Volumn 37, Issue 12, 2010, Pages 8499-8507

Applying fuzzy goal programming to project management decisions with multiple goals in uncertain environments

Author keywords

Fuzzy goal programming; Fuzzy sets; Multi objective linear programming; Project management

Indexed keywords

BUDGET CONTROL; COMPUTER PROGRAMMING; COSTS; ENVIRONMENTAL MANAGEMENT; FUZZY SETS; LINEAR PROGRAMMING; MATHEMATICAL PROGRAMMING; MULTIOBJECTIVE OPTIMIZATION; PROJECT MANAGEMENT;

EID: 77957842436     PISSN: 09574174     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.eswa.2010.05.026     Document Type: Article
Times cited : (44)

References (65)
  • 2
    • 0035314168 scopus 로고    scopus 로고
    • Application of fuzzy goal programming to a multiobjective project network problem
    • DOI 10.1016/S0165-0114(99)00119-0
    • Arikan, F., & Gungor, Z. (2001). An application of fuzzy goal programming to a multiobjective project network problem. Fuzzy Sets and Systems, 119, 49-58. (Pubitemid 32091789)
    • (2001) Fuzzy Sets and Systems , vol.119 , Issue.1 , pp. 49-58
    • Arikan Feyzan1    Gungor Zulal2
  • 3
    • 0346636333 scopus 로고
    • Decision-making in a fuzzy environment
    • Bellman, R. E., & Zadeh, L. A. (1970). Decision-making in a fuzzy environment. Management Science, 17, 141-164.
    • (1970) Management Science , vol.17 , pp. 141-164
    • Bellman, R.E.1    Zadeh, L.A.2
  • 4
    • 77957831286 scopus 로고
    • G. W. Evans, W. Karwowski, & M. R. Wilhelm (Eds.) (1st ed.. Application of fuzzy set methodologies in industrial engineering (Vol. 1, pp. 104-115). Amsterdam: Elsevier)
    • Buckley, J. J. (1989). Fuzzy PERT. In G. W. Evans, W. Karwowski, & M. R. Wilhelm (Eds.) (1st ed.. Application of fuzzy set methodologies in industrial engineering (Vol. 1, pp. 104-115). Amsterdam: Elsevier.
    • (1989) Fuzzy PERT
    • Buckley, J.J.1
  • 6
    • 0035885517 scopus 로고    scopus 로고
    • Critical path analysis in the network with fuzzy activity times
    • Chanas, S., & Zieliń ski, P. (2001). Critical path analysis in the network with fuzzy activity times. Fuzzy Sets and Systems, 122, 195-204.
    • (2001) Fuzzy Sets and Systems , vol.122 , pp. 195-204
    • Chanas, S.1    Zieliński, P.2
  • 7
    • 0029482986 scopus 로고
    • An efficient approach for large project planning based on fuzzy Delphi method
    • Chang, I. S., Tsujimuta, Y., Gen, M., & Tozawa, T. (1995). An efficient approach for large project planning based on fuzzy Delphi method. Fuzzy Sets and Systems, 76, 277-288.
    • (1995) Fuzzy Sets and Systems , vol.76 , pp. 277-288
    • Chang, I.S.1    Tsujimuta, Y.2    Gen, M.3    Tozawa, T.4
  • 8
    • 29344452896 scopus 로고    scopus 로고
    • Order-fulfillment ability analysis in the supplychain system with fuzzy operation times
    • Chen, C. T., & Huang, S. F. (2006). Order-fulfillment ability analysis in the supplychain system with fuzzy operation times. International Journal of Production Economics, 101, 185-193.
    • (2006) International Journal of Production Economics , vol.101 , pp. 185-193
    • Chen, C.T.1    Huang, S.F.2
  • 9
    • 0035899776 scopus 로고    scopus 로고
    • Fuzzy goal programming with different important and priorities
    • Chen, L. H., & Tsai, F. C. (2001). Fuzzy goal programming with different important and priorities. European Journal of Operational Research, 133, 548-556.
    • (2001) European Journal of Operational Research , vol.133 , pp. 548-556
    • Chen, L.H.1    Tsai, F.C.2
  • 10
    • 0016498438 scopus 로고
    • A comparison of heuristic and optimum solutions in resource- constrained project scheduling
    • Davis, E. W., & Patterson, J. H. (1975). A comparison of heuristic and optimum solutions in resource- constrained project scheduling. Management Science, 21, 944-955.
