
Brunn, P.2
-
27
-
-
0034301351
-
A fuzzy decision support system for equipment repair under battle conditions
-
Simoes-Marques M., Ribeiro R.A., Gameiro-Marques A. A fuzzy decision support system for equipment repair under battle conditions. Fuzzy Sets and Systems. 115(1):2000;141-157.
-
(2000)
Fuzzy Sets and Systems
, vol.115
, Issue.1
, pp. 141-157
-
-
Simoes-Marques, M.1
Ribeiro, R.A.2
Gameiro-Marques, A.3
-
28
-
-
0035899628
-
A review of planning and scheduling systems and methods for integrated steel production
-
Tang L., Liu J., Rong A., Yang Z. A review of planning and scheduling systems and methods for integrated steel production. European Journal of Operational Research. 133(1):2001;1-20.
-
(2001)
European Journal of Operational Research
, vol.133
, Issue.1
, pp. 1-20
-
-
Tang, L.1
Liu, J.2
Rong, A.3
Yang, Z.4
-
29
-
-
0032805128
-
JIT production planning approach with fuzzy due date for OKP manufacturing systems
-
Wang W., Wang D., Ip W.H. JIT production planning approach with fuzzy due date for OKP manufacturing systems. International Journal of Production Economics. 58(2):1999;209-215.
-
(1999)
International Journal of Production Economics
, vol.58
, Issue.2
, pp. 209-215
-
-
Wang, W.1
Wang, D.2
Ip, W.H.3
-
30
-
-
0035395299
-
A fuzzy mathematics based optimal delivery scheduling approach
-
Xue D., Wang H., Norrie D.H. A fuzzy mathematics based optimal delivery scheduling approach. Computers in Industry. 45(3):2001;245-259.
-
(2001)
Computers in Industry
, vol.45
, Issue.3
, pp. 245-259
-
-
Xue, D.1
Wang, H.2
Norrie, D.H.3
-
31
-
-
0041732082
-
Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines
-
Yi Y., Wang D.W. Soft computing for scheduling with batch setup times and earliness-tardiness penalties on parallel machines. Journal of Intelligent Manufactoring. 14(3-4):2003;311-322.
-
(2003)
Journal of Intelligent Manufactoring
, vol.14
, Issue.3-4
, pp. 311-322
-
-
Yi, Y.1
Wang, D.W.2
|