Questionnaire survey on bidding in construction
-
doi:10.1061/(ASCE)9742-597X(1988)4:3(229)
-
Ahmad, I., and Minkarah, I. 1988. Questionnaire survey on bidding in construction. Journal of Management Engineering, 4(3): 229-243.doi:10.1061/(ASCE)9742-597X(1988)4:3(229).
-
(1988)
Journal of Management Engineering
, vol.4
, Issue.3
, pp. 229-243
-
-
Ahmad, I.1
Minkarah, I.2
-
2
-
-
0000365630
-
Project procurement system selection model
-
doi:10.1061/(ASCE)0733-9364(2000)126:3(176)
-
Alhazmi, T., and McCaffer, R. 2000. Project procurement system selection model. Journal of Construction Engineering and Management, 126(3): 176-184.doi:10.1061/(ASCE)0733-9364(2000)126:3(176).
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.3
, pp. 176-184
-
-
Alhazmi, T.1
McCaffer, R.2
-
3
-
-
34447560456
-
A fuzzy-logic-based approach to qualitative risk modeling in the construction process
-
An, M., Baker, C., and Zeng, J. 2005. A fuzzy-logic-based approach to qualitative risk modeling in the construction process. World Journal of Engineering, 2(1): 1-12.
-
(2005)
World Journal of Engineering
, vol.2
, Issue.1
, pp. 1-12
-
-
An, M.1
Baker, C.2
Zeng, J.3
-
5
-
-
0017323751
-
Rating and ranking of multiple aspect alternative using fuzzy sets
-
doi:10.1016/0005-1098(77)90008-5
-
Baas, S.M., and Kwakernaak, H. 1977. Rating and ranking of multiple aspect alternative using fuzzy sets. Automatica, 13(1): 47-58.doi:10.1016/0005-1098(77)90008-5.
-
(1977)
Automatica
, vol.13
, Issue.1
, pp. 47-58
-
-
Baas, S.M.1
Kwakernaak, H.2
-
6
-
-
21844517605
-
Validation, verification, and testing techniques throughout the life cycle of a simulation study
-
doi:10.1007/BF02136828
-
Balci, O. 1994. Validation, verification, and testing techniques throughout the life cycle of a simulation study. Annals of Operations Research, 53(1): 121-173.doi:10.1007/BF02136828.
-
(1994)
Annals of Operations Research
, vol.53
, Issue.1
, pp. 121-173
-
-
Balci, O.1
-
7
-
-
0000272113
-
The use of multi-criteria decision analysis to support the search for less conflicting policy options in a multi-actor context: Case study
-
doi:10.1002/mcda.292
-
Bana E. Costa, C.A. 2001. The use of multi-criteria decision analysis to support the search for less conflicting policy options in a multi-actor context: Case study. Journal of Multi-Criteria Decision Analysis, 10(2): 111-125. doi:10.1002/mcda.292.
-
(2001)
Journal of Multi-Criteria Decision Analysis
, vol.10
, Issue.2
, pp. 111-125
-
-
Bana, E.1
Costa, C.A.2
-
8
-
-
85014053818
-
The assessment of bidding strategy of Iranian construction firms
-
Banki, M.T., Esmaeeli, B., and Ravanshadnia, M. 2008. The assessment of bidding strategy of Iranian construction firms. International Journal of Management Science and Engineering Management, 4(2): 153-160.
-
(2008)
International Journal of Management Science and Engineering Management
, vol.4
, Issue.2
, pp. 153-160
-
-
Banki, M.T.1
Esmaeeli, B.2
Ravanshadnia, M.3
-
9
-
-
12344330124
-
-
Ph.D. dissertation, Arizona State University, Tempe, Ariz
-
Baumann, W.J. 2000. Integrated process framework for network engineering, network operations, and enterprise network management. Ph.D. dissertation, Arizona State University, Tempe, Ariz.
