Project procurement system selection model
-
ASCE
-
Alhazmi, T. and McCaffer, R. (2000), "Project procurement system selection model". Journal of Construction Engineering and Management, Vol. 126 No. 3, ASCE, pp. 176-84.
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.3
, pp. 176-184
-
-
Alhazmi, T.1
McCaffer, R.2
-
2
-
-
0035399186
-
Improving objectivity in procurement selection
-
ASCE
-
Cheung, S.O., Lam, T.I., Wan, Y.W. and Lam, K.C. (2001), "Improving objectivity in procurement selection", Journal of Management in Engineering, Vol. 17 No. 3, ASCE, pp. 132-9.
-
(2001)
Journal of Management in Engineering
, vol.17
, Issue.3
, pp. 132-139
-
-
Cheung, S.O.1
Lam, T.I.2
Wan, Y.W.3
Lam, K.C.4
-
4
-
-
0032090714
-
Outranking methods in support of supplier selection
-
de Boer, L., van der Wegen, L. and Telgen, J. (1998), "Outranking methods in support of supplier selection", European Journal of Purchasing and Supply Management Vol. 4 No. 2/3, pp. 109-18.
-
(1998)
European Journal of Purchasing and Supply Management
, vol.4
, Issue.2-3
, pp. 109-118
-
-
De Boer, L.1
Van Der Wegen, L.2
Telgen, J.3
-
5
-
-
0342969865
-
-
Design-Build Institute of America, Washington, DC
-
Design-Build Institute of America (1999), Design-Build Manual of Practice, 2nd ed., Design-Build Institute of America, Washington, DC.
-
(1999)
Design-build Manual of Practice, 2nd Ed.
-
-
-
6
-
-
0036143916
-
Developing tendering strategy in two-envelope fee tendering based on technical score-fee variability
-
Drew, D.S., Tang, L.Y. and Lo, H.P. (2002a), "Developing tendering strategy in two-envelope fee tendering based on technical score-fee variability", Construction Management and Economics, Vol. 20 No. 1, pp. 67-81.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.1
, pp. 67-81
-
-
Drew, D.S.1
Tang, L.Y.2
Lo, H.P.3
-
7
-
-
0036499486
-
Correcting the fee-technical score variability imbalance in two-envelope fee tendering
-
Drew, D.S., Lai, P.Y., Li, H. and Lo, H.P. (2002b), "Correcting the fee-technical score variability imbalance in two-envelope fee tendering", Construction Management and Economics, Vol. 20 No. 2, pp. 157-66.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.2
, pp. 157-166
-
-
Drew, D.S.1
Lai, P.Y.2
Li, H.3
Lo, H.P.4
-
8
-
-
3242682780
-
-
Finance Bureau, Government Secretariat, Government of Hong Kong Special Administrative Region, Hong Kong
-
Finance Bureau (1997), A Guide to Procurement, Finance Bureau, Government Secretariat, Government of Hong Kong Special Administrative Region, Hong Kong.
-
(1997)
A Guide to Procurement
-
-
-
9
-
-
0342651716
-
-
Topic No. 625-020-010-a, Office of Environment Management, FDOT, Tallahassee, FL
-
Florida Department of Transportation (FDOT) (1996), Design-Build Procurement and Administration, Topic No. 625-020-010-a, Office of Environment Management, FDOT, Tallahassee, FL
-
(1996)
Design-build Procurement and Administration
-
-
-
10
-
-
0001119781
-
Final contractor selection using the analytical hierarchy process
-
Fong, P.S. and Choi, S.K. (2000), "Final contractor selection using the analytical hierarchy process", Construction Management and Economics, Vol. 18 No. 5, pp. 547-57.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.5
, pp. 547-557
-
-
Fong, P.S.1
Choi, S.K.2
-
12
-
-
0030686122
-
Evaluating best value contract proposals
-
C&C.04.1 to C&C.04.5, AACE International, Dallas, TX
-
Gransberg, D.D. (1997), "Evaluating best value contract proposals", 1997 AACE Transactions, C&C.04.1 to C&C.04.5, AACE International, Dallas, TX.
-
(1997)
1997 AACE Transactions
-
-
Gransberg, D.D.1
-
13
-
-
0029708514
-
Best value contracting: Breaking the low-bid paradigm
-
VE&C.5.1-VE&C.5.4, AACE International, Vancouver
-
Gransberg, D.D. and Ellicott, M.A. (1996), "Best value contracting: breaking the low-bid paradigm", 1996 AACE Transactions, VE&C.5.1-VE&C.5.4, AACE International, Vancouver.
