-
2
-
-
42549089119
-
Controller and power hardware-in-loop methods for accelerating renewable energy integration
-
Center for Adv. Power Syst., Florida State Univ., Tallahassee, FL
-
M. Steurer, F. Bogdan, W. Ren, M. Sloderbeck, and S. Woodruff, "Controller and power hardware-in-loop methods for accelerating renewable energy integration," in IEEE Power Engineering Society General Meeting, (Center for Adv. Power Syst., Florida State Univ., Tallahassee, FL), 2007.
-
(2007)
IEEE Power Engineering Society General Meeting
-
-
Steurer, M.1
Bogdan, F.2
Ren, W.3
Sloderbeck, M.4
Woodruff, S.5
-
3
-
-
68249161948
-
An effective method for evaluating the accuracy of power hardware-in-the-loop simulations
-
W. Ren, M. Steurer, and T. Baldwin, "An effective method for evaluating the accuracy of power hardware-in-the-loop simulations," IEEE Transactions on Industry Applications, vol. 45, no. 4, pp. 1484-1490, 2009.
-
(2009)
IEEE Transactions on Industry Applications
, vol.45
, Issue.4
, pp. 1484-1490
-
-
Ren, W.1
Steurer, M.2
Baldwin, T.3
-
4
-
-
71849103332
-
Testing of a controller for an eto-based statcom through controller hardware-in-the-loop simulation
-
Center for Adv. Power Syst., Florida State Univ., Tallahassee, FL, USA
-
J. Langston, L. Qi, M. Steurer, M. Sloderbeck, Y. Liu, Z. Xi, S. Mundkur, Z. Liang, A. Huang, S. Bhattacharya, W. Litzenberger, L. Anderson, P. Sosrensen, and A. Sundaram, "Testing of a controller for an eto-based statcom through controller hardware-in-the-loop simulation," in IEEE Power & Energy Society General Meeting, PES, (Center for Adv. Power Syst., Florida State Univ., Tallahassee, FL, USA), 2009.
-
(2009)
IEEE Power & Energy Society General Meeting, PES
-
-
Langston, J.1
Qi, L.2
Steurer, M.3
Sloderbeck, M.4
Liu, Y.5
Xi, Z.6
Mundkur, S.7
Liang, Z.8
Huang, A.9
Bhattacharya, S.10
Litzenberger, W.11
Anderson, L.12
Sosrensen, P.13
Sundaram, A.14
-
5
-
-
48349093425
-
A virtual testing facility for elevator and escalator systems
-
A. Monti, S. D'Arco, Y. Work, and A. Lentini, "A virtual testing facility for elevator and escalator systems," in Power Electronics Specialists Conference (PESC), (Orlando, FL), 2007.
-
Power Electronics Specialists Conference (PESC), (Orlando, FL), 2007
-
-
Monti, A.1
D'Arco, S.2
Work, Y.3
Lentini, A.4
-
6
-
-
70349339654
-
Dead-beat control for a single-phase 50-kw, 16.7-hz railway-grid representation inverter featuring variable grid parameters
-
M. Oettmeier, C. Heising, V. Staudt, and A. Steimel, "Dead-beat control for a single-phase 50-kw, 16.7-hz railway-grid representation inverter featuring variable grid parameters," in POWERENG 2009 - 2nd International Conference on Power Engineering, (Lissabon, Portugal), pp. 279-284, 2009.
-
(2009)
POWERENG 2009 - 2nd International Conference on Power Engineering, (Lissabon, Portugal)
, pp. 279-284
-
-
Oettmeier, M.1
Heising, C.2
Staudt, V.3
Steimel, A.4
-
7
-
-
52349121745
-
Single-phase 50-kw, 16.7-hz railway-grid representation featuring variable grid parameters
-
C. Heising, M. Gorski, V. Staudt, and A. Steimel, "Single-phase 50-kw, 16.7-hz railway-grid representation featuring variable grid parameters," in 39th IEEE Power Electronics Specialists Conference, (Rhodes, Griechenland), pp. 920-924, 2008.
-
(2008)
39th IEEE Power Electronics Specialists Conference, (Rhodes, Griechenland)
, pp. 920-924
-
-
Heising, C.1
Gorski, M.2
Staudt, V.3
Steimel, A.4
-
8
-
-
8744220418
-
A novel three-phase dc/dc converter for high-power applications
-
J. Jacobs, A. Averberg, and R. W. De Doncker, "A novel three-phase dc/dc converter for high-power applications," in 35th Annual IEEE Power Electronics Specialists Conference PESC, (Aachen), 2004.
-
35th Annual IEEE Power Electronics Specialists Conference PESC, (Aachen), 2004
-
-
Jacobs, J.1
Averberg, A.2
De Doncker, R.W.3
-
9
-
-
77955760223
-
Permanent-magnet synchronous machine model for urban transport applications
-
J. Fang, C. Heising, V. Staudt, and A. Steimel, "Permanent-magnet synchronous machine model for urban transport applications," in International Conference on Optimization of Electrical and Electronic Equipment (OPTIM), (Brasov, Romania), 2010.
-
International Conference on Optimization of Electrical and Electronic Equipment (OPTIM), (Brasov, Romania), 2010
-
-
Fang, J.1
Heising, C.2
Staudt, V.3
Steimel, A.4
-
10
-
-
6244238591
-
Appropriate pulse width modulation for a three-phase pwm ac-to-dc converter
-
M. Weinhold, "Appropriate pulse width modulation for a three-phase pwm ac-to-dc converter," EPE-Journal, vol. 1, no. 2, pp. 139-148, 1991.
-
(1991)
EPE-Journal
, vol.1
, Issue.2
, pp. 139-148
-
-
Weinhold, M.1
-
11
-
-
77955735969
-
Improved 200-kw double three-level high-power active front end with a new pc-based control hardware
-
R. Schmidt-Obermöller, M. Kail, V. Staudt, and A. Steimel, "Improved 200-kw double three-level high-power active front end with a new pc-based control hardware," in 10th OPTIM conference, (Brasov/Romania), 2006.
-
10th OPTIM Conference, (Brasov/Romania), 2006
-
-
Schmidt-Obermöller, R.1
Kail, M.2
Staudt, V.3
Steimel, A.4
-
12
-
-
4043052854
-
Direct self control and synchronous pulse techniques for high-power traction inverters in comparison
-
A. Steimel, "Direct self control and synchronous pulse techniques for high-power traction inverters in comparison," IEEE Transactions on Industrial Electronics, vol. 51, no. 4, pp. 810-820, 2004.
-
(2004)
IEEE Transactions on Industrial Electronics
, vol.51
, Issue.4
, pp. 810-820
-
-
Steimel, A.1
|