-
(2000)
Integrated Process Framework For Network Engineering, Network Operations, and Enterprise Network Management
-
-
Baumann, W.J.1
-
10
-
-
77955522880
-
Weighted factors scoring model under fuzzy data
-
Winnipeg, Man. Edited by U. Kumar
-
Bector, C.R., Appadoo, S.S., and Chandra, S. 2002. Weighted factors scoring model under fuzzy data. In Proceedings of the Annual Conference of the Administrative Sciences Association of Canada Management Science Division, Winnipeg, Man. Edited by U. Kumar. pp. 95-105.
-
(2002)
Proceedings of The Annual Conference of The Administrative Sciences Association of Canada Management Science Division
, pp. 95-105
-
-
Bector, C.R.1
Appadoo, S.S.2
Chandra, S.3
-
11
-
-
0020339753
-
A fuzzy set based linguistic approach: Theory and applications
-
Edited by M.M. Gupta and E. Sanchez. North-Holland, New York
-
Bonissone, P.P. 1982. A fuzzy set based linguistic approach: Theory and applications. In Approximate Reasoning in Decision Analysis. Edited by M.M. Gupta and E. Sanchez. North-Holland, New York. pp. 329-339.
-
(1982)
Approximate Reasoning In Decision Analysis
, pp. 329-339
-
-
Bonissone, P.P.1
-
12
-
-
33751174088
-
A fuzzy approach to R&D project portfolio selection. International Journal of Approximate Reasoning
-
doi:10.1016/j.ijar.2006.07.003
-
Carlsson, C., Fuller, R., Heikkila, M., and Majlender, P. 2007. A fuzzy approach to R&D project portfolio selection. International Journal of Approximate Reasoning, Elsevier, 44(2): 93-105.doi:10.1016/j.ijar.2006.07.003.
-
(2007)
Elsevier
, vol.44
, Issue.2
, pp. 93-105
-
-
Carlsson, C.1
Fuller, R.2
Heikkila, M.3
Majlender, P.4
-
13
-
-
33751468209
-
-
Tata McGraw-Hill, New Delhi, India
-
Chandra, P. 2002. Projects planning, analysis, selection, financing, implementation and review. Tata McGraw-Hill, New Delhi, India.
-
(2002)
Projects Planning, Analysis, Selection, Financing, Implementation and Review
-
-
Chandra, P.1
-
14
-
-
0003253168
-
Fuzzy logic for evaluating alternative construction technology
-
doi:10.1061/(ASCE)0733-9364(1998)124:4(297)
-
Chao, L.C., and Skibniewski, M.J. 1998. Fuzzy logic for evaluating alternative construction technology. Journal of Construction Engineering and Management, 124(4): 297-304. doi:10.1061/(ASCE)0733-9364(1998)124:4(297).
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.4
, pp. 297-304
-
-
Chao, L.C.1
Skibniewski, M.J.2
-
16
-
-
0034269643
-
Key factors in bid reasoning model
-
doi:10.1061/(ASCE)0733-9364(2000) 126:5(349)
-
Chua, D.K.H., and Li, D. 2000. Key factors in bid reasoning model. Journal of Construction Engineering and Management, 126(5): 349-357.doi:10.1061/(ASCE)0733-9364(2000) 126:5(349).
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.5
, pp. 349-357
-
-
Chua, D.K.H.1
Li, D.2
-
17
-
-
35448932028
-
Project appraisal and selection using the analytical network process
-
doi:10.1139/L07006
-
Dikmen, I., Birgonul, M.T., and Ozorhon, B. 2007. Project appraisal and selection using the analytical network process. Canadian Journal of Civil Engineering, 34(7): 786-792.doi:10.1139/L07006.
-
(2007)
Canadian Journal of Civil Engineering
, vol.34
, Issue.7
, pp. 786-792
-
-
Dikmen, I.1
Birgonul, M.T.2
Ozorhon, B.3
-
19
-
-
33751297100
-
A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Building and Environment
-
Egemen, M., and Mohamed, A.N. 2007. A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Building and Environment, Elsevier, 42(3): 1373-1385.
-
(2007)
Elsevier
, vol.42
, Issue.3
, pp. 1373-1385
-
-
Egemen, M.1
Mohamed, A.N.2
-
20
-
-
77955520855
-
-
Ph.D. thesis, Department of Civil Engineering, University of Illinois, Chicago, Ill
-
Farid, F. 1981. Fair and reasonable markup (FaRM) pricing model: a present value approach to pricing of construction contracts. Ph.D. thesis, Department of Civil Engineering, University of Illinois, Chicago, Ill.