-
(1996)
1996 AACE Transactions
-
-
Gransberg, D.D.1
Ellicott, M.A.2
-
14
-
-
0010137271
-
Best value contracting criteria
-
Gransberg, D.D. and Ellicott, M.A. (1997), "Best value contracting criteria", Cost Engineering, Vol. 39 No. 6, pp. 31-4.
-
(1997)
Cost Engineering
, vol.39
, Issue.6
, pp. 31-34
-
-
Gransberg, D.D.1
Ellicott, M.A.2
-
16
-
-
0030681180
-
Application of neural networks to owner-contractor prequalification
-
Kartam, N., Flood, I. and Garett, J.H. (Eds), ASCE, New York, NY, pp. 124-36
-
Hanna, A.S., Russell, J.S., Taha, M.A. and Park, S.C. (1997), "Application of neural networks to owner-contractor prequalification", in Kartam, N., Flood, I. and Garett, J.H. (Eds), Artificial Neural Networks for Civil Engineers: Fundamentals and Applications, ASCE, New York, NY, pp. 124-36.
-
(1997)
Artificial Neural Networks for Civil Engineers: Fundamentals and Applications
-
-
Hanna, A.S.1
Russell, J.S.2
Taha, M.A.3
Park, S.C.4
-
17
-
-
0000771440
-
Assessment and evaluation of contractor data against client goals using PERT approach
-
Hatush, Z. and Skitmore, M (1997), "Assessment and evaluation of contractor data against client goals using PERT approach", Construction Management and Economics, Vol. 15 No. 4, pp. 327-40.
-
(1997)
Construction Management and Economics
, vol.15
, Issue.4
, pp. 327-340
-
-
Hatush, Z.1
Skitmore, M.2
-
18
-
-
0032023054
-
Contractor selection using multicriteria utility theory: An additive mode
-
Hatush, Z. and Skitmore, M. (1998), "Contractor selection using multicriteria utility theory: an additive mode", Building and Environment, Vol. 33 No. 2/3, pp. 105-15.
-
(1998)
Building and Environment
, vol.33
, Issue.2-3
, pp. 105-115
-
-
Hatush, Z.1
Skitmore, M.2
-
19
-
-
0032098746
-
Which contractor selection methodology?
-
Holt, G.D. (1998), "Which contractor selection methodology?". International Journal of Project Management, Vol. 16 No. 3, pp. 153-64.
-
(1998)
International Journal of Project Management
, vol.16
, Issue.3
, pp. 153-164
-
-
Holt, G.D.1
-
20
-
-
0002766723
-
Evaluating performance potential in the selection of construction contractors
-
Holt, G.D., Olomolaiye, P.O. and Harris, F.C. (1994), "Evaluating performance potential in the selection of construction contractors", Engineering, Construction and Architectural Management, Vol. 1 No. 1, pp. 29-50.
-
(1994)
Engineering, Construction and Architectural Management
, vol.1
, Issue.1
, pp. 29-50
-
-
Holt, G.D.1
Olomolaiye, P.O.2
Harris, F.C.3
-
21
-
-
0001885315
-
Tendering procedures, contractual arrangements and Latham: The contractors' view
-
Holt, G.D., Olomolaiye, P.O. and Harris, F.C. (1996), "Tendering procedures, contractual arrangements and Latham: the contractors' view", Engineering, Construction and Architectural Management, Vol. 3 No. 1/2, pp. 97-115.
-
(1996)
Engineering, Construction and Architectural Management
, vol.3
, Issue.1-2
, pp. 97-115
-
-
Holt, G.D.1
Olomolaiye, P.O.2
Harris, F.C.3
-
22
-
-
0347877894
-
A just-in-time evaluation strategy for international procurement
-
Humphreys, P., Mak. P.I. and Yeung, C.M. (1998), "A just-in-time evaluation strategy for international procurement". Journal of Supply Chain Management, Vol. 3 No. 4, pp. 175-86.
-
(1998)
Journal of Supply Chain Management
, vol.3
, Issue.4
, pp. 175-186
-
-
Humphreys, P.1
Mak, P.I.2
Yeung, C.M.3
-
23
-
-
3242709803
-
Construction project briefing/architectural programming
-
Kelly, J., Morledge, R., and Wilkinson, S. (Eds), published in conjunction with RICS Foundation, Blackwell Publishing, Oxford
-
Kelly, J. and Duerk, D. (2002), "Construction project briefing/architectural programming", in Kelly, J., Morledge, R., and Wilkinson, S. (Eds), Best Value in Construction, published in conjunction with RICS Foundation, Blackwell Publishing, Oxford.