    • (1975) Management Science , vol.21 , pp. 944-955
    • Davis, E.W.1    Patterson, J.H.2
  • 11
    • 38249024695 scopus 로고
    • Resource constrained project crashing
    • Deckor, R. F., & Hebert, J. E. (1989). Resource constrained project crashing. Omega, 17, 69-79.
    • (1989) Omega , vol.17 , pp. 69-79
    • Deckor, R.F.1    Hebert, J.E.2
  • 12
    • 0025671729 scopus 로고
    • Optimization of project network problem with goal programming and fuzzy linear programming
    • DePorter, E. L., & Ellis, K. P. (1990). Optimization of project network problem with goal programming and fuzzy linear programming. Computers and Industrial Engineering, 19, 500-504.
    • (1990) Computers and Industrial Engineering , vol.19 , pp. 500-504
    • DePorter, E.L.1    Ellis, K.P.2
  • 14
    • 0030575225 scopus 로고    scopus 로고
    • Refinements of the maximin approach to decision-making in a fuzzy environment
    • Dubois, D., Fargier, H., & Prade, H. (1996). Refinements of the maximin approach to decision-making in a fuzzy environment. Fuzzy Sets and Systems, 81, 103-122.
    • (1996) Fuzzy Sets and Systems , vol.81 , pp. 103-122
    • Dubois, D.1    Fargier, H.2    Prade, H.3
  • 15
    • 0032666849 scopus 로고    scopus 로고
    • Computing improved optimal solutions to max- min flexible constraint satisfaction problems
    • Dubois, D., & Fortemps, P. (1999). Computing improved optimal solutions to max- min flexible constraint satisfaction problems. European Journal of Operational Research, 118, 95-126.
    • (1999) European Journal of Operational Research , vol.118 , pp. 95-126
    • Dubois, D.1    Fortemps, P.2
  • 16
    • 0008559997 scopus 로고
    • Algorithm for project scheduling with resource constraints
    • Elsayed, E. A. (1982). Algorithm for project scheduling with resource constraints. Fuzzy Sets and Systems, 20, 95-103.
    • (1982) Fuzzy Sets and Systems , vol.20 , pp. 95-103
    • Elsayed, E.A.1
  • 18
    • 0032120296 scopus 로고    scopus 로고
    • A heuristic for network project scheduling with random activity durations depending on the resource allocation
    • Golenko-Ginzburz, D., & Goink, A. (1998). A heuristic for network project scheduling with random activity durations depending on the resource allocation. International Journal of Production Economics, 55, 149-162.
    • (1998) International Journal of Production Economics , vol.55 , pp. 149-162
    • Golenko-Ginzburz, D.1    Goink, A.2
  • 19
    • 0040370432 scopus 로고    scopus 로고
    • Two-phase approach for solving the fuzzy linear programming problems
    • Guu, S. M., & Wu, Y. K. (1999). Two-phase approach for solving the fuzzy linear programming problems. Fuzzy Sets and Systems, 107, 191-195.
    • (1999) Fuzzy Sets and Systems , vol.107 , pp. 191-195
    • Guu, S.M.1    Wu, Y.K.2
  • 20
    • 0000559267 scopus 로고
    • Linear programming with multiple fuzzy goals
    • Hannan, E. L. (1981). Linear programming with multiple fuzzy goals. Fuzzy Sets and Systems, 6, 235-248.
    • (1981) Fuzzy Sets and Systems , vol.6 , pp. 235-248
    • Hannan, E.L.1
  • 21
    • 0030286425 scopus 로고    scopus 로고
    • Fuzzy priority heuristic for project scheduling
    • Hapke, M., & Slowinski, R. (1996). Fuzzy priority heuristic for project scheduling. Fuzzy Sets and Systems, 83, 291-299.
    • (1996) Fuzzy Sets and Systems , vol.83 , pp. 291-299
    • Hapke, M.1    Slowinski, R.2
  • 22
    • 0029209748 scopus 로고
    • A fuzzy dynamic approach to the multicriterion resource allocation problem
    • Hussein, M., & Abo-Sinna, M. A. (1995). A fuzzy dynamic approach to the multicriterion resource allocation problem. Fuzzy Sets and Systems, 69, 115-124.
