-
2
-
-
3242716315
-
-
White Paper 8, Lean Construction Institute, Calif.
-
Ballard, G. (2000). " Lean project delivery system. " White Paper No. 8, Lean Construction Institute, Calif., http://leanconstruction.org.
-
(2000)
Lean Project Delivery System.
-
-
Ballard, G.1
-
3
-
-
39349114541
-
RFID+4D CAD for progress management of structural steel works in high-rise buildings
-
Chin, S., Yoon, S., Choi, C., and Cho, C. (2008). "RFID+4D CAD for progress management of structural steel works in high-rise buildings." J. Comput. in Civ. Engrg. 22(2), 74-89.
-
(2008)
J. Comput. in Civ. Engrg.
, vol.22
, Issue.2
, pp. 74-89
-
-
Chin, S.1
Yoon, S.2
Choi, C.3
Cho, C.4
-
5
-
-
70349636312
-
RFID in construction; Review of the current state of Radio Frequency Identification (RFID): Technology, its use and potential future use in construction
-
Erabuild, June/July
-
Erabuild (2006), " RFID in construction; review of the current state of Radio Frequency Identification (RFID): technology, its use and potential future use in construction", ERABUILD Final Report, June/July
-
(2006)
ERABUILD Final Report
-
-
-
6
-
-
37249083919
-
Six sigma-based approach to improve performance in construction operations
-
Han, S. H., Chae, M. J., Im, K. S., and Ryu H. D. (2008). "Six sigma-based approach to improve performance in construction operations." J. Mgmt. in Engrg. 24(1), 21-31.
-
(2008)
J. Mgmt. in Engrg.
, vol.24
, Issue.1
, pp. 21-31
-
-
Han, S.H.1
Chae, M.J.2
Im, K.S.3
Ryu, H.D.4
-
8
-
-
37249012222
-
Lean production theory: Moving beyond cando
-
Santiago, Chile
-
Howell, G., and Ballard, G. (1994). "Lean production theory: Moving beyond cando. " Proc., 2nd Annual Conf. of the Int. Group of Lean Construction, Santiago, Chile.
-
(1994)
Proc., 2nd Annual Conf. of the Int. Group of Lean Construction
-
-
Howell, G.1
Ballard, G.2
-
9
-
-
37248999221
-
Capacity utilization and wait time: A premier for construction
-
Santiago, Chile
-
Howell, G., Ballard, G., and Hall, J. (2001). "Capacity utilization and wait time: A premier for construction." Proc., 9th Annual Conf. of the Int. Group of Lean Construction, Santiago, Chile.
-
(2001)
Proc., 9th Annual Conf. of the Int. Group of Lean Construction
-
-
Howell, G.1
Ballard, G.2
Hall, J.3
-
10
-
-
37249024978
-
-
Imagine That., San Jose, Calif
-
Imagine That. (2002). User's guide for EXTND, San Jose, Calif.
-
(2002)
User's Guide for EXTND
-
-
-
11
-
-
0011513664
-
Radio-frequency identifications applications in construction industry
-
Jaselskis, E. J., Anderson, M. R., Jahren, C. T., Rodriguez, Y., and Njos, S. (1995). "Radio-frequency identifications applications in construction industry." J. Constr. Eng. Manage., 121(2), 189-196.
-
(1995)
J. Constr. Eng. Manage.
, vol.121
, Issue.2
, pp. 189-196
-
-
Jaselskis, E.J.1
Anderson, M.R.2
Jahren, C.T.3
Rodriguez, Y.4
Njos, S.5
-
12
-
-
13944281379
-
Implementing Radio frequency identification in the construction process
-
Jaselskis, E. J., and El-Misalami, T. (2003) "Implementing Radio Frequency Identification in the Construction Process." J. Constr. Engrg. and Mgmt. 129(6), 680-688.
-
(2003)
J. Constr. Engrg. and Mgmt.
, vol.129
, Issue.6
, pp. 680-688
-
-
Jaselskis, E.J.1
El-Misalami, T.2
-
14
-
-
37249086508
-
Six sigma and lean manufacturing - A merger for world-class performance, but is it really talking place?
-
Kroslid, D. (2002). "Six sigma and lean manufacturing - A merger for world-class performance, but is it really talking place?" Asian J. Quality, 2(1), 87-104.
-
(2002)
Asian J. Quality
, vol.2
, Issue.1
, pp. 87-104
-
-
Kroslid, D.1
-
15
-
-
33747373317
-
Tracking the location of materials on construction job sites
-
Song, J., Haas, C. T., and Caldas, C. H. (2006). "Tracking the Location of Materials on Construction Job Sites." J. Constr. Engrg. and Mgmt. 132(9), 911-918.
-
(2006)
J. Constr. Engrg. and Mgmt.
, vol.132
, Issue.9
, pp. 911-918
-
-
Song, J.1
Haas, C.T.2
Caldas, C.H.3
|