-
(2002)
Best Value in Construction
-
-
Kelly, J.1
Duerk, D.2
-
24
-
-
84859030836
-
A value management approach to aligning the team to the client's value system
-
Kelly, J. and Male, S. (2001), "A value management approach to aligning the team to the client's value system", Proceedings of the RICS Foundation Construction and Building Research Conference (COBRA) 2001, Vol. 1, pp. 107-16.
-
(2001)
Proceedings of the RICS Foundation Construction and Building Research Conference (COBRA) 2001
, vol.1
, pp. 107-116
-
-
Kelly, J.1
Male, S.2
-
25
-
-
0036680985
-
Selecting the appropriate project delivery method using the AHP
-
Khalil, M.I. (2002), "Selecting the appropriate project delivery method using the AHP", International Journal of Project Management, Vol. 20 No. 6, pp. 469-74.
-
(2002)
International Journal of Project Management
, vol.20
, Issue.6
, pp. 469-474
-
-
Khalil, M.I.1
-
26
-
-
0030147931
-
Contractor evaluation and selection - A Hong Kong perspective
-
Kumaraswamy, M.M. (1996), "Contractor evaluation and selection - a Hong Kong perspective", Building and Environment Journal, Vol. 31 No. 3, pp. 273-82.
-
(1996)
Building and Environment Journal
, vol.31
, Issue.3
, pp. 273-282
-
-
Kumaraswamy, M.M.1
-
27
-
-
0034744971
-
Developing a decision support system for building project procurement
-
Kumaraswamy, M.M. and Dissanayaka, S.M. (2001), "Developing a decision support system for building project procurement", Building and Environment Journal, Vol. 36 No. 3, pp. 337-49.
-
(2001)
Building and Environment Journal
, vol.36
, Issue.3
, pp. 337-349
-
-
Kumaraswamy, M.M.1
Dissanayaka, S.M.2
-
28
-
-
3242719894
-
A cost or value orientation? Aligning project cost management within the project value chain
-
Male, S. (2001), "A cost or value orientation? Aligning project cost management within the project value chain", Proceedings of the International Conference on Project Cost Management, Beijing, China, May, pp. 21-30.
-
(2001)
Proceedings of the International Conference on Project Cost Management, Beijing, China, May
, pp. 21-30
-
-
Male, S.1
-
29
-
-
0035482649
-
Web-based decision support systems: A case study in project delivery
-
Molenaar, K.R. and Songer, A.D. (2001), "Web-based decision support systems: a case study in project delivery", Journal of Computing in Civil Engineering, Vol. 15 No. 4, pp. 259-67.
-
(2001)
Journal of Computing in Civil Engineering
, vol.15
, Issue.4
, pp. 259-267
-
-
Molenaar, K.R.1
Songer, A.D.2
-
30
-
-
0006591191
-
-
Progress Report No. 5 under Special Experimental Project (September 14), Division of Capital Program Management, NJDOT, NJ
-
New Jersey Department of Transportation (NJDOT) (1999), New Jersey's Modified Design/Build Program Progress Report, Progress Report No. 5 under Special Experimental Project (September 14), Division of Capital Program Management, NJDOT, NJ.
-
(1999)
New Jersey's Modified Design/Build Program Progress Report
-
-
-
31
-
-
0010607967
-
A hybrid rule-based/multi-attribute model for the preselection of bidders
-
Ng, S.T. and Skitmore, R.M. (2000), "A hybrid rule-based/multi- attribute model for the preselection of bidders", International Journal of Computer Integrated Design and Construction, Vol. 2 No. 3, pp. 144-56.
-
(2000)
International Journal of Computer Integrated Design and Construction
, vol.2
, Issue.3
, pp. 144-156
-
-
Ng, S.T.1
Skitmore, R.M.2
-
32
-
-
0022128664
-
Tender evaluation by fuzzy sets
-
ASCE
-
Nguyen, V.U. (1985), "Tender evaluation by fuzzy sets", Journal of Construction Engineering and Management, Vol. 111 No. 3, ASCE, pp. 231-43.
-
(1985)
Journal of Construction Engineering and Management
, vol.111
, Issue.3
, pp. 231-243
-
-
Nguyen, V.U.1
-
33
-
-
0001886332
-
Using the analytic hierarchy process to structure the supplier selection procedure
-
Spring
-
Nydick, R.L. and Hill, R.P. (1992), "Using the analytic hierarchy process to structure the supplier selection procedure", Journal of Purchasing and Materials Management, Spring, pp. 31-6.