    • (1995) Fuzzy Sets and Systems , vol.69 , pp. 115-124
    • Hussein, M.1    Abo-Sinna, M.A.2
  • 23
    • 0001418264 scopus 로고
    • Economic optimization of construction project scheduling
    • Karshenas, S., & Haber, D. (1990). Economic optimization of construction project scheduling. Construction Management and Economics, 8, 135-146.
    • (1990) Construction Management and Economics , vol.8 , pp. 135-146
    • Karshenas, S.1    Haber, D.2
  • 25
    • 0015667795 scopus 로고
    • Another look at the PERT assumptions
    • Kotiah, T. C. T., & Wallace, N. D. (1973). Another look at the PERT assumptions. Management Science, 20, 44-49.
    • (1973) Management Science , vol.20 , pp. 44-49
    • Kotiah, T.C.T.1    Wallace, N.D.2
  • 26
    • 0020087944 scopus 로고
    • MULTI-PROJECT SCHEDULING: CATEGORIZATION OF HEURISTIC RULES PERFORMANCE.
    • Kurtulus, I., & Davis, E. W. (1982). Multi-project scheduling categorization of heuristic rules performance. Management Science, 28, 161-172. (Pubitemid 12523655)
    • (1982) Management Science , vol.28 , Issue.2 , pp. 161-172
    • Kurtulus, I.1    Davis, E.W.2
  • 27
    • 0030217529 scopus 로고    scopus 로고
    • On the multi-objective linear programming problem: Goal programming approach
    • Kuwano, H. L. (1996). On the multi-objective linear programming problem: Goal programming approach. Fuzzy Sets and Systems, 82, 57-64.
    • (1996) Fuzzy Sets and Systems , vol.82 , pp. 57-64
    • Kuwano, H.L.1
  • 29
    • 43549085961 scopus 로고
    • On finding compromise solutions in multicriteria problems using the fuzzy min-operator
    • Leberling, H. (1981). On finding compromise solutions in multicriteria problems using the fuzzy min-operator. Fuzzy Sets and Systems, 6, 105-118.
    • (1981) Fuzzy Sets and Systems , vol.6 , pp. 105-118
    • Leberling, H.1
  • 30
    • 30244562641 scopus 로고
    • Fuzzy multiple objective programming and computing programming with Pareto optimum
    • Lee, E. S., & Li, R. J. (1993). Fuzzy multiple objective programming and computing programming with Pareto optimum. Fuzzy Sets and Systems, 53, 275-283.
    • (1993) Fuzzy Sets and Systems , vol.53 , pp. 275-283
    • Lee, E.S.1    Li, R.J.2
  • 31
    • 0029204768 scopus 로고
    • Scheduling to minimize the total resource consumption with a constant on the sum of completion times
    • Li, C. C. (1995). Scheduling to minimize the total resource consumption with a constant on the sum of completion times. European Journal of Operational Research, 80, 381-388.
    • (1995) European Journal of Operational Research , vol.80 , pp. 381-388
    • Li, C.C.1
  • 32
    • 34548391394 scopus 로고    scopus 로고
    • Project management decisions using fuzzy linear programming
    • Liang, T. F. (2006). Project management decisions using fuzzy linear programming. International Journal of Systems Science, 37, 1141-1152.
    • (2006) International Journal of Systems Science , vol.37 , pp. 1141-1152
    • Liang, T.F.1
  • 33
    • 61849173413 scopus 로고    scopus 로고
    • Application of fuzzy sets to multi-objective project management decisions in uncertain environments
    • Liang, T. F. (2009). Application of fuzzy sets to multi-objective project management decisions in uncertain environments. International Journal of General System, 38, 311-330.
    • (2009) International Journal of General System , vol.38 , pp. 311-330
    • Liang, T.F.1
  • 34
    • 34247345761 scopus 로고    scopus 로고
    • Multiobjective resource allocation problem by multistage decision-based hybrid genetic algorithm
    • Lin, C. M., & Gen, M. (2007). Multiobjective resource allocation problem by multistage decision-based hybrid genetic algorithm. Applied Mathematics and Computation, 187, 574-583.
