메뉴 건너뛰기




Volumn 69, Issue , 1997, Pages 241-259

Optimal level schedules for mixed-model, multi-level just-in-time assembly systems

Author keywords

[No Author keywords available]

Indexed keywords


EID: 2242443603     PISSN: 02545330     EISSN: 15729338     Source Type: Journal    
DOI: 10.1023/a:1018985029260     Document Type: Article
Times cited : (36)

References (19)
  • 4
    • 0004102424 scopus 로고
    • Dow Jones-Irwin, Homewood, IL
    • R. Hall, Zero Inventories, Dow Jones-Irwin, Homewood, IL, 1983.
    • (1983) Zero Inventories
    • Hall, R.1
  • 5
    • 0001157019 scopus 로고
    • Needed: An empirical science of algorithms
    • J. Hooker, Needed: An empirical science of algorithms, Operations Research 42(1994)201-212.
    • (1994) Operations Research , vol.42 , pp. 201-212
    • Hooker, J.1
  • 6
    • 0001602291 scopus 로고
    • Sequencing JIT mixed-model assembly lines
    • R. Inman and R. Bulfin, Sequencing JIT mixed-model assembly lines, Management Science 37 (1991)901-904.
    • (1991) Management Science , vol.37 , pp. 901-904
    • Inman, R.1    Bulfin, R.2
  • 8
    • 0027595182 scopus 로고
    • Minimizing variation of production rates in just-in-time systems: A Survey
    • W. Kubiak, Minimizing variation of production rates in just-in-time systems: A Survey, European Journal of Operational Research 66(1993)259-271.
    • (1993) European Journal of Operational Research , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 9
    • 0025868004 scopus 로고
    • A note on "Level schedules for mixed-model assembly lines in just-in-time production systems"
    • W. Kubiak and S. Sethi, A note on "Level schedules for mixed-model assembly lines in just-in-time production systems", Management Science 37(1991)121-122.
    • (1991) Management Science , vol.37 , pp. 121-122
    • Kubiak, W.1    Sethi, S.2
  • 11
    • 0001360372 scopus 로고
    • Level schedules for mixed-model assembly lines in just-in-time production systems
    • J. Miltenburg, Level schedules for mixed-model assembly lines in just-in-time production systems, Management Science 32(1989)192-207.
    • (1989) Management Science , vol.32 , pp. 192-207
    • Miltenburg, J.1
  • 12
    • 84989692636 scopus 로고
    • Developing production schedules which balance part usage and smooth production loads in just-in-time production systems
    • J. Miltenburg and T. Goldstein, Developing production schedules which balance part usage and smooth production loads in just-in-time production systems, Naval Research Logistics 38(1991) 893-910.
    • (1991) Naval Research Logistics , vol.38 , pp. 893-910
    • Miltenburg, J.1    Goldstein, T.2
  • 13
    • 0024731470 scopus 로고
    • Scheduling mixed-model, multilevel assembly lines in just-in-time production systems
    • J. Miltenburg and G. Sinnamon, Scheduling mixed-model, multilevel assembly lines in just-in-time production systems, International Journal of Production Research 27(1989)1487-1509.
    • (1989) International Journal of Production Research , vol.27 , pp. 1487-1509
    • Miltenburg, J.1    Sinnamon, G.2
  • 14
    • 0025251040 scopus 로고
    • A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
    • J. Miltenburg, G. Steiner and S. Yeomans, A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems, Mathematical and Computer Modelling 13(1990)57-66.
    • (1990) Mathematical and Computer Modelling , vol.13 , pp. 57-66
    • Miltenburg, J.1    Steiner, G.2    Yeomans, S.3
  • 15
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Norcross, GA
    • Y. Monden, Toyota Production Systems, Industrial Engineering and Management Press, Norcross, GA, 1983.
    • (1983) Toyota Production Systems
    • Monden, Y.1
  • 16
    • 0018469357 scopus 로고
    • A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor
    • K. Okamura and H. Yamashita, A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyor, International Journal of Production Research 17(1979)233-247.
    • (1979) International Journal of Production Research , vol.17 , pp. 233-247
    • Okamura, K.1    Yamashita, H.2
  • 17
    • 0027614669 scopus 로고
    • Level schedules for mixed-model, just-in-time assembly processes
    • G. Steiner and S. Yeomans, Level schedules for mixed-model, just-in-time assembly processes, Management Science 36(1993)728-735.
    • (1993) Management Science , vol.36 , pp. 728-735
    • Steiner, G.1    Yeomans, S.2
  • 19
    • 0042673099 scopus 로고
    • Ph.D. Dissertation, Department of Management Science and Information Systems, McMaster University, Hamilton, Ontario
    • S. Yeomans, Optimal level schedules for mixed-model, just-in-time assembly systems, Ph.D. Dissertation, Department of Management Science and Information Systems, McMaster University, Hamilton, Ontario, 1992.
    • (1992) Optimal Level Schedules for Mixed-model, Just-in-time Assembly Systems
    • Yeomans, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.