-
(1992)
Journal of Purchasing and Materials Management
, pp. 31-36
-
-
Nydick, R.L.1
Hill, R.P.2
-
34
-
-
0026881078
-
Selection of design/build proposal using fuzzy-logic system
-
Paek, J.H., Lee, Y.W. and Napier, T.R. (1992), "Selection of design/build proposal using fuzzy-logic system", Journal of Construction Engineering and Management, Vol. 118 No. 2, pp. 303-17.
-
(1992)
Journal of Construction Engineering and Management
, vol.118
, Issue.2
, pp. 303-317
-
-
Paek, J.H.1
Lee, Y.W.2
Napier, T.R.3
-
35
-
-
0001274605
-
Dynamic contractor prequalification
-
Hughes, W. (Ed.)
-
Palaneeswaran, E. and Kumaraswamy, M.M. (1999), "Dynamic contractor prequalification", in Hughes, W. (Ed.), Proceedings of the 15th Annual ARCOM Conference, Organized by the Association of Researchers in Construction Management, Liverpool, UK, pp. 615-24.
-
(1999)
Proceedings of the 15th Annual ARCOM Conference, Organized by the Association of Researchers in Construction Management, Liverpool, UK
, pp. 615-624
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
36
-
-
84993069603
-
Benchmarking contractor selection practices in public sector construction - A proposed model
-
Palaneeswaran, E. and Kumaraswamy, M.M. (2000a), "Benchmarking contractor selection practices in public sector construction - a proposed model", Engineering, Construction and Architectural Management Journal, Vol. 7 No. 3, pp. 285-99.
-
(2000)
Engineering, Construction and Architectural Management Journal
, vol.7
, Issue.3
, pp. 285-299
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
37
-
-
0034271075
-
Contractor selection for design-build projects
-
Palaneeswaran, E. and Kumaraswamy, M.M. (2000b), "Contractor selection for design-build projects", Journal of Construction Engineering and Management, Vol. 126 No. 5, pp. 331-9.
-
(2000)
Journal of Construction Engineering and Management
, vol.126
, Issue.5
, pp. 331-339
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
38
-
-
2342518458
-
Multi-criteria decision making framework for contractor selection
-
Mangin, J.C. and Miramond, M. (Eds)
-
Palaneeswaran, E. and Kumaraswamy, M.M. (2000c), "Multi-criteria decision making framework for contractor selection", in Mangin, J.C. and Miramond, M. (Eds), Proceedings of the 2nd International Conference on Decision Making in Urban and Civil Engineering, Lyon, France, pp. 991-1002.
-
(2000)
Proceedings of the 2nd International Conference on Decision Making in Urban and Civil Engineering, Lyon, France
, pp. 991-1002
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
39
-
-
3242657522
-
Knowledge mining of information sources for research in construction management
-
ASCE
-
Palaneeswaran, E. and Kumaraswamy, M.M. (2003), "Knowledge mining of information sources for research in construction management", Construction Engineering and Management, Vol. 129 No. 2, ASCE, pp. 182-91.
-
(2003)
Construction Engineering and Management
, vol.129
, Issue.2
, pp. 182-191
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
40
-
-
0035212291
-
Recent advances and proposed improvements in contractor prequalification methodologies
-
Palaneeswaran, E. and Kumaraswamy, M.M. (2001), "Recent advances and proposed improvements in contractor prequalification methodologies", Building and Environment Journal, Vol. 36, pp. 73-87.
-
(2001)
Building and Environment Journal
, vol.36
, pp. 73-87
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
-
41
-
-
0035322223
-
Reforging construction supply chains: A source selection perspective
-
Palaneeswaran, E., Kumaraswamy, M.M. and Zhang, X.Q. (2001), "Reforging construction supply chains: a source selection perspective", European Journal of Purchasing and Supply Management, Vol. 8 No. 1, pp. 7-12.
-
(2001)
European Journal of Purchasing and Supply Management
, vol.8
, Issue.1
, pp. 7-12
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
Zhang, X.Q.3
-
42
-
-
0037399418
-
Curing congenital construction industry concerns through relationally integrated supply chains
-
Palaneeswaran, E., Kumaraswamy, M.M., Rahman, M.M. and Ng, T.S.T. (2003), "Curing congenital construction industry concerns through relationally integrated supply chains", Building and Environment Journal, Vol. 38 No. 4, pp. 571-82.
-
(2003)
Building and Environment Journal
, vol.38
, Issue.4
, pp. 571-582
-
-
Palaneeswaran, E.1
Kumaraswamy, M.M.2
Rahman, M.M.3
Ng, T.S.T.4
-
43
-
-
0000827381
-
Applying transactional costing and relational contracting principles to improved risk management and contractor selection
-
May
-
Rahman, M., Palaneeswaran, E. and Kumaraswamy, M.M. (2001), "Applying transactional costing and relational contracting principles to improved risk management and contractor selection", Proceedings of the 2001 International Conference on Project Cost Management, Beijing, China, May, pp. 171-81.
