메뉴 건너뛰기




Volumn 38, Issue 2, 2011, Pages 582-590

Approximations of lead-time distributions in an assemble-to-order system under a base-stock policy

Author keywords

Assemble to order system; Base stock policy; Fork join network

Indexed keywords

ASSEMBLE-TO-ORDER; BASE STOCK POLICY; CLOSED-FORM FORMULAE; FORK-JOIN NETWORK; HEAVY TRAFFICS; KOLMOGOROV-SMIRNOV TEST; LEAD-TIME DISTRIBUTIONS; LINEAR COMBINATIONS; MULTIPLE COMPONENTS; POISSON ARRIVAL PROCESS; PRODUCTION SYSTEM; PRODUCTION TIME; SAMPLE DISTRIBUTIONS; SIMULATION EXPERIMENTS; TRAFFIC INTENSITY;

EID: 77956410518     PISSN: 03050548     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.cor.2010.07.020     Document Type: Article
Times cited : (6)

References (27)
  • 1
    • 0035426460 scopus 로고    scopus 로고
    • Optimal material control and performance evaluation in an assembly environment with component commonality
    • M. Agrawal, and M. Cohen Optimal material control and performance evaluation in an assembly environment with component commonality Naval Research Logistics 48 2001 409 429
    • (2001) Naval Research Logistics , vol.48 , pp. 409-429
    • Agrawal, M.1    Cohen, M.2
  • 2
    • 33845541662 scopus 로고    scopus 로고
    • Production and inventory control of a single product assemble-to-order system with multiple customer classes
    • S. Benjaafar, and M. ElHafsi Production and inventory control of a single product assemble-to-order system with multiple customer classes Management Science 52 2006 1896 1912
    • (2006) Management Science , vol.52 , pp. 1896-1912
    • Benjaafar, S.1    Elhafsi, M.2
  • 3
    • 0039854178 scopus 로고
    • An approximate analysis for a class of assembly-like queues
    • F. Bonomi An approximate analysis for a class of assembly-like queues Queuing Systems 1 1987 289 309
    • (1987) Queuing Systems , vol.1 , pp. 289-309
    • Bonomi, F.1
  • 5
    • 0000879068 scopus 로고
    • Optimal policies for a multi-echelon inventory problem
    • A.J. Clark, and H. Scarf Optimal policies for a multi-echelon inventory problem Management Science 6 1960 475 490
    • (1960) Management Science , vol.6 , pp. 475-490
    • Clark, A.J.1    Scarf, H.2
  • 6
    • 0345548368 scopus 로고    scopus 로고
    • The effectiveness of several performance bounds for capacitated production, partial-order-service, assemble-to-order systems
    • S. Dayanik, J.S. Song, and S.H.T. Xu The effectiveness of several performance bounds for capacitated production, partial-order-service, assemble-to-order systems Manufacturing & Service Operations Management 5 2003 230 251
    • (2003) Manufacturing & Service Operations Management , vol.5 , pp. 230-251
    • Dayanik, S.1    Song, J.S.2    Xu, S.H.T.3
  • 8
    • 56349092882 scopus 로고    scopus 로고
    • Coordination and synchronization of material flows in supply chains: An analytical approach
    • L. De Boeck, and N. Vandaele Coordination and synchronization of material flows in supply chains: an analytical approach International Journal of Production Economics 116 2008 199 207
    • (2008) International Journal of Production Economics , vol.116 , pp. 199-207
    • De Boeck, L.1    Vandaele, N.2
  • 11
    • 0021506349 scopus 로고
    • Two parallel queues created by arrivals with two demands i
    • L. Flatto, and S. Hahn Two parallel queues created by arrivals with two demands I SIAM Journal on Applied Mathematics 44 1984 1041 1053
    • (1984) SIAM Journal on Applied Mathematics , vol.44 , pp. 1041-1053
    • Flatto, L.1    Hahn, S.2
  • 12
    • 0035536034 scopus 로고    scopus 로고
    • A simple and effective component procurement policy for stochastic assembly systems
    • J. Gallien, and L. Wein A simple and effective component procurement policy for stochastic assembly systems Queueing Systems 38 2001 221 248
    • (2001) Queueing Systems , vol.38 , pp. 221-248
    • Gallien, J.1    Wein, L.2
  • 13
    • 0032202098 scopus 로고
    • Lead time-inventory trade-offs in assembly-to-order systems