    • (2007) Applied Mathematics and Computation , vol.187 , pp. 574-583
    • Lin, C.M.1    Gen, M.2
  • 35
    • 33645794778 scopus 로고    scopus 로고
    • Computing efficient solutions to fuzzy multiple objective linear programming problems
    • Li, X. Q., Zhang, B., & Li, H. (2006). Computing efficient solutions to fuzzy multiple objective linear programming problems. Fuzzy Sets and Systems, 157, 1328-1332.
    • (2006) Fuzzy Sets and Systems , vol.157 , pp. 1328-1332
    • Li, X.Q.1    Zhang, B.2    Li, H.3
  • 36
    • 49349090365 scopus 로고    scopus 로고
    • Fuzzy critical chain method for project scheduling under resource constraints and uncertainty
    • Long, L. D., & Ohsato, A. (2008). Fuzzy critical chain method for project scheduling under resource constraints and uncertainty. International Journal of Project Management, 26, 688-698.
    • (2008) International Journal of Project Management , vol.26 , pp. 688-698
    • Long, L.D.1    Ohsato, A.2
  • 38
    • 0020186942 scopus 로고
    • Compensatory operators in fuzzy programming with multiple objectives
    • Luhandjula, M. K. (1982). Compensatory operators in fuzzy programming with multiple objectives. Fuzzy Sets and Systems, 8, 245-252.
    • (1982) Fuzzy Sets and Systems , vol.8 , pp. 245-252
    • Luhandjula, M.K.1
  • 39
    • 0006017595 scopus 로고
    • On the estimation of errors introduce by standard assumptions concerning the distribution of activity duration in PERT calculations
    • Lukaszewicz, J. (1965). On the estimation of errors introduce by standard assumptions concerning the distribution of activity duration in PERT calculations. Operations Research, 13, 326-327.
    • (1965) Operations Research , vol.13 , pp. 326-327
    • Lukaszewicz, J.1
  • 40
    • 0002641538 scopus 로고
    • An analytical study of the PERT assumptions
    • MacCrimmon, K. R., & Ryavec, V. A. (1964). An analytical study of the PERT assumptions. Operations Research, 12, 16-37.
    • (1964) Operations Research , vol.12 , pp. 16-37
    • MacCrimmon, K.R.1    Ryavec, V.A.2
  • 41
    • 0022750364 scopus 로고
    • Fuzzy resource allocation
    • Mjelde, K. M. (1986). Fuzzy resource allocation. Fuzzy Sets and Systems, 19, 239-250.
    • (1986) Fuzzy Sets and Systems , vol.19 , pp. 239-250
    • Mjelde, K.M.1
  • 42
    • 0001499521 scopus 로고    scopus 로고
    • A shortest path problem on a network with fuzzy arc lengths
    • Okada, S., & Soper, T. (2000). A shortest path problem on a network with fuzzy arc lengths. Fuzzy Sets and Systems, 109, 129-140.
    • (2000) Fuzzy Sets and Systems , vol.109 , pp. 129-140
    • Okada, S.1    Soper, T.2
  • 43
    • 35348980157 scopus 로고    scopus 로고
    • A two-phase methodology for multi-objective supplier evaluation and order allocation problems
    • Özgen D., Önut S., Gülsün B., Tuzkaya U.R., Tuzkaya G., 2008, A two-phase methodology for multi-objective supplier evaluation and order allocation problems, Information Sciences, 178, 485-500.
    • (2008) Information Sciences , vol.178 , pp. 485-500
    • Özgen, D.1    Önut, S.2    Gülsün, B.3    Tuzkaya, U.R.4    Tuzkaya, G.5
  • 44
    • 11144304606 scopus 로고
    • The use of the compound Poisson in PERT
    • Parks, W. J., & Ramsing, K. D. (1969). The use of the compound Poisson in PERT. Management Science, 15, 397-402.
    • (1969) Management Science , vol.15 , pp. 397-402
    • Parks, W.J.1    Ramsing, K.D.2
  • 45
    • 33749564779 scopus 로고    scopus 로고
    • A new heuristic for resourceconstrained project scheduling networks using critical chain concept
    • Rabbani, M., Ghomi, F., Jolai, F., & Lahiji, N. S. (2007). A new heuristic for resourceconstrained project scheduling networks using critical chain concept. European Journal of Operational Research, 176, 794-808.
