U.S. construction labor productivity trends, 1970-1998
-
Allmon, E., Haas, C. T., Borcherding, J. D., and Goodrum, P. M. (2000). "U.S. construction labor productivity trends, 1970-1998." J. Constr. Eng. Manage., 126(2), 97-104.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.2
, pp. 97-104
-
-
Allmon, E.1
Haas, C.T.2
Borcherding, J.D.3
Goodrum, P.M.4
-
3
-
-
2142695147
-
-
Rep. No. C-6, Business Roundtable, New York
-
Business Roundtable. (1982). "Absenteeism and turnover," Rep. No. C-6, Business Roundtable, New York.
-
(1982)
Absenteeism and Turnover
-
-
-
4
-
-
14544278951
-
Labor productivity impact of varying crew levels
-
Orlando, Fla.
-
Cass, D. J. (1992). "Labor productivity impact of varying crew levels," 1992 MCE Transactions, Orlando, Fla., C2.1-2.9.
-
(1992)
1992 MCE Transactions
-
-
Cass, D.J.1
-
5
-
-
14544272863
-
Labor productivity
-
Chapter 5, Marcel Dekker, New York
-
Clark, F. D., and Lorenzoni, A. B. (1978). "Labor productivity." Chapter 5, Applied cost engineering, Marcel Dekker, New York, 61-73.
-
(1978)
Applied Cost Engineering
, pp. 61-73
-
-
Clark, F.D.1
Lorenzoni, A.B.2
-
7
-
-
0027041664
-
Use of productivity factors in construction claims
-
Orlando, Fla.
-
Dieterle, R., and DeStephanis, A. (1992). "Use of productivity factors in construction claims." 1992 AACE Transactions, Orlando, Fla., C1.11.7.
-
(1992)
1992 AACE Transactions
-
-
Dieterle, R.1
DeStephanis, A.2
-
8
-
-
14544300169
-
Labor productivity and labor productivity analysis
-
Chapters 12-13, Kenneth K. Humphreys, ed., McGraw-Hill, New York
-
Hackney, J. W., "Labor productivity and labor productivity analysis." Chapters 12-13, Control and management of capital projects, 2nd Ed., Kenneth K. Humphreys, ed., McGraw-Hill, New York, 87-109.
-
Control and Management of Capital Projects, 2nd Ed.
, pp. 87-109
-
-
Hackney, J.W.1
-
9
-
-
0004652780
-
Quantitative impacts of project change: Size issues
-
Ibbs, C. W. (1997). "Quantitative impacts of project change: Size issues." J. Constr. Eng. Manage., 123(3), 308-311.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.3
, pp. 308-311
-
-
Ibbs, C.W.1
-
10
-
-
0022266352
-
Climatic effects on construction
-
Koehn, E., and Brown, G. (1985). "Climatic effects on construction." J. Constr. Eng. Manage., 111(2), 129-137.
-
(1985)
J. Constr. Eng. Manage.
, vol.111
, Issue.2
, pp. 129-137
-
-
Koehn, E.1
Brown, G.2
-
11
-
-
14544297489
-
Factors affecting labor productivity
-
Bulletin No. PD2, Rockville, Md.
-
Mechanical Contractors Association of America (MCAA). (1994). "Factors affecting labor productivity." Labor estimating manual. Bulletin No. PD2, Rockville, Md. 1-3.
-
(1994)
Labor Estimating Manual
, pp. 1-3
-
-
-
12
-
-
14544283394
-
Avoiding claims
-
Chapter 24, Richard E. Westney, ed., Marcel Dekker, New York
-
Ponce de Leon, G., McManus, T., Klanac, G., and Knoke, J. (1997). "Avoiding claims." Chapter 24, The engineer's cost handbook-Tools for managing project costs, Richard E. Westney, ed., Marcel Dekker, New York. 709-738.
-
(1997)
The Engineer's Cost Handbook-Tools for Managing Project Costs
, pp. 709-738
-
-
Ponce De Leon, G.1
McManus, T.2
Klanac, G.3
Knoke, J.4
-
14
-
-
2342444111
-
Manual of construction productivity measurement and performance evaluation
-
Construction Industry Institute, Austin, Tex.
-
Thomas, H. R. (1988). Manual of construction productivity measurement and performance evaluation, Source document 35, Construction Industry Institute, Austin, Tex.
-
(1988)
Source Document
, vol.35
-
-
Thomas, H.R.1
-
15
-
-
0026837613
-
Effects of scheduled overtime on labor productivity
-
Thomas, H. R. (1992). "Effects of scheduled overtime on labor productivity." J. Constr. Eng. Manage., 118(1), 60-76.
-
(1992)
J. Constr. Eng. Manage.
, vol.118
, Issue.1
, pp. 60-76
-
-
Thomas, H.R.1
-
16
-
-
0242560802
-
The effects of changes on labor productivity: Why and how much
-
Construction Industry Institute, Austin, Tex.
-
Thomas, H. R., and Napolitan, C. L. (1994). The effects of changes on labor productivity: Why and how much, Source document 99, Construction Industry Institute, Austin, Tex.
-
(1994)
Source Document
, vol.99
-
-
Thomas, H.R.1
Napolitan, C.L.2
-
17
-
-
0000849119
-
Scheduled overtime and labor productivity: A quantitative analysis
-
Thomas, H. R., and Raynar, K. A. (1997). "Scheduled overtime and labor productivity: A quantitative analysis." J. Constr. Eng. Manage., 123(2), 181-188.
-
(1997)
J. Constr. Eng. Manage.
, vol.123
, Issue.2
, pp. 181-188
-
-
Thomas, H.R.1
Raynar, K.A.2
-
18
-
-
0023559504
-
Factor model of construction productivity
-
Thomas, H. R., and Yiakoumis, I. (1987). "Factor model of construction productivity." J. Constr. Eng. Manage., 113(4), 623-639.
-
(1987)
J. Constr. Eng. Manage.
, vol.113
, Issue.4
, pp. 623-639
-
-
Thomas, H.R.1
Yiakoumis, I.2
-
19
-
-
0022702177
-
The measured mile: Proving construction inefficiency costs
-
Zink, D. A. (1986). "The measured mile: Proving construction inefficiency costs." Cost Eng., 28(4), 19-21.
-
(1986)
Cost Eng.
, vol.28
, Issue.4
, pp. 19-21
-
-
Zink, D.A.1
|