    • P. Glasserman, and Y. Wang Lead time-inventory trade-offs in assembly-to-order systems Operations Research 46 1988 858 871
    • (1988) Operations Research , vol.46 , pp. 858-871
    • Glasserman, P.1    Wang, Y.2
  • 15
    • 0032169180 scopus 로고    scopus 로고
    • Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies
    • W.H. Hausman, H.L. Lee, and A.X. Zhang Joint demand fulfillment probability in a multi-item inventory system with independent order-up-to policies European Journal of Operations Research 109 1998 646 659
    • (1998) European Journal of Operations Research , vol.109 , pp. 646-659
    • Hausman, W.H.1    Lee, H.L.2    Zhang, A.X.3
  • 16
    • 0001632693 scopus 로고
    • Bounds and heuristics for assembly-like queues
    • W.J. Hopp, and J.T. Simon Bounds and heuristics for assembly-like queues Queuing Systems 4 1989 137 156
    • (1989) Queuing Systems , vol.4 , pp. 137-156
    • Hopp, W.J.1    Simon, J.T.2
  • 17
    • 7444268607 scopus 로고    scopus 로고
    • Response times in M/M/s fork-join networks
    • S. Ko, and R. Serfozo Response times in M/M/s fork-join networks Advances in Applied Probability 36 2004 854 871
    • (2004) Advances in Applied Probability , vol.36 , pp. 854-871
    • Ko, S.1    Serfozo, R.2
  • 19
    • 0024032823 scopus 로고
    • Approximation analysis of fork/join synchronization in parallel queues
    • R. Nelson, and A.N. Tantawi Approximation analysis of fork/join synchronization in parallel queues IEEE Transactions on Computers 37 1988 739 743
    • (1988) IEEE Transactions on Computers , vol.37 , pp. 739-743
    • Nelson, R.1    Tantawi, A.N.2
  • 20
    • 0024701994 scopus 로고
    • Optimal inventory policies for assembly systems under random demands
    • K. Rosling Optimal inventory policies for assembly systems under random demands Operations Research 37 1989 565 579
    • (1989) Operations Research , vol.37 , pp. 565-579
    • Rosling, K.1
  • 21
    • 0003778293 scopus 로고    scopus 로고
    • second ed. John Wiley & Sons, Inc. New York
    • S.M. Ross Stochastic processes second ed. 1996 John Wiley & Sons, Inc. New York
    • (1996) Stochastic Processes
    • Ross, S.M.1
  • 22
    • 0022131173 scopus 로고
    • Optimal policy for a two-stage assembly system under random demand
    • C.P. Schmidt, and S. Nahmias Optimal policy for a two-stage assembly system under random demand Operations Research 33 1985 1130 1145
    • (1985) Operations Research , vol.33 , pp. 1130-1145
    • Schmidt, C.P.1    Nahmias, S.2
  • 24
    • 0032201713 scopus 로고    scopus 로고
    • On the order fill rate in a multi-item, base-stock inventory system
    • J.S. Song On the order fill rate in a multi-item, base-stock inventory system Operations Research 46 1998 831 845
    • (1998) Operations Research , vol.46 , pp. 831-845
    • Song, J.S.1
  • 25
    • 0002779268 scopus 로고    scopus 로고
    • Order fulfillment performance measures in an assembly-to-order system with stochastic leadtimes
    • J.S. Song, S.H. Xu, and B. Liu Order fulfillment performance measures in an assembly-to-order system with stochastic leadtimes Operations Research 47 1999 131 149
    • (1999) Operations Research , vol.47 , pp. 131-149
    • Song, J.S.1    Xu, S.H.2    Liu, B.3
  • 26
    • 0036758161 scopus 로고    scopus 로고
    • Performance analysis and optimization in assemble-to-order systems with random leadtimes
    • J.S. Song, and D.D. Yao Performance analysis and optimization in assemble-to-order systems with random leadtimes Operations Research 50 2002 889 903
    • (2002) Operations Research , vol.50 , pp. 889-903
    • Song, J.S.1    Yao, D.D.2
  • 27
    • 33749502763 scopus 로고    scopus 로고
    • Performance analysis and evaluation of assembly-to-order systems with stochastic sequential lead times
    • Y. Zhao, and D. Simchi-Levi Performance analysis and evaluation of assembly-to-order systems with stochastic sequential lead times Operations Research 54 2006 706 724
    • (2006) Operations Research , vol.54 , pp. 706-724
    • Zhao, Y.1    Simchi-Levi, D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.