메뉴 건너뛰기




Volumn 172, Issue 3, 2006, Pages 798-813

A recovering beam search algorithm for the single machine Just-in-Time scheduling problem

Author keywords

Just in Time scheduling; Multicriteria optimisation; Recovering beam search

Indexed keywords

ALGORITHMS; COMPUTATION THEORY; CONSTRAINT THEORY; HEURISTIC PROGRAMMING; PROBLEM SOLVING; SCHEDULING; STATISTICAL METHODS;

EID: 33645859030     PISSN: 03772217     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.ejor.2004.11.014     Document Type: Article
Times cited : (30)

References (30)
  • 1
    • 0025211593 scopus 로고
    • Sequencing with earliness and tardiness penalties: a review
    • Baker K.R., and Scudder G.D. Sequencing with earliness and tardiness penalties: a review. Operations Research 38 1 (1990) 22-36
    • (1990) Operations Research , vol.38 , Issue.1 , pp. 22-36
    • Baker, K.R.1    Scudder, G.D.2
  • 2
    • 0037427701 scopus 로고    scopus 로고
    • Pert scheduling with convex cost functions
    • Chrétienne P., and Sourd F. Pert scheduling with convex cost functions. Theoretical Computer Science 292 1 (2003) 145-164
    • (2003) Theoretical Computer Science , vol.292 , Issue.1 , pp. 145-164
    • Chrétienne, P.1    Sourd, F.2
  • 3
    • 0027542554 scopus 로고
    • Single machine scheduling with early and tardy completion costs
    • Davis J.S., and Kanet J.J. Single machine scheduling with early and tardy completion costs. Naval Research Logistics 40 (1993) 85-101
    • (1993) Naval Research Logistics , vol.40 , pp. 85-101
    • Davis, J.S.1    Kanet, J.J.2
  • 4
    • 33645886590 scopus 로고    scopus 로고
    • F. Della Croce, M. Ghirardi, R. Tadei, Recovering beam search: Enhancing the beam search approach for combinatorial problems, PlanSIG2002 Conference Proceedings, Delft (The Netherlands), 2002, pp. 149-169.
  • 5
    • 33645848436 scopus 로고    scopus 로고
    • B. Esteve, C. Aubijoux, A. Chartier, V. T'kindt, Résolution heuristique d'un problème d'ordonnancement multicritère à une machine de type juste-à-temps. 4ème Conférence de la Société Francaise de Recherche Opérationnelle et d'Aide à la Décision (ROADEF'02), Paris (France), in French, 2002.
  • 6
    • 0023542419 scopus 로고
    • Minimizing weighted absolute deviation in single machine scheduling
    • Fry T.D., Armstrong R.D., and Blackstone R.H. Minimizing weighted absolute deviation in single machine scheduling. IIE Transactions 19 4 (1987) 445-450
    • (1987) IIE Transactions , vol.19 , Issue.4 , pp. 445-450
    • Fry, T.D.1    Armstrong, R.D.2    Blackstone, R.H.3
  • 7
    • 0024141205 scopus 로고
    • Planning for idle time: A rationale for underutilization of capacity
    • Fry T.D., and Blackstone R.H. Planning for idle time: A rationale for underutilization of capacity. International Journal of Production Research 26 12 (1988) 1853-1859
    • (1988) International Journal of Production Research , vol.26 , Issue.12 , pp. 1853-1859
    • Fry, T.D.1    Blackstone, R.H.2
  • 8
    • 0024010206 scopus 로고
    • One-processor scheduling with symmetric earliness and tardiness penalties
    • Garey M.R., Tarjan R.E., and Wilfong G.T. One-processor scheduling with symmetric earliness and tardiness penalties. Mathematics of Operations Research 13 2 (1988) 330-348
    • (1988) Mathematics of Operations Research , vol.13 , Issue.2 , pp. 330-348
    • Garey, M.R.1    Tarjan, R.E.2    Wilfong, G.T.3
  • 9
    • 0036507457 scopus 로고    scopus 로고
    • Due date assignment and scheduling: SLK, TWK and other due date assignment models
    • Gordon V., Proth J.-M., and Chu C. Due date assignment and scheduling: SLK, TWK and other due date assignment models. Production, Planning and Control 13 2 (2002) 117-132
    • (2002) Production, Planning and Control , vol.13 , Issue.2 , pp. 117-132
    • Gordon, V.1    Proth, J.-M.2    Chu, C.3
  • 10
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • Gordon V., Proth J.-M., and Chu C. A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research 139 1 (2002) 1-25
    • (2002) European Journal of Operational Research , vol.139 , Issue.1 , pp. 1-25
    • Gordon, V.1    Proth, J.-M.2    Chu, C.3
  • 12
    • 0026223827 scopus 로고
    • Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date
    • Hall N.G., Kubiak W., and Sethi S. Earliness-tardiness scheduling problems, II: Deviation of completion times about a restrictive common due date. Operations Research 39 (1991) 847-856
    • (1991) Operations Research , vol.39 , pp. 847-856
    • Hall, N.G.1    Kubiak, W.2    Sethi, S.3
  • 13
    • 0026223840 scopus 로고
    • Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date
    • Hall N.G., and Posner M.E. Earliness-tardiness scheduling problems, I: Weighted deviation of completion times about a common due date. Operations Research 39 (1991) 836-846
    • (1991) Operations Research , vol.39 , pp. 836-846
    • Hall, N.G.1    Posner, M.E.2
  • 14
    • 0008310557 scopus 로고    scopus 로고
    • Earliness-tardiness scheduling around almost equal due dates
    • Hoogeveen H., and van de Velde S.M. Earliness-tardiness scheduling around almost equal due dates. INFORMS Journal on Computing 9 1 (1997) 92-99
