-
1
-
-
0025211593
-
Sequencing with earliness and tardiness penalties: a review
-
Baker K.R., and Scudder G.D. Sequencing with earliness and tardiness penalties: a review. Operations Research 38 1 (1990) 22-36
-
(1990)
Operations Research
, vol.38
, Issue.1
, pp. 22-36
-
-
Baker, K.R.1
Scudder, G.D.2
-
2
-
-
0037427701
-
Pert scheduling with convex cost functions
-
Chrétienne P., and Sourd F. Pert scheduling with convex cost functions. Theoretical Computer Science 292 1 (2003) 145-164
-
(2003)
Theoretical Computer Science
, vol.292
, Issue.1
, pp. 145-164
-
-
Chrétienne, P.1
Sourd, F.2
-
3
-
-
0027542554
-
Single machine scheduling with early and tardy completion costs
-
Davis J.S., and Kanet J.J. Single machine scheduling with early and tardy completion costs. Naval Research Logistics 40 (1993) 85-101
-
(1993)
Naval Research Logistics
, vol.40
, pp. 85-101
-
-
Davis, J.S.1
Kanet, J.J.2
-
4
-
-
33645886590
-
-
F. Della Croce, M. Ghirardi, R. Tadei, Recovering beam search: Enhancing the beam search approach for combinatorial problems, PlanSIG2002 Conference Proceedings, Delft (The Netherlands), 2002, pp. 149-169.
-
-
-
-
5
-
-
33645848436
-
-
B. Esteve, C. Aubijoux, A. Chartier, V. T'kindt, Résolution heuristique d'un problème d'ordonnancement multicritère à une machine de type juste-à-temps. 4ème Conférence de la Société Francaise de Recherche Opérationnelle et d'Aide à la Décision (ROADEF'02), Paris (France), in French, 2002.
-
-
-
-
6
-
-
0023542419
-
Minimizing weighted absolute deviation in single machine scheduling
-
Fry T.D., Armstrong R.D., and Blackstone R.H. Minimizing weighted absolute deviation in single machine scheduling. IIE Transactions 19 4 (1987) 445-450
-
(1987)
IIE Transactions
, vol.19
, Issue.4
, pp. 445-450
-
-
Fry, T.D.1
Armstrong, R.D.2
Blackstone, R.H.3
-
7
-
-
0024141205
-
Planning for idle time: A rationale for underutilization of capacity
-
Fry T.D., and Blackstone R.H. Planning for idle time: A rationale for underutilization of capacity. International Journal of Production Research 26 12 (1988) 1853-1859
-
(1988)
International Journal of Production Research
, vol.26
, Issue.12
, pp. 1853-1859
-
-
Fry, T.D.1
Blackstone, R.H.2
-
8
-
-
0024010206
-
One-processor scheduling with symmetric earliness and tardiness penalties
-
Garey M.R., Tarjan R.E., and Wilfong G.T. One-processor scheduling with symmetric earliness and tardiness penalties. Mathematics of Operations Research 13 2 (1988) 330-348
-
(1988)
Mathematics of Operations Research
, vol.13
, Issue.2
, pp. 330-348
-
-
Garey, M.R.1
Tarjan, R.E.2
Wilfong, G.T.3
-
9
-
-
0036507457
-
Due date assignment and scheduling: SLK, TWK and other due date assignment models
-
Gordon V., Proth J.-M., and Chu C. Due date assignment and scheduling: SLK, TWK and other due date assignment models. Production, Planning and Control 13 2 (2002) 117-132
-
(2002)
Production, Planning and Control
, vol.13
, Issue.2
, pp. 117-132
-
-
Gordon, V.1
Proth, J.-M.2
Chu, C.3
-
10
-
-
0037118177
-
A survey of the state-of-the-art of common due date assignment and scheduling research
-
Gordon V., Proth J.-M., and Chu C. A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research 139 1 (2002) 1-25
-
(2002)
European Journal of Operational Research
, vol.139
, Issue.1
, pp. 1-25
-
-
Gordon, V.1
Proth, J.-M.2
Chu, C.3
-
12
-
-
0026223827
-
Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date
-
Hall N.G., Kubiak W., and Sethi S. Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date. Operations Research 39 (1991) 847-856
-
(1991)
Operations Research
, vol.39
, pp. 847-856
-
-
Hall, N.G.1
Kubiak, W.2
Sethi, S.3
-
13
-
-
0026223840
-
Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date
-
Hall N.G., and Posner M.E. Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date. Operations Research 39 (1991) 836-846
-
(1991)
Operations Research
, vol.39
, pp. 836-846
-
-
Hall, N.G.1
Posner, M.E.2
-
14
-
-
0008310557
-
Earliness-tardiness scheduling around almost equal due dates
-
Hoogeveen H., and van de Velde S.M. Earliness-tardiness scheduling around almost equal due dates. INFORMS Journal on Computing 9 1 (1997) 92-99
-
(1997)
INFORMS Journal on Computing
, vol.9
, Issue.1
, pp. 92-99
-
-
Hoogeveen, H.1
van de Velde, S.M.2
-
15
-
-
0031268318
-
A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem
-