-
(1981)
Fair and Reasonable Markup (FaRM) Pricing Model: A Present Value Approach to Pricing of Construction Contracts
-
-
Farid, F.1
-
21
-
-
85047681882
-
A survey of the bidding practices of Canadian civil engineering construction contractors
-
doi:10.1139/cjce-26-1-13
-
Fayek, A., Ghoshal, I., and AbouRizk, S. 1999. A survey of the bidding practices of Canadian civil engineering construction contractors. Canadian Journal of Civil Engineering, 26(1): 13-25.doi:10.1139/cjce-26-1-13.
-
(1999)
Canadian Journal of Civil Engineering
, vol.26
, Issue.1
, pp. 13-25
-
-
Fayek, A.1
Ghoshal, I.2
Abourizk, S.3
-
22
-
-
0033728960
-
Project portfolio selection through decision support. Decision Support Systems
-
doi:10.1016/S0167-9236(00)00065-8
-
Ghasemzadeh, F., and Archer, N.P. 2000. Project portfolio selection through decision support. Decision Support Systems, Elsevier, 29(1): 73-88. doi:10.1016/S0167-9236(00)00065-8.
-
(2000)
Elsevier
, vol.29
, Issue.1
, pp. 73-88
-
-
Ghasemzadeh, F.1
Archer, N.P.2
-
23
-
-
13944267929
-
Multi-criteria financial portfolio risk management for international projects
-
doi:10.1061/(ASCE)0733-9364(2004) 130:3(346)
-
Han, S.H., Diekmann, J.E., Lee, Y., and Ock, J.H. 2004. Multi-criteria financial portfolio risk management for international projects. Journal of Construction Engineering and Management, 130(3): 346-356. doi:10.1061/(ASCE)0733-9364(2004) 130:3(346).
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.3
, pp. 346-356
-
-
Han, S.H.1
Diekmann, J.E.2
Lee, Y.3
Ock, J.H.4
-
24
-
-
14544305145
-
Contractor's risk attitudes in the selection of international construction projects
-
doi:10.1061/(ASCE)0733-9364(2005)131:3(283)
-
Han, S.H., Diekmann, J.E., and Ock, J.H. 2005. Contractor's risk attitudes in the selection of international construction projects. Journal of Construction Engineering and Management, 131(3): 283-292. doi:10.1061/(ASCE)0733-9364(2005)131:3(283).
-
(2005)
Journal of Construction Engineering and Management
, vol.131
, Issue.3
, pp. 283-292
-
-
Han, S.H.1
Diekmann, J.E.2
Ock, J.H.3
-
25
-
-
0028330587
-
Analogy-based solution to markup estimation problem
-
doi:10.1061/(ASCE)0887-3801(1994) 8:1(72)
-
Hegazy, T., and Moselhi, O. 1994. Analogy-based solution to markup estimation problem. Journal of Computing in Civil Engineering, 8(1): 72-87. doi:10.1061/(ASCE)0887-3801(1994) 8:1(72).
-
(1994)
Journal of Computing In Civil Engineering
, vol.8
, Issue.1
, pp. 72-87
-
-
Hegazy, T.1
Moselhi, O.2
-
26
-
-
41049110990
-
A fuzzy AHP application in government sponsored R&D project selection
-
doi:10.1016/j.omega.2006.05.003
-
Huang, C., Chu, P., and Chiang, Y. 2008. A fuzzy AHP application in government sponsored R&D project selection. Omega, 36(6): 1038-1052. doi:10.1016/j.omega.2006.05.003.
-
(2008)
Omega
, vol.36
, Issue.6
, pp. 1038-1052
-
-
Huang, C.1
Chu, P.2
Chiang, Y.3
-
27
-
-
0019664172
-
Project selection under risk
-
Kangari, R., and Boyer, L.T. 1981. Project selection under risk. Journal of the Construction Division, ASCE, 107(4): 597-608.
