메뉴 건너뛰기




Volumn 4741 LNCS, Issue , 2007, Pages 105-117

Scheduling for cellular manufacturing

Author keywords

[No Author keywords available]

Indexed keywords

AMPLIFIERS (ELECTRONIC); BASE STATIONS; CUSTOMER SATISFACTION; SCHEDULING; STANDARDIZATION; WIRELESS NETWORKS;

EID: 38149119675     PISSN: 03029743     EISSN: 16113349     Source Type: Book Series    
DOI: 10.1007/978-3-540-74970-7_10     Document Type: Conference Paper
Times cited : (3)

References (9)
  • 1
    • 33751413051 scopus 로고    scopus 로고
    • Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming
    • IEEE Computer Society Press, Los Alamitos
    • Bixby, R., Burda, R., Miller, D.: Short-interval detailed production scheduling in 300mm semiconductor manufacturing using mixed integer and constraint programming. In: The 17th Annual SEMI/IEEE Advanced Semiconductor Manufacturing Conference (ASMC-2006), pp. 148-154. IEEE Computer Society Press, Los Alamitos (2006)
    • (2006) The 17th Annual SEMI/IEEE Advanced Semiconductor Manufacturing Conference (ASMC-2006) , pp. 148-154
    • Bixby, R.1    Burda, R.2    Miller, D.3
  • 2
    • 0033362571 scopus 로고    scopus 로고
    • Controlling shop floor operations in a multifamily, multi-cell manufacturing environment through constant work-in-process
    • Golany, B., Dar-El, E.M., Zeev, N.: Controlling shop floor operations in a multifamily, multi-cell manufacturing environment through constant work-in-process. IIE Transactions 31, 771-781 (1999)
    • (1999) IIE Transactions , vol.31 , pp. 771-781
    • Golany, B.1    Dar-El, E.M.2    Zeev, N.3
  • 3
    • 38149039629 scopus 로고    scopus 로고
    • Ilog: Ilog OPL Studio 3.7.1 help files (2005)
    • Ilog: Ilog OPL Studio 3.7.1 help files (2005)
  • 6
    • 38149021665 scopus 로고    scopus 로고
    • International Encyclopedia of Business and Management
    • Thompson Business Press
    • Love, D.: International Encyclopedia of Business and Management. In: The Design of Manufacturing Systems, vol. 4, pp. 3154-3174. Thompson Business Press (1996)
    • (1996) The Design of Manufacturing Systems , vol.4 , pp. 3154-3174
    • Love, D.1
  • 7
    • 0032014495 scopus 로고    scopus 로고
    • Constraint-based job shop scheduling with IILOG SCHEDULER
    • Nuijten, W., Le Pape, C.: Constraint-based job shop scheduling with IILOG SCHEDULER. Journal of Heuristics 3, 271-286 (1998)
    • (1998) Journal of Heuristics , vol.3 , pp. 271-286
    • Nuijten, W.1    Le Pape, C.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.