    • (2007) European Journal of Operational Research , vol.176 , pp. 794-808
    • Rabbani, M.1    Ghomi, F.2    Jolai, F.3    Lahiji, N.S.4
  • 47
    • 0022794872 scopus 로고
    • A comparison of heuristics scheduling projects with cash flows and resource restrictions
    • Russell, R. A. (1986). A comparison of heuristics scheduling projects with cash flows and resource restrictions. Management Science, 32, 1291-1300.
    • (1986) Management Science , vol.32 , pp. 1291-1300
    • Russell, R.A.1
  • 48
    • 38249028725 scopus 로고
    • An interactive fuzzy satisfying method for multiobjective linear fractional programming problems
    • Sakawa, M. (1988). An interactive fuzzy satisfying method for multiobjective linear fractional programming problems. Fuzzy Sets and Systems, 28, 129-144.
    • (1988) Fuzzy Sets and Systems , vol.28 , pp. 129-144
    • Sakawa, M.1
  • 50
    • 0022750496 scopus 로고
    • A multicriteria fuzzy linear programming method for water supply system development planning
    • Slowinski, R. (1986). A multicriteria fuzzy linear programming method for water supply system development planning. Fuzzy Sets and Systems, 19, 217-237.
    • (1986) Fuzzy Sets and Systems , vol.19 , pp. 217-237
    • Slowinski, R.1
  • 52
    • 17444424494 scopus 로고    scopus 로고
    • Decision making using modified Scurve membership function in fuzzy linear programming problem
    • Vasant, P., Nagarajan, R., & Yaacob, S. (2002). Decision making using modified Scurve membership function in fuzzy linear programming problem. Journal of Information and Communication Technology, 2, 1-16.
    • (2002) Journal of Information and Communication Technology , vol.2 , pp. 1-16
    • Vasant, P.1    Nagarajan, R.2    Yaacob, S.3
  • 53
    • 0343496853 scopus 로고    scopus 로고
    • Using metaheuristics in multiobjective resource constrained project scheduling
    • Viana, A., & Sousa, deJ. P. (2000). Using metaheuristics in multiobjective resource constrained project scheduling. European Journal of Operational Research, 120, 359-374.
    • (2000) European Journal of Operational Research , vol.120 , pp. 359-374
    • Viana, A.1    Sousa2    De, J.P.3
  • 55
    • 11944259647 scopus 로고    scopus 로고
    • Project management decisions with multiple fuzzy goals
    • Wang, R. C., & Liang, T. F. (2004). Project management decisions with multiple fuzzy goals. Construction Management and Economics, 22, 1047-1056.
    • (2004) Construction Management and Economics , vol.22 , pp. 1047-1056
    • Wang, R.C.1    Liang, T.F.2
  • 57
    • 0023381033 scopus 로고
    • An interactive fuzzy programming system
    • Weners, B. (1987). An interactive fuzzy programming system. Fuzzy Sets and Systems, 23, 131-147.
    • (1987) Fuzzy Sets and Systems , vol.23 , pp. 131-147
    • Weners, B.1
  • 60
    • 0000543297 scopus 로고
    • Fuzzy and stochastic programming
    • Yazenin, A. V. (1987). Fuzzy and stochastic programming. Fuzzy Sets and Systems, 22, 171-180.
    • (1987) Fuzzy Sets and Systems , vol.22 , pp. 171-180
    • Yazenin, A.V.1
  • 61
    • 41249084562 scopus 로고    scopus 로고
    • Optimal multiple-objective resources allocation using hybrid particle swarm optimization and adaptive resources bounds technique
    • Yin, P. Y., & Wang, J. U. (2008). Optimal multiple-objective resources allocation using hybrid particle swarm optimization and adaptive resources bounds technique. Journal of Computational and Applied Mathematics, 15, 73-86.
    • (2008) Journal of Computational and Applied Mathematics , vol.15 , pp. 73-86
    • Yin, P.Y.1    Wang, J.U.2
  • 62
    • 34248666540 scopus 로고
    • Information and Control
    • Zadeh, L. A. (1965). Fuzzy sets. Information and Control, 8, 338-353.
    • (1965) Fuzzy Sets , vol.8 , pp. 338-353
    • Zadeh, L.A.1
  • 64
    • 49349136235 scopus 로고
    • Fuzzy programming and linear programming with several objective functions
    • Zimmermann, H.-J. (1978). Fuzzy programming and linear programming with several objective functions. Fuzzy Sets and Systems, 1, 45-56.
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 45-56
    • Zimmermann, H.-J.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.