Volumn , Issue , 2010, Pages 246-256

A case study for integrating lean six-sigma and RFID applications in construction processes through simulation approach

Author keywords

[No Author keywords available]

Indexed keywords

BEFORE AND AFTER; CONSTRUCTION OPERATIONS; CONSTRUCTION PROCESS; CONSTRUCTION PROJECTS; CRITICAL POINTS; CURRENT CONSTRUCTION; CYCLE TIME; FEASIBLE SOLUTION; PROCESS LEVELS; PROJECT PERFORMANCE; QUALITATIVE ASPECTS; RADIO FREQUENCY IDENTIFICATION TECHNOLOGY; RF-ID TAGS; RFID APPLICATIONS; RFID READERS; RFID TECHNOLOGY; SIMULATION APPROACH; SIMULATION MODEL; SIX-SIGMA;

EID: 77956314472     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1061/41109(373)25     Document Type: Conference Paper
Times cited : (3)

References (15)
  • 2
    • 3242716315 scopus 로고    scopus 로고
    • White Paper 8, Lean Construction Institute, Calif.
    • Ballard, G. (2000). " Lean project delivery system. " White Paper No. 8, Lean Construction Institute, Calif., http://leanconstruction.org.
    • (2000) Lean Project Delivery System.
    • Ballard, G.1
  • 3
    • 39349114541 scopus 로고    scopus 로고
    • RFID+4D CAD for progress management of structural steel works in high-rise buildings
    • Chin, S., Yoon, S., Choi, C., and Cho, C. (2008). "RFID+4D CAD for progress management of structural steel works in high-rise buildings." J. Comput. in Civ. Engrg. 22(2), 74-89.
    • (2008) J. Comput. in Civ. Engrg. , vol.22 , Issue.2 , pp. 74-89
    • Chin, S.1    Yoon, S.2    Choi, C.3    Cho, C.4
  • 5
    • 70349636312 scopus 로고    scopus 로고
    • RFID in construction; Review of the current state of Radio Frequency Identification (RFID): Technology, its use and potential future use in construction
    • Erabuild, June/July
    • Erabuild (2006), " RFID in construction; review of the current state of Radio Frequency Identification (RFID): technology, its use and potential future use in construction", ERABUILD Final Report, June/July
    • (2006) ERABUILD Final Report
  • 6
    • 37249083919 scopus 로고    scopus 로고
    • Six sigma-based approach to improve performance in construction operations
    • Han, S. H., Chae, M. J., Im, K. S., and Ryu H. D. (2008). "Six sigma-based approach to improve performance in construction operations." J. Mgmt. in Engrg. 24(1), 21-31.
    • (2008) J. Mgmt. in Engrg. , vol.24 , Issue.1 , pp. 21-31
    • Han, S.H.1    Chae, M.J.2    Im, K.S.3    Ryu, H.D.4
  • 10
    • 37249024978 scopus 로고    scopus 로고
    • Imagine That., San Jose, Calif
    • Imagine That. (2002). User's guide for EXTND, San Jose, Calif.
    • (2002) User's Guide for EXTND
  • 12
    • 13944281379 scopus 로고    scopus 로고
    • Implementing Radio frequency identification in the construction process
    • Jaselskis, E. J., and El-Misalami, T. (2003) "Implementing Radio Frequency Identification in the Construction Process." J. Constr. Engrg. and Mgmt. 129(6), 680-688.
    • (2003) J. Constr. Engrg. and Mgmt. , vol.129 , Issue.6 , pp. 680-688
    • Jaselskis, E.J.1    El-Misalami, T.2
  • 14
    • 37249086508 scopus 로고    scopus 로고
    • Six sigma and lean manufacturing - A merger for world-class performance, but is it really talking place?
    • Kroslid, D. (2002). "Six sigma and lean manufacturing - A merger for world-class performance, but is it really talking place?" Asian J. Quality, 2(1), 87-104.
    • (2002) Asian J. Quality , vol.2 , Issue.1 , pp. 87-104
    • Kroslid, D.1
  • 15
    • 33747373317 scopus 로고    scopus 로고
    • Tracking the location of materials on construction job sites
    • Song, J., Haas, C. T., and Caldas, C. H. (2006). "Tracking the Location of Materials on Construction Job Sites." J. Constr. Engrg. and Mgmt. 132(9), 911-918.
    • (2006) J. Constr. Engrg. and Mgmt. , vol.132 , Issue.9 , pp. 911-918
    • Song, J.1    Haas, C.T.2    Caldas, C.H.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.