메뉴 건너뛰기




Volumn 26, Issue 1, 1999, Pages 13-25

Survey of the bidding practices of Canadian civil engineering construction contractors

Author keywords

[No Author keywords available]

Indexed keywords

COMPETITION; CONSTRUCTION INDUSTRY; CONTRACTS; DECISION MAKING; RISK MANAGEMENT;

EID: 85047681882     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/l98-038     Document Type: Article
Times cited : (47)

References (10)
  • 1
    • 0024053852 scopus 로고
    • Questionnaire survey on bidding in construction
    • Ahmad, I., and Minkarah, I. 1988. Questionnaire survey on bidding in construction. Journal of Management in Engineering, 4(3): 229-243.
    • (1988) Journal of Management in Engineering , vol.4 , Issue.3 , pp. 229-243
    • Ahmad, I.1    Minkarah, I.2
  • 4
    • 0345377384 scopus 로고    scopus 로고
    • Report on the University of Alberta's investigative study into the bidding practices of Canadian civil engineering contractors
    • Department of Civil and Environmental Engineering, University of Alberta, Edmonton, Alta.
    • Ghoshal, I., and Fayek, A. 1997. Report on the University of Alberta's investigative study into the bidding practices of Canadian civil engineering contractors. Technical Report, Department of Civil and Environmental Engineering, University of Alberta, Edmonton, Alta.
    • (1997) Technical Report
    • Ghoshal, I.1    Fayek, A.2
  • 5
    • 0030193386 scopus 로고    scopus 로고
    • Factors affecting the bidding behaviour of contractors in Egypt
    • Hassanein, A.G. 1996. Factors affecting the bidding behaviour of contractors in Egypt. Building Research and Information, 24(4): 228-236.
    • (1996) Building Research and Information , vol.24 , Issue.4 , pp. 228-236
    • Hassanein, A.G.1
  • 6
    • 0344083991 scopus 로고    scopus 로고
    • Canada's top 100 contractors
    • Heavy Construction News, June
    • Heavy Construction News. 1997. Canada's top 100 contractors. Heavy Construction News, June, pp. 13-24.
    • (1997) Heavy Construction News , pp. 13-24
  • 7
    • 0029296896 scopus 로고
    • Elements of cost estimation: A survey in Canada and the United States
    • Hegazy, T., and Moselhi, O. 1995. Elements of cost estimation: a survey in Canada and the United States. Cost Engineering, 37(5): 27-33.
    • (1995) Cost Engineering , vol.37 , Issue.5 , pp. 27-33
    • Hegazy, T.1    Moselhi, O.2
  • 8
    • 0000643379 scopus 로고
    • Factors considered in tendering decisions by top UK contractors
    • Shash, A.A. 1993. Factors considered in tendering decisions by top UK contractors. Construction Management and Economics, 11: 111-118.
    • (1993) Construction Management and Economics , vol.11 , pp. 111-118
    • Shash, A.A.1
  • 9
    • 0344515203 scopus 로고
    • Competitive bidding system
    • Shash, A.A. 1995. Competitive bidding system. Cost Engineering 37(2): 19-20.
    • (1995) Cost Engineering , vol.37 , Issue.2 , pp. 19-20
    • Shash, A.A.1
  • 10
    • 84950234637 scopus 로고
    • Factors affecting a contractor's mark-up size decision in Saudi Arabia
    • Shash, A.A., and Abdul-Hadi, N.H. 1992. Factors affecting a contractor's mark-up size decision in Saudi Arabia. Construction Management and Economics, 10: 415-429.
    • (1992) Construction Management and Economics , vol.10 , pp. 415-429
    • Shash, A.A.1    Abdul-Hadi, N.H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.