-
1
-
-
0005497164
-
An additive utility model for selecting optimum bid price
-
in, 18(1)
-
Ahmad, I., and Minkarah, I., 1987. “ An additive utility model for selecting optimum bid price ”. In Proc., 18th Annual Pittsburg Conf. on Modelling and Simulation Vol. 18, 367–373. in, 18(1).
-
(1987)
Proc., 18th Annual Pittsburg Conf. on Modelling and Simulation
, vol.18
, pp. 367-373
-
-
Ahmad, I.1
Minkarah, I.2
-
2
-
-
0001072506
-
The effect of contract type and size on competitiveness in bidding
-
Drew, D., and Skitmore, M., 1997. The effect of contract type and size on competitiveness in bidding. Construction Management and Economics, 15:469–489.
-
(1997)
Construction Management and Economics
, vol.15
, pp. 469-489
-
-
Drew, D.1
Skitmore, M.2
-
3
-
-
0002861004
-
Competitive bidding strategy model and software system for bid preparation
-
Fayek, A., 1998. Competitive bidding strategy model and software system for bid preparation. Journal of Construction Engineering and Management, 124 (1):1–10.
-
(1998)
Journal of Construction Engineering and Management
, vol.124
, Issue.1
, pp. 1-10
-
-
Fayek, A.1
-
4
-
-
85047681882
-
A survey of the bidding practices of canadian civil engineering construction contractors
-
Fayek, A., Ghoshal, I., and AbouRizk, S., 1999. A survey of the bidding practices of canadian civil engineering construction contractors. Canadian Journal of Civil Engineering, 26:13–25.
-
(1999)
Canadian Journal of Civil Engineering
, vol.26
, pp. 13-25
-
-
Fayek, A.1
Ghoshal, I.2
AbouRizk, S.3
-
5
-
-
0032272899
-
A survey of tendering practices in the australian construction industry
-
Fayek, A., Young, D., and Duffield, C., 1998. A survey of tendering practices in the australian construction industry. Engineering Management Journal, 10 (4):29–34.
-
(1998)
Engineering Management Journal
, vol.10
, Issue.4
, pp. 29-34
-
-
Fayek, A.1
Young, D.2
Duffield, C.3
-
6
-
-
0001748017
-
A competitive bidding strategy
-
Friedman, L., 1956. A competitive bidding strategy. Oper. Res., 4:104–112.
-
(1956)
Oper. Res.
, vol.4
, pp. 104-112
-
-
Friedman, L.1
-
7
-
-
0002268578
-
Bidding strategies and probabilities
-
ASCE
-
Gates, M., 1967. Bidding strategies and probabilities. Journal of the Construction Division, 93:74–107. ASCE.
-
(1967)
Journal of the Construction Division
, vol.93
, pp. 74-107
-
-
Gates, M.1
-
9
-
-
0032673239
-
Ann-based mark-up estimation system with self-explanatory capacities
-
Li, H., Shen, L., and Love, P., 1999. Ann-based mark-up estimation system with self-explanatory capacities. Journal of Construction Engineering and Management, 125 (3):185–189.
-
(1999)
Journal of Construction Engineering and Management
, vol.125
, Issue.3
, pp. 185-189
-
-
Li, H.1
Shen, L.2
Love, P.3
-
11
-
-
0026381932
-
Neural networks as tools in construction
-
ASCE
-
Moselhi, O., Hegazy, T., and Fazio, P., 1991. Neural networks as tools in construction. J. Constr. Engrg. Mgmt., 117 (4):606–625. ASCE.
-
(1991)
J. Constr. Engrg. Mgmt.
, vol.117
, Issue.4
, pp. 606-625
-
-
Moselhi, O.1
Hegazy, T.2
Fazio, P.3
-
12
-
-
0035335579
-
Predicting accuracy of early cost estimates based on estimate quality
-
Oberlender, G., and Trost, S., 2001. Predicting accuracy of early cost estimates based on estimate quality. J. Constr. Eng. Manage., 127 (3):173–182.
-
(2001)
J. Constr. Eng. Manage.
, vol.127
, Issue.3
, pp. 173-182
-
-
Oberlender, G.1
Trost, S.2
-
13
-
-
0024683940
-
Bid markup assistant: An expert system
-
Tavakoli, A., and Utomo, J., 1989. Bid markup assistant:An expert system. Cost Engrg. J., 31 (6):28–33.
-
(1989)
Cost Engrg. J.
, vol.31
, Issue.6
, pp. 28-33
-
-
Tavakoli, A.1
Utomo, J.2
-
14
-
-
0344031956
-
-
Proceedings of the 14th annual ARCOM conference, in
-
Wanous, M., Boussabaine, A., and Lewis, J., Tendering factors considered by syrian contractors. Proceedings of the 14th annual ARCOM conference. Vol. 2, pp. 535 in
-
Tendering factors considered by syrian contractors
, vol.2
, pp. 535
-
-
Wanous, M.1
Boussabaine, A.2
Lewis, J.3
|