메뉴 건너뛰기




Volumn 48, Issue 20, 2010, Pages 6189-6202

An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal

Author keywords

beam search; heuristics; just in time; NP hard; production smoothing

Indexed keywords

BEAM SEARCH; HEURISTICS; JUST IN TIME; NP-HARD; PRODUCTION SMOOTHING;

EID: 77955683572     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540903289730     Document Type: Article
Times cited : (8)

References (23)
  • 1
    • 0031238178 scopus 로고    scopus 로고
    • A parametric procedure for multicriterion sequence scheduling for just-in-time mixed-model assembly lines
    • Aigbedo, H. and Monden, Y., 1997. A parametric procedure for multicriterion sequence scheduling for just-in-time mixed-model assembly lines. International Journal of Production Research, 35 (9), 2543-2564.
    • (1997) International Journal of Production Research , vol.35 , Issue.9 , pp. 2543-2564
    • Aigbedo, H.1    Monden, Y.2
  • 2
    • 60649091091 scopus 로고    scopus 로고
    • The product rate variation problem and its relevance in real world mixed-model assembly lines. Jena research paper in business and economics
    • School of Economics and Business Administration, Friedrich-Schiller- University Jena
    • Boysen, N., Fliedner, M., and Scholl, A., 2007. The product rate variation problem and its relevance in real world mixed-model assembly lines. Jena research paper in business and economics. School of Economics and Business Administration, Friedrich-Schiller-University Jena. [Also in: European Journal of Operational Research, 197 (2), 818-824].
    • (2007) European Journal of Operational Research , vol.197 , Issue.2 , pp. 818-824
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 3
    • 51249121803 scopus 로고    scopus 로고
    • Sequencing mixed-model assembly lines: Survey, classification and model critique
    • Boysen, N., Fliedner, M., and Scholl, A., 2009. Sequencing mixed-model assembly lines: survey, classification and model critique. European Journal of Operational Research, 192 (2), 349-373.
    • (2009) European Journal of Operational Research , vol.192 , Issue.2 , pp. 349-373
    • Boysen, N.1    Fliedner, M.2    Scholl, A.3
  • 4
    • 33644861570 scopus 로고    scopus 로고
    • Comparing two weighted approaches for sequencing mixedmodel assembly lines with multiple objectives
    • Ding, F., Zhu, J., and Sun, H., 2006. Comparing two weighted approaches for sequencing mixedmodel assembly lines with multiple objectives. International Journal of Production Economics, 102 (1), 108-131.
    • (2006) International Journal of Production Economics , vol.102 , Issue.1 , pp. 108-131
    • Ding, F.1    Zhu, J.2    Sun, H.3
  • 6
    • 33645859030 scopus 로고    scopus 로고
    • A recovering beam search algorithm for the single machine just-in-time scheduling problem
    • Esteve, B., et al., 2006. A recovering beam search algorithm for the single machine just-in-time scheduling problem. European Journal of Operational Research, 172 (3), 798-813.
    • (2006) European Journal of Operational Research , vol.172 , Issue.3 , pp. 798-813
    • Esteve, B.1
  • 7
    • 13444278719 scopus 로고    scopus 로고
    • Makespan minimization for scheduling unrelated parallel machines: A recovering beam search approach
    • Ghirardi, M. and Potts, C.N., 2005. Makespan minimization for scheduling unrelated parallel machines: a recovering beam search approach. European Journal of Operational Research, 165 (2), 457-467.
    • (2005) European Journal of Operational Research , vol.165 , Issue.2 , pp. 457-467
    • Ghirardi, M.1    Potts, C.N.2
  • 8
    • 0026913026 scopus 로고
    • Quick and dirty sequencing for mixed-model manufacturing systems
    • Inman, R. and Bulfin, R., 1992. Quick and dirty sequencing for mixed-model manufacturing systems. International Journal of Production Research, 30 (9), 2011-2018.
    • (1992) International Journal of Production Research , vol.30 , Issue.9 , pp. 2011-2018
    • Inman, R.1    Bulfin, R.2
  • 9
    • 0035341955 scopus 로고    scopus 로고
    • Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems
    • Korkmazel, T. and Meral, S., 2001. Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems. European Journal of Operational Research, 131 (1), 188-207.
    • (2001) European Journal of Operational Research , vol.131 , Issue.1 , pp. 188-207
    • Korkmazel, T.1    Meral, S.2
  • 10
    • 0025868004 scopus 로고
    • A note on level schedules for mixed-model assembly lines in justin-time production systems
    • Kubiak, W. and Sethi, S., 1991. A note on level schedules for mixed-model assembly lines in justin-time production systems. Management Science, 37 (1), 121-122.
    • (1991) Management Science , vol.37 , Issue.1 , pp. 121-122
    • Kubiak, W.1    Sethi, S.2
  • 11
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in just-in-time systems: A survey