    • (1997) INFORMS Journal on Computing , vol.9 , Issue.1 , pp. 92-99
    • Hoogeveen, H.1    van de Velde, S.M.2
  • 15
    • 0031268318 scopus 로고    scopus 로고
    • A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem
    • James R.J.W., and Buchanan J.T. A neighbourhood scheme with a compressed solution space for the early/tardy scheduling problem. European Journal of Operational Research 102 (1997) 513-527
    • (1997) European Journal of Operational Research , vol.102 , pp. 513-527
    • James, R.J.W.1    Buchanan, J.T.2
  • 16
    • 0032051131 scopus 로고    scopus 로고
    • Performance enhancements to tabu search for the early/tardy scheduling problem
    • James R.J.W., and Buchanan J.T. Performance enhancements to tabu search for the early/tardy scheduling problem. European Journal of Operational Research 106 (1998) 254-265
    • (1998) European Journal of Operational Research , vol.106 , pp. 254-265
    • James, R.J.W.1    Buchanan, J.T.2
  • 17
    • 0033346202 scopus 로고    scopus 로고
    • A fully polynomial approximation scheme for the weighted earliness-tardiness problem
    • Kovalyov M.Y., and Kubiak W. A fully polynomial approximation scheme for the weighted earliness-tardiness problem. Operations Research 47 5 (1999) 757-761
    • (1999) Operations Research , vol.47 , Issue.5 , pp. 757-761
    • Kovalyov, M.Y.1    Kubiak, W.2
  • 18
    • 0025868004 scopus 로고
    • A note on 'level schedules for mixed-model assembly lines in Just-in-Time productions systems'
    • Kubiak W., and Sethi S.P. A note on 'level schedules for mixed-model assembly lines in Just-in-Time productions systems'. Management Science 37 1 (1991) 121-122
    • (1991) Management Science , vol.37 , Issue.1 , pp. 121-122
    • Kubiak, W.1    Sethi, S.P.2
  • 20
    • 0000902813 scopus 로고
    • A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights
    • Lee C.Y., and Choi J.Y. A genetic algorithm for job sequencing problems with distinct due dates and general early-tardy penalty weights. Computers and Operations Research 22 8 (1995) 857-869
    • (1995) Computers and Operations Research , vol.22 , Issue.8 , pp. 857-869
    • Lee, C.Y.1    Choi, J.Y.2
  • 21
    • 0035192727 scopus 로고    scopus 로고
    • A heuristic for single machine scheduling with early and tardy costs
    • Mazzini R., and Armentano A. A heuristic for single machine scheduling with early and tardy costs. European Journal of Operational Research 128 (2001) 129-146
    • (2001) European Journal of Operational Research , vol.128 , pp. 129-146
    • Mazzini, R.1    Armentano, A.2
  • 23
    • 0000245614 scopus 로고
    • The single machine early/tardy problem
    • Ow P.S., and Morton T.E. The single machine early/tardy problem. Management Science 35 2 (1989) 177-190
    • (1989) Management Science , vol.35 , Issue.2 , pp. 177-190
    • Ow, P.S.1    Morton, T.E.2
  • 24
    • 84989446424 scopus 로고
    • Multicriteria optimization: A general characterization of efficient solutions
    • Soland R.M. Multicriteria optimization: A general characterization of efficient solutions. Decision Sciences 10 (1979) 27-38
    • (1979) Decision Sciences , vol.10 , pp. 27-38
    • Soland, R.M.1
  • 25
    • 3843078491 scopus 로고    scopus 로고
    • The continuous assignment problem and its application to preemptive and non-preemptive scheduling with irregular cost functions
    • Sourd F. The continuous assignment problem and its application to preemptive and non-preemptive scheduling with irregular cost functions. INFORMS Journal on Computing 16 (2004) 198-208
    • (2004) INFORMS Journal on Computing , vol.16 , pp. 198-208
    • Sourd, F.1
  • 26
    • 0030262170 scopus 로고    scopus 로고
    • A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems
    • Sridharan V., and Zhou Z. A decision theory based scheduling procedure for single-machine weighted earliness and tardiness problems. European Journal of Operational Research 94 (1996) 292-301
    • (1996) European Journal of Operational Research , vol.94 , pp. 292-301
    • Sridharan, V.1    Zhou, Z.2
  • 27
    • 0027614669 scopus 로고
    • Level schedules for mixed-model, Just-in-Time processes
    • Steiner G., and Yeomans S. Level schedules for mixed-model, Just-in-Time processes. Management Science 39 6 (1993) 728-734
    • (1993) Management Science , vol.39 , Issue.6 , pp. 728-734
    • Steiner, G.1    Yeomans, S.2
  • 28
    • 84977334714 scopus 로고
    • Optimal timing schedules in earliness-tardiness single machine sequencing
    • Szwarc W., and Mukhopadhyay S.K. Optimal timing schedules in earliness-tardiness single machine sequencing. Naval Research Logistics 42 (1995) 1109-1114
    • (1995) Naval Research Logistics , vol.42 , pp. 1109-1114
    • Szwarc, W.1    Mukhopadhyay, S.K.2
  • 30
    • 0026158109 scopus 로고
    • Algorithms for a class of single machine weighted tardiness and earliness problems
    • Yano C.A., and Kim Y.-D. Algorithms for a class of single machine weighted tardiness and earliness problems. European Journal of Operational Research 52 (1991) 167-178
    • (1991) European Journal of Operational Research , vol.52 , pp. 167-178
    • Yano, C.A.1    Kim, Y.-D.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.