-
(1981)
Journal of The Construction Division, ASCE
, vol.107
, Issue.4
, pp. 597-608
-
-
Kangari, R.1
Boyer, L.T.2
-
29
-
-
0018515880
-
An algorithm for rating multiple-aspect alternatives using fuzzy sets
-
doi:10. 1016/0005-1098(79)90010-4
-
Kwakernaak, H. 1979. An algorithm for rating multiple-aspect alternatives using fuzzy sets. Automatica, 15(5): 615-616. doi:10. 1016/0005-1098(79)90010-4.
-
(1979)
Automatica
, vol.15
, Issue.5
, pp. 615-616
-
-
Kwakernaak, H.1
-
30
-
-
3342977741
-
Bid/no-bid decision-making-a fuzzy linguistic approach
-
doi:10.1016/j.ijproman.2004.01.005
-
Lin, C.T., and Chen, Y.T. 2004. Bid/no-bid decision-making-a fuzzy linguistic approach. International Journal of Project Management, 22(7): 585-593.doi:10.1016/j.ijproman.2004.01.005.
-
(2004)
International Journal of Project Management
, vol.22
, Issue.7
, pp. 585-593
-
-
Lin, C.T.1
Chen, Y.T.2
-
31
-
-
39749093168
-
The magical number seven, plus or minus two: Some limits on our capacity for processing information
-
doi:10.1037/h0043158
-
Miller, G.A. 1965. The magical number seven, plus or minus two: some limits on our capacity for processing information. Psychological Review, 63: 81-97. doi:10.1037/h0043158.
-
(1965)
Psychological Review
, vol.63
, pp. 81-97
-
-
Miller, G.A.1
-
32
-
-
0002156761
-
Project selection considering risk
-
doi:10.1080/01446199300000063
-
Moselhi, O., and Deb, B. 1993. Project selection considering risk. Construction Management and Economics, 11(1): 45-52.doi:10.1080/01446199300000063.
-
(1993)
Construction Management and Economics
, vol.11
, Issue.1
, pp. 45-52
-
-
Moselhi, O.1
Deb, B.2
-
33
-
-
0026106979
-
Project risk assessment using the analytical hierarchy process
-
doi:10.1109/17.65759
-
Mustafa, M., and Al-Bahar, J. 1991. Project risk assessment using the analytical hierarchy process. IEEE Transactions on Engineering Management, 38(1): 46-52. doi:10.1109/17.65759.
-
(1991)
IEEE Transactions On Engineering Management
, vol.38
, Issue.1
, pp. 46-52
-
-
Mustafa, M.1
Al-Bahar, J.2
-
34
-
-
0000544458
-
Axiomatic foundation of the analytic hierarchy process
-
doi:10.1287/mnsc.32.7.841
-
Saaty, T.L. 1986. Axiomatic foundation of the analytic hierarchy process. Management Science, 32(7): 841-855. doi:10.1287/mnsc.32.7.841.
-
(1986)
Management Science
, vol.32
, Issue.7
, pp. 841-855
-
-
Saaty, T.L.1
-
36
-
-
0021640515
-
A tutorial on verification and validation of simulation models
-
Dallas, Tex., 28-30 November 1984. Edited by S. Sheppard, U. Pooch, and D. Pegden
-
Sargent, R.G. 1984. A tutorial on verification and validation of simulation models. In Proceedings of the 1984 Winter Simulation Conference, Dallas, Tex., 28-30 November 1984. Edited by S. Sheppard, U. Pooch, and D. Pegden. pp. 115-122.
-
(1984)
Proceedings of The 1984 Winter Simulation Conference
, pp. 115-122
-
-
Sargent, R.G.1
-
37
-
-
84950234637
-
Factors affecting a contractor's mark-up size decision in Saudi Arabia
-
doi:10.1080/01446199200000039
-
Shash, A., and Abdul-Hadi, N.H. 1992. Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10(5): 415-429. doi:10.1080/01446199200000039.