James R.J.W., and Buchanan J.T. A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem. European Journal of Operational Research 102 (1997) 513-527
-
(1997)
European Journal of Operational Research
, vol.102
, pp. 513-527
-
-
James, R.J.W.1
Buchanan, J.T.2
-
16
-
-
0032051131
-
Performance enhancements to tabu search for the early/tardy scheduling problem
-
James R.J.W., and Buchanan J.T. Performance enhancements to tabu search for the early/tardy scheduling problem. European Journal of Operational Research 106 (1998) 254-265
-
(1998)
European Journal of Operational Research
, vol.106
, pp. 254-265
-
-
James, R.J.W.1
Buchanan, J.T.2
-
17
-
-
0033346202
-
A fully polynomial approximation scheme for the weighted earliness-tardiness problem
-
Kovalyov M.Y., and Kubiak W. A fully polynomial approximation scheme for the weighted earliness-tardiness problem. Operations Research 47 5 (1999) 757-761
-
(1999)
Operations Research
, vol.47
, Issue.5
, pp. 757-761
-
-
Kovalyov, M.Y.1
Kubiak, W.2
-
18
-
-
0025868004
-
A note on 'level schedules for mixed-model assembly lines in Just-in-Time productions systems'
-
Kubiak W., and Sethi S.P. A note on 'level schedules for mixed-model assembly lines in Just-in-Time productions systems'. Management Science 37 1 (1991) 121-122
-
(1991)
Management Science
, vol.37
, Issue.1
, pp. 121-122
-
-
Kubiak, W.1
Sethi, S.P.2
-
20
-
-
0000902813
-
A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights
-
Lee C.Y., and Choi J.Y. A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights. Computers and Operations Research 22 8 (1995) 857-869
-
(1995)
Computers and Operations Research
, vol.22
, Issue.8
, pp. 857-869
-
-
Lee, C.Y.1
Choi, J.Y.2
-
21
-
-
0035192727
-
A heuristic for single machine scheduling with early and tardy costs
-
Mazzini R., and Armentano A. A heuristic for single machine scheduling with early and tardy costs. European Journal of Operational Research 128 (2001) 129-146
-
(2001)
European Journal of Operational Research
, vol.128
, pp. 129-146
-
-
Mazzini, R.1
Armentano, A.2
-
23
-
-
0000245614
-
The single machine early/tardy problem
-
Ow P.S., and Morton T.E. The single machine early/tardy problem. Management Science 35 2 (1989) 177-190
-
(1989)
Management Science
, vol.35
, Issue.2
, pp. 177-190
-
-
Ow, P.S.1
Morton, T.E.2
-
24
-
-
84989446424
-
Multicriteria optimization: A general characterization of efficient solutions
-
Soland R.M. Multicriteria optimization: A general characterization of efficient solutions. Decision Sciences 10 (1979) 27-38
-
(1979)
Decision Sciences
, vol.10
, pp. 27-38
-
-
Soland, R.M.1
-
25
-
-
3843078491
-
The continuous assignment problem and its application to preemptive and non-preemptive scheduling with irregular cost functions
-
Sourd F. The continuous assignment problem and its application to preemptive and non-preemptive scheduling with irregular cost functions. INFORMS Journal on Computing 16 (2004) 198-208
-
(2004)
INFORMS Journal on Computing
, vol.16
, pp. 198-208
-
-
Sourd, F.1
-
26
-
-
0030262170
-
A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems
-
Sridharan V., and Zhou Z. A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems. European Journal of Operational Research 94 (1996) 292-301
-
(1996)
European Journal of Operational Research
, vol.94
, pp. 292-301
-
-
Sridharan, V.1
Zhou, Z.2
-
27
-
-
0027614669
-
Level schedules for mixed-model, Just-in-Time processes
-
Steiner G., and Yeomans S. Level schedules for mixed-model, Just-in-Time processes. Management Science 39 6 (1993) 728-734
-
(1993)
Management Science
, vol.39
, Issue.6
, pp. 728-734
-
-
Steiner, G.1
Yeomans, S.2
-
28
-
-
84977334714
-
Optimal timing schedules in earliness-tardiness single machine sequencing
-
Szwarc W., and Mukhopadhyay S.K. Optimal timing schedules in earliness-tardiness single machine sequencing. Naval Research Logistics 42 (1995) 1109-1114
-
(1995)
Naval Research Logistics
, vol.42
, pp. 1109-1114
-
-
Szwarc, W.1
Mukhopadhyay, S.K.2
-
30
-
-
0026158109
-
Algorithms for a class of single machine weighted tardiness and earliness problems
-
Yano C.A., and Kim Y.-D. Algorithms for a class of single machine weighted tardiness and earliness problems. European Journal of Operational Research 52 (1991) 167-178
-
(1991)
European Journal of Operational Research
, vol.52
, pp. 167-178
-
-
Yano, C.A.1
Kim, Y.-D.2
|