메뉴 건너뛰기




Volumn 6, Issue 3, 2010, Pages 289-303

A metaheuristic method for optimising inspection strategies in serial multistage processes

Author keywords

Inspection strategy; SA; Serial multistage process; Simulated annealing; Total inspection cost

Indexed keywords


EID: 77956385984     PISSN: 17466474     EISSN: 17466482     Source Type: Journal    
DOI: 10.1504/IJPQM.2010.035117     Document Type: Article
Times cited : (12)

References (27)
  • 1
    • 0030189573 scopus 로고    scopus 로고
    • Optimal allocation of inspection effort in a multi-stage production system
    • Bai, D.S. and Yun, H.J. (1996) 'Optimal allocation of inspection effort in a multi-stage production system', Computers and Industrial Engineering, Vol. 30, No. 3, pp.387-396.
    • (1996) Computers and Industrial Engineering , vol.30 , Issue.3 , pp. 387-396
    • Bai, D.S.1    Yun, H.J.2
  • 2
    • 0029752323 scopus 로고    scopus 로고
    • Control limits for multi-stage manufacturing processes with binomial yield (single and multiple production runs
    • Barad, M. and Braha, D. (1996) 'Control limits for multi-stage manufacturing processes with binomial yield (single and multiple production runs)', Journal of the Operational Research Society, Vol. 47, No. 1, pp.98-112.
    • (1996) Journal of the Operational Research Society , vol.47 , Issue.1 , pp. 98-112
    • Barad, M.1    Braha, D.2
  • 3
    • 85018104842 scopus 로고    scopus 로고
    • Pareto simulated annealing - A metaheuristic technique for multiple objective combinatorial optimization
    • Czyzak, P. and Jaszkiewicz, A. (1998) 'Pareto simulated annealing - a metaheuristic technique for multiple objective combinatorial optimization', Journal of Multi-Criteria Decision Analysis, Vol. 7, No. 1, pp.34-47.
    • (1998) Journal of Multi-criteria Decision Analysis , vol.7 , Issue.1 , pp. 34-47
    • Czyzak, P.1    Jaszkiewicz, A.2
  • 4
    • 0025449198 scopus 로고
    • Simulated annealing: A tool for operational research
    • Eglese, R.W. (1990) 'Simulated annealing: a tool for operational research', European Journal of Operational Research, Vol. 46, No. 3, pp.271-281.
    • (1990) European Journal of Operational Research , vol.46 , Issue.3 , pp. 271-281
    • Eglese, R.W.1
  • 5
    • 0036887768 scopus 로고    scopus 로고
    • Inspection allocation for multistage deteriorating production systems
    • Emmons, H.E. and Rabinowitz, G. (2002) 'Inspection allocation for multistage deteriorating production systems', IIE Transactions, Vol. 34, No. 12, pp.1031-1041.
    • (2002) IIE Transactions , vol.34 , Issue.12 , pp. 1031-1041
    • Emmons, H.E.1    Rabinowitz, G.2
  • 7
    • 33646392028 scopus 로고    scopus 로고
    • Costs and benefits of inspection systems and optimal inspection allocation for uniform defect propensity
    • Freiesleben, J. (2006) 'Costs and benefits of inspection systems and optimal inspection allocation for uniform defect propensity', International Journal of Quality & Reliability Management, Vol. 23, No. 5, pp.547-563.
    • (2006) International Journal of Quality & Reliability Management , vol.23 , Issue.5 , pp. 547-563
    • Freiesleben, J.1
  • 9
    • 26444479778 scopus 로고
    • Optimization by simulated annealing
    • Kirkpatrick, S., Gelatt, C.D. and Vecchi, M.P. (1983) 'Optimization by simulated annealing', Science, Vol. 220, No. 4598, pp.671-680.
    • (1983) Science , vol.220 , Issue.4598 , pp. 671-680
    • Kirkpatrick, S.1    Gelatt, C.D.2    Vecchi, M.P.3
  • 10
    • 0026417997 scopus 로고
    • A multiobjective approach to evaluating and planning the allocation of inspection resources
    • Klimberg, R., ReVelle, C. and Cohon, J. (1991) 'A multiobjective approach to evaluating and planning the allocation of inspection resources', European Journal of Operational Research, Vol. 52, No. 1, pp.55-64.
