-
2
-
-
67650448174
-
Value-based Multiple Software Projects Scheduling with Genetic Algorithm
-
Wang, Q., Garousi, V., Madachy, R., Pfahl, D. (eds.) ICSP 2009. Springer, Heidelberg
-
Xiao, J., Wang, Q., Li, M., Yang, Q., Xie, L., Liu, D.: Value-based Multiple Software Projects Scheduling with Genetic Algorithm. In: Wang, Q., Garousi, V., Madachy, R., Pfahl, D. (eds.) ICSP 2009. LNCS, vol. 5543, pp. 50-62. Springer, Heidelberg (2009)
-
(2009)
LNCS
, vol.5543
, pp. 50-62
-
-
Xiao, J.1
Wang, Q.2
Li, M.3
Yang, Q.4
Xie, L.5
Liu, D.6
-
3
-
-
84892018378
-
-
Springer, Heidelberg
-
Biffl, S., Aurum, A., Boehm, B., Erdogmus, H., Grünbacher, P.: Value-Based Software Engineering. Springer, Heidelberg (2005)
-
(2005)
Value-Based Software Engineering
-
-
Biffl, S.1
Aurum, A.2
Boehm, B.3
Erdogmus, H.4
Grünbacher, P.5
-
4
-
-
40249093024
-
Staffing a software project: A constraint satisfaction and optimization-based approach
-
Barreto, A., Barros, M.d.O., Werner, C.M.L.: Staffing a software project: A constraint satisfaction and optimization-based approach. Computer & Operations Research 35, 3073-3089 (2008)
-
(2008)
Computer & Operations Research
, vol.35
, pp. 3073-3089
-
-
Barreto, A.1
Barros, M.D.O.2
Werner, C.M.L.3
-
5
-
-
34848904519
-
Surgical case scheduling as a generalized job shop scheduling problem
-
Pham, D.-N., Klinkert, A.: Surgical case scheduling as a generalized job shop scheduling problem. European Journal of Operational Research 185, 1011-1025 (2008)
-
(2008)
European Journal of Operational Research
, vol.185
, pp. 1011-1025
-
-
Pham, D.-N.1
Klinkert, A.2
-
6
-
-
40849142091
-
A Genetic Algorithm for the Resource Constrained Multi-project Scheduling Problem
-
Goncalves, J.F., Mendes, J.J.M., Resende, M.G.C.: A Genetic Algorithm for the Resource Constrained Multi-project Scheduling Problem. European Journal of Operational Research 189, 1171-1190 (2008)
-
(2008)
European Journal of Operational Research
, vol.189
, pp. 1171-1190
-
-
Goncalves, J.F.1
Mendes, J.J.M.2
Resende, M.G.C.3
-
7
-
-
77955441694
-
A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem
-
Peteghem, V.V., Vanhoucke, M.: A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem. European Journal of Operational Research (2009)
-
(2009)
European Journal of Operational Research
-
-
Peteghem, V.V.1
Vanhoucke, M.2
-
8
-
-
84902545125
-
Scheduling and Simulation
-
Herrmann, J.W. (ed.) Springer, US
-
Fowler, J.W., Monch, L., Rose, O.: Scheduling and Simulation. In: Herrmann, J.W. (ed.) Handbook of Production Scheduling, pp. 109-133. Springer, US (2006)
-
(2006)
Handbook of Production Scheduling
, pp. 109-133
-
-
Fowler, J.W.1
Monch, L.2
Rose, O.3
-
9
-
-
34447296449
-
Stability-oriented evaluation of rescheduling strategies, by using simulation
-
Pfeiffer, A.s., Kadar, B., Monostori, L.s.: Stability-oriented evaluation of rescheduling strategies, by using simulation. Computers in Industry 58, 630-643 (2007)
-
(2007)
Computers in Industry
, vol.58
, pp. 630-643
-
-
Pfeiffer, A.S.1
Kadar, B.2
Monostori, L.S.3
-
11
-
-
13444269168
-
Project scheduling under uncertainty: Survey and research potentials
-
DOI 10.1016/j.ejor.2004.04.002, PII S0377221704002401, Project Management and Scheduling
-
Herroelen, W., Leus, R.: Project Scheduling under Uncertainty: Survey and Research Potentials. European Journal of Operational Research 165, 289-306 (2005) (Pubitemid 40206362)
-
(2005)
European Journal of Operational Research
, vol.165
, Issue.2
, pp. 289-306
-
-
Herroelen, W.1
Leus, R.2
