Volumn 135, Issue 2, 2009, Pages 88-95

Float allocation using the total risk approach

Author keywords

Construction industry; Construction management; Contracts; Risk management; Scheduling

Indexed keywords

CONSTRUCTION INDUSTRY; PRODUCT LIABILITY; PROJECT MANAGEMENT; RISK ANALYSIS; RISK MANAGEMENT; SCHEDULING;

EID: 58449104091     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2009)135:2(88)     Document Type: Article
Times cited : (31)

References (17)
  • 2
    • 33846968505 scopus 로고    scopus 로고
    • Total float management for delay analysis
    • Al-Gahtani, K. S., and Mohan, S. B. (2007). " Total float management for delay analysis.." Cost Eng., 49 (2), 32-37.
    • (2007) Cost Eng. , vol.49 , Issue.2 , pp. 32-37
    • Al-Gahtani, K.S.1    Mohan, S.B.2
  • 3
    • 32644462382 scopus 로고    scopus 로고
    • Selecting a delay analysis method in resolving construction claims
    • Arditi, D., and Pattanakitchamroon, T. (2006). " Selecting a delay analysis method in resolving construction claims.." Int. J. Proj. Manage., 24 (2), 145-155.
    • (2006) Int. J. Proj. Manage. , vol.24 , Issue.2 , pp. 145-155
    • Arditi, D.1    Pattanakitchamroon, T.2
  • 6
    • 0031153881 scopus 로고    scopus 로고
    • Optimization of float use in risk analysis-based network scheduling
    • Gong, D. (1997). " Optimization of float use in risk analysis-based network scheduling.." Int. J. Proj. Manage., 15 (3), 187-192.
    • (1997) Int. J. Proj. Manage. , vol.15 , Issue.3 , pp. 187-192
    • Gong, D.1
  • 7
    • 0040389217 scopus 로고
    • Time-uncertainty analysis in project networks with a new merge-event time-estimation technique
    • Gong, D., and Hugsted, R. (1993). " Time-uncertainty analysis in project networks with a new merge-event time-estimation technique.." Int. J. Proj. Manage., 11 (3), 165-173.
    • (1993) Int. J. Proj. Manage. , vol.11 , Issue.3 , pp. 165-173
    • Gong, D.1    Hugsted, R.2
  • 8
    • 0009810148 scopus 로고
    • Calculation of safe float use in risk-analysis-oriented network scheduling
    • ".
    • Gong, D., Rowings, J., and James, E. (1995). " Calculation of safe float use in risk-analysis-oriented network scheduling.." Int. J. Proj. Manage., 13 (3), 187-194.
    • (1995) Int. J. Proj. Manage. , vol.13 , Issue.3 , pp. 187-194
    • Gong, D.1    Rowings, J.2    James, E.3
  • 12
    • 0022801823 scopus 로고
    • Float ownership: Specs treatment
    • Ponce de Leon, G. (1986). " Float ownership: Specs treatment.." Cost Eng., 28 (10), 12-15.
    • (1986) Cost Eng. , vol.28 , Issue.10 , pp. 12-15
    • Ponce De Leon, G.1
  • 14
    • 9244264950 scopus 로고    scopus 로고
    • New trends and bad results in construction contracts: Part i
    • ".
    • Shumway, R., Richard, A., and Ritti, J. (2004). " New trends and bad results in construction contracts: Part I.." Leadership Manage. Eng., 4 (3), 93-98.
    • (2004) Leadership Manage. Eng. , vol.4 , Issue.3 , pp. 93-98
    • Shumway, R.1    Richard, A.2    Ritti, J.3
  • 15
    • 0026850714 scopus 로고
    • Schedule games' people play, and some suggested remedies
    • Zack, J. G., Jr. (1992). " Schedule games' people play, and some suggested remedies..'" J. Manage. Eng., 8 (2), 138-152.
    • (1992) J. Manage. Eng. , vol.8 , Issue.2 , pp. 138-152
    • Zack Jr., J.G.1
  • 16
    • 0034227806 scopus 로고    scopus 로고
    • Pacing delays-The practical effect
    • Zack, J. G., Jr. (2000). " Pacing delays-The practical effect.." Cost Eng., 42 (7), 23-28.
    • (2000) Cost Eng. , vol.42 , Issue.7 , pp. 23-28
    • Zack Jr., J.G.1
  • 17
    • 13944266018 scopus 로고    scopus 로고
    • New method for calculating path float in program evaluation and review technique (PERT)
    • Zhong, D. H., and Zhang, J. S. (2003). " New method for calculating path float in program evaluation and review technique (PERT).." J. Constr. Eng. Manage., 129 (5), 501-506.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.5 , pp. 501-506
    • Zhong, D.H.1    Zhang, J.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.