    • (1991) European Journal of Operational Research , vol.52 , Issue.1 , pp. 55-64
    • Klimberg, R.1    ReVelle, C.2    Cohon, J.3
  • 11
    • 0036604542 scopus 로고    scopus 로고
    • Optimal allocation of inspection effort over a finite planning horizon
    • Kogan, K. and Raz, T. (2002) 'Optimal allocation of inspection effort over a finite planning horizon', IIE Transactions, Vol. 34, No. 6, pp.515-527.
    • (2002) IIE Transactions , vol.34 , Issue.6 , pp. 515-527
    • Kogan, K.1    Raz, T.2
  • 12
    • 0002429995 scopus 로고
    • A survey of simulated annealing applications to operations - Research problems
    • Koulamas, C., Antony, S.R. and Jaen, R. (1994) 'A survey of simulated annealing applications to operations - research problems', Omega-International Journal of Management Science, Vol. 22, No. 1, pp.41-56.
    • (1994) Omega-International Journal of Management Science , vol.22 , Issue.1 , pp. 41-56
    • Koulamas, C.1    Antony, S.R.2    Jaen, R.3
  • 13
    • 0000140746 scopus 로고
    • Allocation of screening inspection effort - A dynamic programming approach
    • Lindsay, G.F. and Bishop, A.B. (1964) 'Allocation of screening inspection effort - a dynamic programming approach', Management Science, Vol. 10, No. 2, pp.342-352.
    • (1964) Management Science , vol.10 , Issue.2 , pp. 342-352
    • Lindsay, G.F.1    Bishop, A.B.2
  • 14
    • 66249118707 scopus 로고    scopus 로고
    • Quality improvement of multistage and multi-response grinding processes: An insight into two different methodologies for parameter optimization
    • Mukherjee, I. and Ray, P.K. (2009) 'Quality improvement of multistage and multi-response grinding processes: an insight into two different methodologies for parameter optimization', International Journal of Productivity and Quality Management, Vol. 4, Nos. 5/6, pp.613-643.
    • (2009) International Journal of Productivity and Quality Management , vol.4 , Issue.5-6 , pp. 613-643
    • Mukherjee, I.1    Ray, P.K.2
  • 15
    • 67349192556 scopus 로고    scopus 로고
    • Genetic algorithm modeling for the inspection allocation in reentrant production systems
    • Rau, H. and Cho, K-H. (2009) 'Genetic algorithm modeling for the inspection allocation in reentrant production systems', Expert Systems with Applications, Vol. 36, No. 8, pp.11287-11295.
    • (2009) Expert Systems with Applications , vol.36 , Issue.8 , pp. 11287-11295
    • Rau, H.1    Cho, K-H.2
  • 16
    • 18144400643 scopus 로고    scopus 로고
    • Inspection allocation planning with two types of workstation: WVD and WAD
    • Rau, H. and Chu, Y-H. (2005) 'Inspection allocation planning with two types of workstation: WVD and WAD', The International Journal of Advanced Manufacturing Technology, Vol. 25, Nos. 9-10, pp.947-953.
    • (2005) The International Journal of Advanced Manufacturing Technology , vol.25 , Issue.9-10 , pp. 947-953
    • Rau, H.1    Chu, Y-H.2
  • 17
    • 27844611316 scopus 로고    scopus 로고
    • Layer modeling for the inspection allocation problem in re-entrant production systems
    • Rau, H., Chu, Y-H. and Cho, K-H. (2005) 'Layer modeling for the inspection allocation problem in re-entrant production systems', International Journal of Production Research, Vol. 43, No. 17, pp.3633-3655.
    • (2005) International Journal of Production Research , vol.43 , Issue.17 , pp. 3633-3655
    • Rau, H.1    Chu, Y-H.2    Cho, K-H.3
  • 18
    • 0025748279 scopus 로고
    • A theoretical framework for simulated annealing
    • Romeo, F. and Sangiovanni-Vincentelli, A. (1991) 'A theoretical framework for simulated annealing', Algorithmica, Vol. 6, Nos. 1-6, pp.302-345.
    • (1991) Algorithmica , vol.6 , Issue.1-6 , pp. 302-345
    • Romeo, F.1    Sangiovanni-Vincentelli, A.2
  • 19