-
(1992)
Construction Management and Economics
, vol.10
, Issue.5
, pp. 415-429
-
-
Shash, A.1
Abdul-Hadi, N.H.2
-
38
-
-
0000958950
-
Priority setting in maintenance management: A modified multi-attribute approach using analytical hierarchy process
-
doi:10.1080/014461998371980
-
Shen, Q., Lo, K., and Wang, K. 1998. Priority setting in maintenance management: a modified multi-attribute approach using analytical hierarchy process. Construction Management and Economics, 16(6): 693-702. doi:10.1080/014461998371980.
-
(1998)
Construction Management and Economics
, vol.16
, Issue.6
, pp. 693-702
-
-
Shen, Q.1
Lo, K.2
Wang, K.3
-
39
-
-
0344789067
-
Analysis of contractors' bidding decisions
-
University of Natal, Durban, South Africa
-
Ting, S.C., and Mills, A. 1996. Analysis of contractors' bidding decisions. Proceedings, CIB W92, International Symposium on Procurement Systems, University of Natal, Durban, South Africa. pp. 53-65.
-
(1996)
Proceedings, CIB W92, International Symposium On Procurement Systems
, pp. 53-65
-
-
Ting, S.C.1
Mills, A.2
-
40
-
-
0035872165
-
Application of new fuzzyweighted average (NFWA) method to engineering design evaluation
-
Vanegas, L.V., and Labib, A.W. 2001. Application of new fuzzyweighted average (NFWA) method to engineering design evaluation. International Journal of Production Research, 36(6): 1147-1162.
-
(2001)
International Journal of Production Research
, vol.36
, Issue.6
, pp. 1147-1162
-
-
Vanegas, L.V.1
Labib, A.W.2
-
41
-
-
11644286526
-
-
Ph.D. thesis, Department of Civil Engineering, University of Illinois at Urbana-Champaign, Urbana, Ill
-
Vergara, A.J. 1977. Probabilistic estimating and applications of portfolio theory in construction. Ph.D. thesis, Department of Civil Engineering, University of Illinois at Urbana-Champaign, Urbana, Ill.
-
(1977)
Probabilistic Estimating and Applications of Portfolio Theory In Construction
-
-
Vergara, A.J.1
-
42
-
-
0028500251
-
Portfolio approach to strategic management of A/E firms
-
doi:10.1061/(ASCE)9742-597X(1994)10:5(41)
-
Veshosky, D. 1994. Portfolio approach to strategic management of A/E firms. Journal of Management Engineering, 10(5): 41-47. doi:10.1061/(ASCE)9742-597X(1994)10:5(41).
-
(1994)
Journal of Management Engineering
, vol.10
, Issue.5
, pp. 41-47
-
-
Veshosky, D.1
-
43
-
-
33748255465
-
A fuzzy set approach for R&D portfolio selection using a real options valuation model
-
doi:10.1016/j.omega.2005.06.002
-
Wang, J., and Hwang, W. 2007. A fuzzy set approach for R&D portfolio selection using a real options valuation model. Omega, 35(3): 247-257. doi:10.1016/j.omega.2005.06.002.
-
(2007)
Omega
, vol.35
, Issue.3
, pp. 247-257
-
-
Wang, J.1
Hwang, W.2
-
44
-
-
0008563034
-
NPV-at-risk method in infrastructure project investment evaluation
-
doi:10.1061/(ASCE) 0733-9364(2000)126:3(227)
-
Ye, S., and Tiong, R.L.K. 2000. NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Engineering and Management, 126(3): 227-233. doi:10.1061/(ASCE) 0733-9364(2000)126:3(227).
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.3
, pp. 227-233
-
-
Ye, S.1
Tiong, R.L.K.2
-
45
-
-
0036501546
-
Strategic implementation of infrastructure priority projects: Case study in Palestine
-
doi:10. 1061/(ASCE)1076-0342(2002)8:1(2)
-
Ziara, M., Nigim, K., Enshassi, A., and Ayyub, B. 2002. Strategic implementation of infrastructure priority projects: Case study in Palestine. Journal of Infrastructure Systems, 8(1): 2-11. doi:10. 1061/(ASCE)1076-0342(2002)8:1(2).
-
(2002)
Journal of Infrastructure Systems
, vol.8
, Issue.1
, pp. 2-11
-
-
Ziara, M.1
Nigim, K.2
Enshassi, A.3
Ayyub, B.4
|