    • Kubiak, W., 1993. Minimizing variation of production rates in just-in-time systems: a survey. European Journal of Operational Research, 66 (3), 259-271.
    • (1993) European Journal of Operational Research , vol.66 , Issue.3 , pp. 259-271
    • Kubiak, W.1
  • 12
    • 2242443603 scopus 로고    scopus 로고
    • Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
    • Kubiak, W., Steiner, G., and Yeomans, S., 1997. Optimal level schedules for mixed-model, multi-level just-in-time assembly systems. Annals of Operations Research, 69, 241-259. (Pubitemid 127503107)
    • (1997) Annals of Operations Research , vol.69 , pp. 241-259
    • Kubiak, W.1    Steiner, G.2    Yeomans, J.S.3
  • 13
    • 0031494746 scopus 로고    scopus 로고
    • Using beam search techniques for sequencing mixed-model assembly lines
    • Leu, Y.-Y., Huang, P.Y., and Russell, R.S., 1997. Using beam search techniques for sequencing mixed-model assembly lines. Annals of Operations Research, 70, 379-397.
    • (1997) Annals of Operations Research , vol.70 , pp. 379-397
    • Leu, Y.-Y.1    Huang, P.Y.2    Russell, R.S.3
  • 14
    • 13444262276 scopus 로고    scopus 로고
    • A beam search heuristic method for mixed-model scheduling with setups
    • McMullen, P.R. and Tarasewich, P., 2005. A beam search heuristic method for mixed-model scheduling with setups. International Journal of Production Economics, 96 (2), 273-283.
    • (2005) International Journal of Production Economics , vol.96 , Issue.2 , pp. 273-283
    • McMullen, P.R.1    Tarasewich, P.2
  • 15
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • Miltenburg, J., 1989. Level schedules for mixed-model assembly lines in just-in-time production systems. Management Science, 35 (2), 192-207.
    • (1989) Management Science , vol.35 , Issue.2 , pp. 192-207
    • Miltenburg, J.1
  • 16
    • 0024731470 scopus 로고
    • Sequencing mixed-model multi-level just-in-time production systems
    • Miltenburg, J. and Sinnamon, G., 1989. Sequencing mixed-model multi-level just-in-time production systems. International Journal of Production Research, 27 (9), 1487-1509.
    • (1989) International Journal of Production Research , vol.27 , Issue.9 , pp. 1487-1509
    • Miltenburg, J.1    Sinnamon, G.2
  • 17
    • 0025251040 scopus 로고
    • A dynamic programming algorithm for scheduling mixed-model just-in-time production systems
    • Miltenburg, J., Steiner, G., and Yeomans, S., 1990. A dynamic programming algorithm for scheduling mixed-model just-in-time production systems. Mathematical and Computer Modeling, 13 (3), 57-66.
    • (1990) Mathematical and Computer Modeling , vol.13 , Issue.3 , pp. 57-66
    • Miltenburg, J.1    Steiner, G.2    Yeomans, S.3
  • 18
    • 0003449926 scopus 로고
    • Norcross, GA: Industrial Engineering and Management Press
    • Monden, Y., 1983. Toyota Production System. Norcross, GA: Industrial Engineering and Management Press.
    • (1983) Toyota Production System
    • Monden, Y.1
  • 20
    • 35548975278 scopus 로고    scopus 로고
    • Backtracking and exchange of information: Methods to enhance a beam search algorithm for assembly line scheduling
    • Sabuncuoglu, I., Gocgun, Y., and Erel, E., 2008. Backtracking and exchange of information: methods to enhance a beam search algorithm for assembly line scheduling. European Journal of Operational Research, 186 (3), 915-930.
    • (2008) European Journal of Operational Research , vol.186 , Issue.3 , pp. 915-930
    • Sabuncuoglu, I.1    Gocgun, Y.2    Erel, E.3
  • 21
    • 14044249418 scopus 로고    scopus 로고
    • Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time
    • Valente, J.M.S. and Alves, R.A.F.S., 2005. Filtered and recovering beam search algorithms for the early/tardy scheduling problem with no idle time. Computers & Industrial Engineering, 48 (2), 363-375.
    • (2005) Computers & Industrial Engineering , vol.48 , Issue.2 , pp. 363-375
    • Valente, J.M.S.1    Alves, R.A.F.S.2
  • 22
    • 34547246295 scopus 로고    scopus 로고
    • Production smoothing in just-in-time manufacturing systems: A review of the models and solution approaches
    • Yavuz, M. and Akcali, E., 2007. Production smoothing in just-in-time manufacturing systems: a review of the models and solution approaches. International Journal of Production Research, 45 (16), 3579-3597.
    • (2007) International Journal of Production Research , vol.45 , Issue.16 , pp. 3579-3597
    • Yavuz, M.1    Akcali, E.2
  • 23
    • 0242281041 scopus 로고    scopus 로고
    • A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
    • Zhu, J. and Ding, F.-Y., 2000. A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines. European Journal of Operational Research, 127 (1), 203-216.
    • (2000) European Journal of Operational Research , vol.127 , Issue.1 , pp. 203-216
    • Zhu, J.1    Ding, F.-Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.