    • 0037708443 scopus 로고    scopus 로고
    • Inspection allocation planning for a multiple quality characteristic advanced manufacturing system
    • Shiau, Y-R. (2003a) 'Inspection allocation planning for a multiple quality characteristic advanced manufacturing system', The International Journal of Advanced Manufacturing Technology, Vol. 21, No. 7, pp.494-500.
    • (2003) The International Journal of Advanced Manufacturing Technology , vol.21 , Issue.7 , pp. 494-500
    • Shiau, Y-R.1
  • 20
    • 0346243614 scopus 로고    scopus 로고
    • Quick decision-making support for inspection allocation planning with rapidly changing customer requirements
    • Shiau, Y-R. (2003b) 'Quick decision-making support for inspection allocation planning with rapidly changing customer requirements', The International Journal of Advanced Manufacturing Technology, Vol. 22, Nos. 9-10, pp.633-640.
    • (2003) The International Journal of Advanced Manufacturing Technology , vol.22 , Issue.9-10 , pp. 633-640
    • Shiau, Y-R.1
  • 22
    • 77956365074 scopus 로고    scopus 로고
    • A method for determining cost-efficient inspection strategies in multistage production systems
    • Van Volsem, S. (2007) 'A method for determining cost-efficient inspection strategies in multistage production systems', 4OR: A Quarterly Journal of Operations Research, Vol. 5, No. 4, pp.343-346.
    • (2007) 4OR: A Quarterly Journal of Operations Research , vol.5 , Issue.4 , pp. 343-346
    • Van Volsem, S.1
  • 23
    • 33845922377 scopus 로고    scopus 로고
    • An evolutionary algorithm and discrete event simulation for optimizing strategies for multi-stage processes
    • Van Volsem, S., Dullaert, W. and Van Laneghem, H. (2007) 'An evolutionary algorithm and discrete event simulation for optimizing strategies for multi-stage processes', European Journal of Operational Research, Vol. 179, No. 3, pp.621-633.
    • (2007) European Journal of Operational Research , vol.179 , Issue.3 , pp. 621-633
    • Van Volsem, S.1    Dullaert, W.2    Van Laneghem, H.3
  • 24
    • 0027588564 scopus 로고
    • Flexible inspection systems for serial multi-stage production systems
    • Villalobos, J.R., Foster, J.W. and Disney, R.L. (1993) 'Flexible inspection systems for serial multi-stage production systems', IIE Transactions, Vol. 25, No. 3, pp.16-26.
    • (1993) IIE Transactions , vol.25 , Issue.3 , pp. 16-26
    • Villalobos, J.R.1    Foster, J.W.2    Disney, R.L.3
  • 25
    • 10444289915 scopus 로고    scopus 로고
    • Integrated production and product inspection policy for a deteriorating production system
    • Wang, C-H. (2005) 'Integrated production and product inspection policy for a deteriorating production system', International Journal of Production Economics, Vol. 95, No. 1, pp.123-134.
    • (2005) International Journal of Production Economics , vol.95 , Issue.1 , pp. 123-134
    • Wang, C-H.1
  • 26
    • 67349120968 scopus 로고    scopus 로고
    • Utilizing an approximative solution to obtain the real optimal solution for a production and inspection model
    • Wang, C-H. and Yeh, R.H. (2009) 'Utilizing an approximative solution to obtain the real optimal solution for a production and inspection model', Applied Mathematical Modeling, Vol. 33, No. 10, pp.3769-3775.
    • (2009) Applied Mathematical Modeling , vol.33 , Issue.10 , pp. 3769-3775
    • Wang, C-H.1    Yeh, R.H.2
  • 27
    • 0010820352 scopus 로고
    • Shortest route models for the allocation of inspection effort on a production line
    • White, L.S. (1969) 'Shortest route models for the allocation of inspection effort on a production line', Management Science, Vol. 15, No. 5, pp.249-259.
    • (1969) Management Science , vol.15 , Issue.5 , pp. 249-259
    • White, L.S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.