-
(2001)
Proceedings of the 2001 International Conference on Project Cost Management, Beijing, China
, pp. 171-181
-
-
Rahman, M.1
Palaneeswaran, E.2
Kumaraswamy, M.M.3
-
44
-
-
0042951149
-
Decision models for analysis and evaluation of construction contractors
-
Russell, J.S. (1992), "Decision models for analysis and evaluation of construction contractors", Construction Management and Economics, Vol. 10, pp. 185-202.
-
(1992)
Construction Management and Economics
, vol.10
, pp. 185-202
-
-
Russell, J.S.1
-
45
-
-
0032083413
-
Optimization for bidder profitability and contractor selection
-
Singh, A. (1998), "Optimization for bidder profitability and contractor selection", Cost Engineering, Vol. 40 No. 6, pp. 31-41.
-
(1998)
Cost Engineering
, vol.40
, Issue.6
, pp. 31-41
-
-
Singh, A.1
-
46
-
-
67651079207
-
Which procurement system? Towards a universal procurement selection technique
-
Skitmore, R.M. and Marsden, D.E. (1988), "Which procurement system? Towards a universal procurement selection technique", Construction Management and Economics, Vol. 6 No. 1, pp. 71-89.
-
(1988)
Construction Management and Economics
, vol.6
, Issue.1
, pp. 71-89
-
-
Skitmore, R.M.1
Marsden, D.E.2
-
47
-
-
0031126205
-
Evaluation of proposals for BOT projects
-
Tiong, R.L.K. and Alum, J. (1997), "Evaluation of proposals for BOT projects", International Journal of Project Management, Vol. 15 No. 2, pp. 67-72.
-
(1997)
International Journal of Project Management
, vol.15
, Issue.2
, pp. 67-72
-
-
Tiong, R.L.K.1
Alum, J.2
-
48
-
-
3242695479
-
Contracting for best value - A best practice guide to source selection
-
United States Army Material Command, Alexandria, VA
-
United States Army Material Command (1998), "Contracting for best value - a best practice guide to source selection", AMC Pamphlet 715-3, United States Army Material Command, Alexandria, VA.
-
(1998)
AMC Pamphlet 715-3
-
-
-
49
-
-
3242699939
-
-
Report Number UT-98.06, October 1997, Utah Department of Transportation, Salt Lake City, UT
-
Utah Department of Transportation (1997), 1-15 Corridor Reconstruction Project: Special Experimental Project 14 - Design/Build Contracting, Initial Report, Report Number UT-98.06, October 1997, Utah Department of Transportation, Salt Lake City, UT.
-
(1997)
1-15 Corridor Reconstruction Project: Special Experimental Project 14 - Design/Build Contracting, Initial Report
-
-
-
50
-
-
3242707138
-
Prequalification: It's time to rethink our evaluation standards
-
Design-Build Institute of America, Washington, DC
-
Warne, T.R. (2002), "Prequalification: it's time to rethink our evaluation standards", Design-Build DATELINE, Design-Build Institute of America, Washington, DC, Vol. 9 No. 8, p. 10.
-
(2002)
Design-build DATELINE
, vol.9
, Issue.8
, pp. 10
-
-
Warne, T.R.1
-
51
-
-
0344031908
-
Lowest price or value? investigation of UK construction clients' tender selection process
-
Wong, C.H., Holt, G.D. and Cooper, A.C. (2000), "Lowest price or value? investigation of UK construction clients' tender selection process", Construction Management and Economics, Vol. 18, pp. 767-74.
-
(2000)
Construction Management and Economics
, vol.18
, pp. 767-774
-
-
Wong, C.H.1
Holt, G.D.2
Cooper, A.C.3
-
52
-
-
84993033383
-
Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences
-
Wong, C.H., Holt, G.D. and Harris, P. (2001), "Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences", Engineering, Construction and Architectural Management, Vol. 8 No. 4, pp. 257-71.
-
(2001)
Engineering, Construction and Architectural Management
, vol.8
, Issue.4
, pp. 257-271
-
-
Wong, C.H.1
Holt, G.D.2
Harris, P.3
-
53
-
-
0008159226
-
Low bidders needn't apply
-
Wright, G. (1998), "Low bidders needn't apply", Building Design & Construction, Vol. 39 No. 9, pp. 52-6.
-
(1998)
Building Design & Construction
, vol.39
, Issue.9
, pp. 52-56
-
-
Wright, G.1
|