-
12
-
-
14844331782
-
A Robust Search-Based Approach to Project Management in the Presence of Abandonment, Rework, Error and Uncertainty
-
Antoniol, G., Penta, M.D., Harman, M.: A Robust Search-Based Approach to Project Management in the Presence of Abandonment, Rework, Error and Uncertainty. In: Proceedings of the 10th International Symposium on Software Metrics, pp. 172-183 (2004)
-
(2004)
Proceedings of the 10th International Symposium on Software Metrics
, pp. 172-183
-
-
Antoniol, G.1
Penta, M.D.2
Harman, M.3
-
15
-
-
0141859879
-
A fuzzy robust scheduling approach for product development projects
-
Wang, J.: A fuzzy robust scheduling approach for product development projects. European Journal of Operational Research 152, 180-194 (2004)
-
(2004)
European Journal of Operational Research
, vol.152
, pp. 180-194
-
-
Wang, J.1
-
17
-
-
1442285828
-
Dynamic rescheduling that simultaneously considers efficiency and stability
-
Rangsaritratsamee, R., Ferrell Jr., W.G., Kurz, M.B.: Dynamic rescheduling that simultaneously considers efficiency and stability. Computers & Industrial Engineering 46, 1-15 (2004)
-
(2004)
Computers & Industrial Engineering
, vol.46
, pp. 1-15
-
-
Rangsaritratsamee, R.1
Ferrell Jr., W.G.2
Kurz, M.B.3
-
18
-
-
36048929477
-
Single Machine Rescheduling with New Jobs Arrivals and Processing Time Compression
-
Yang, B.: Single Machine Rescheduling with New Jobs Arrivals and Processing Time Compression. International Journal of Advanced Manufacturing Technology 34, 378-384 (2007)
-
(2007)
International Journal of Advanced Manufacturing Technology
, vol.34
, pp. 378-384
-
-
Yang, B.1
-
19
-
-
77955444855
-
-
Department of Computer Science, University of Massachusetts, Amherst, MA 01003 UM-CS-2009-050
-
Xiao, J., Osterweil, L.J., Wang, Q., Li, M.: Dynamic Resource Scheduling in Disruption-Prone Software Development Environments. Department of Computer Science, University of Massachusetts, Amherst, MA 01003 UM-CS-2009-050 (2009)
-
(2009)
Dynamic Resource Scheduling in Disruption-Prone Software Development Environments
-
-
Xiao, J.1
Osterweil, L.J.2
Wang, Q.3
Li, M.4
-
21
-
-
0033683614
-
Little-JIL/Juliette: A Process Definition Language and Interpreter
-
Cass, A.G., Lerner, B.S., McCall, E.K., Osterweil, L.J., Stanley, J., Sutton, M., Wise, A.: Little-JIL/Juliette: A Process Definition Language and Interpreter. In: Proceedings of the 22nd International Conference on Software Engineering, Limerick, Ireland, pp. 754-757 (2000)
-
(2000)
Proceedings of the 22nd International Conference on Software Engineering, Limerick, Ireland
, pp. 754-757
-
-
Cass, A.G.1
Lerner, B.S.2
McCall, E.K.3
Osterweil, L.J.4
Stanley, J.5
Sutton, M.6
Wise, A.7
-
22
-
-
35348918836
-
-
Department of Computer Science, University of Massachusetts, Amherst UM-CS-2006-51
-
Wise, A.: Little-JIL 1.5 Language Report, Department of Computer Science, University of Massachusetts, Amherst UM-CS-2006-51 (2006)
-
(2006)
Little-JIL 1.5 Language Report
-
-
Wise, A.1
-
23
-
-
77951289543
-
-
Department of Computer Science at the University of Massachusetts Amherst. Technical report: UM-CS-2009-049
-
Xiao, J., Osterweil, L.J., Wang, Q., Li, M.: Dynamic Scheduling in Systems with Complex Resource Allocation Requirements. Department of Computer Science at the University of Massachusetts Amherst. Technical report: UM-CS-2009-049 (2009)
-
(2009)
Dynamic Scheduling in Systems with Complex Resource Allocation Requirements
-
-
Xiao, J.1
Osterweil, L.J.2
Wang, Q.3
Li, M.4
|