Key constraints analysis with integrated production scheduler

Author keywords

Constraints; Critical path method; Lean construction; Scheduling

Indexed keywords

CONSTRAINTS; CRITICAL PATH METHOD; LEAN CONSTRUCTION; SCHEDULING TOOLS;

EID: 23044451467     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)0733-9364(2005)131:7(753)     Document Type: Article
Times cited : (27)

References (13)
  • 1
    • 0004011301 scopus 로고    scopus 로고
    • PhD dissertation, School of Civil Engineering, The Univ. of Birmingham, U.K.
    • Ballard, G. (2000). "The last planner system of production control." PhD dissertation, School of Civil Engineering, The Univ. of Birmingham, U.K. 〈http://leanconstruction.org/pdf/ballard2000-dissertation pdf〉
    • (2000) The Last Planner System of Production Control
    • Ballard, G.1
  • 2
    • 11644288742 scopus 로고    scopus 로고
    • Shielding production: Essential step in production control
    • Ballard, G., and Howell, G., (1998). "Shielding production: Essential step in production control." J. Constr. Eng. Manage., 124(1), 11-17.
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.1 , pp. 11-17
    • Ballard, G.1    Howell, G.2
  • 3
    • 13944281016 scopus 로고    scopus 로고
    • Constraint-based planning with integrated production scheduler over internet
    • Chua, D. H. K., Shen, L. J., and Bok, S. H. (2003). "Constraint-based planning with Integrated Production Scheduler over Internet." J. Constr. Eng. Manage., 129(3), 293-301.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 293-301
    • Chua, D.H.K.1    Shen, L.J.2    Bok, S.H.3
  • 5
    • 0004244246 scopus 로고
    • North River Press
    • Goldratt, E. (1992). The goal, North River Press.
    • (1992) The Goal
    • Goldratt, E.1
  • 7
    • 0003656231 scopus 로고
    • Application of the new production philosophy to construction
    • Dept. of Civil Engineering, Center for Integrated Facility Engineering, Stanford University, Stanford, Calif.
    • Koskela, L. (1992). "Application of the new production philosophy to construction." Tech. Rep. No. 72, Dept. of Civil Engineering, Center for Integrated Facility Engineering, Stanford University, Stanford, Calif.
    • (1992) Tech. Rep. No. 72 , vol.72
    • Koskela, L.1
  • 9
    • 0032376210 scopus 로고    scopus 로고
    • Theory of constraints: A review of the philosophy and its applications
    • Rahman, S. (1998). "Theory of constraints: A review of the philosophy and its applications." Int. J. Operat. Product. Manage., 18(4), 336-355.
    • (1998) Int. J. Operat. Product. Manage. , vol.18 , Issue.4 , pp. 336-355
    • Rahman, S.1
  • 10
    • 0035426806 scopus 로고    scopus 로고
    • An investigation into the fundamentals of critical chain project scheduling
    • Steyn, H. (2000). "An investigation into the fundamentals of critical chain project scheduling." Int. J. Proj. Manage., 19, 363-369.
    • (2000) Int. J. Proj. Manage. , vol.19 , pp. 363-369
    • Steyn, H.1
  • 11
    • 12344327099 scopus 로고    scopus 로고
    • Improving labor flow reliability for better productivity as lean construction principle
    • Thomas, H. R., Herman, J. M., Minchin, R. E., and Chen, D. (2003). "Improving labor flow reliability for better productivity as lean construction principle." J. Constr. Eng. Manage., 129(3), 251-261.
    • (2003) J. Constr. Eng. Manage. , vol.129 , Issue.3 , pp. 251-261
    • Thomas, H.R.1    Herman, J.M.2    Minchin, R.E.3    Chen, D.4
  • 12
    • 13944264416 scopus 로고    scopus 로고
    • Look-ahead planning: Screening and pulling
    • Civil and Environmental Engineering Dept., Univ. of California, Berkeley, Calif.
    • Tommelein, I. D., and Ballard, G. (1997). "Look-ahead planning: Screening and pulling." Tech. Rep. No. 97-9, Civil and Environmental Engineering Dept., Univ. of California, Berkeley, Calif.
    • (1997) Tech. Rep. No. 97-9 , vol.97 , Issue.9
    • Tommelein, I.D.1    Ballard, G.2
  • 13
    • 0036568674 scopus 로고    scopus 로고
    • Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects
    • Yeo, K. T., and Ning, J. H. (2002). "Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects." Int. J. Proj. Manage., 20, 253-262.
    • (2002) Int. J. Proj. Manage. , vol.20 , pp. 253-262
    • Yeo, K.T.1    Ning, J.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.