메뉴 건너뛰기




Volumn 10, Issue 6, 2003, Pages 418-431

Targeting optimum value in public sector projects through "best value"-focused contractor selection

Author keywords

Construction works; Contract costs; Public finance; Value chain

Indexed keywords

CONSTRUCTION; CONTRACTS; COSTS; ECONOMIC AND SOCIAL EFFECTS; FEEDBACK; FINANCE; OPTIMIZATION; PERSONNEL; RELIABILITY; RISKS;

EID: 3242721188     PISSN: 09699988     EISSN: None     Source Type: Journal    
DOI: 10.1108/09699980310509390     Document Type: Review
Times cited : (43)

References (53)
  • 5
    • 0342969865 scopus 로고    scopus 로고
    • Design-Build Institute of America, Washington, DC
    • Design-Build Institute of America (1999), Design-Build Manual of Practice, 2nd ed., Design-Build Institute of America, Washington, DC.
    • (1999) Design-build Manual of Practice, 2nd Ed.
  • 6
    • 0036143916 scopus 로고    scopus 로고
    • Developing tendering strategy in two-envelope fee tendering based on technical score-fee variability
    • Drew, D.S., Tang, L.Y. and Lo, H.P. (2002a), "Developing tendering strategy in two-envelope fee tendering based on technical score-fee variability", Construction Management and Economics, Vol. 20 No. 1, pp. 67-81.
    • (2002) Construction Management and Economics , vol.20 , Issue.1 , pp. 67-81
    • Drew, D.S.1    Tang, L.Y.2    Lo, H.P.3
  • 7
    • 0036499486 scopus 로고    scopus 로고
    • Correcting the fee-technical score variability imbalance in two-envelope fee tendering
    • Drew, D.S., Lai, P.Y., Li, H. and Lo, H.P. (2002b), "Correcting the fee-technical score variability imbalance in two-envelope fee tendering", Construction Management and Economics, Vol. 20 No. 2, pp. 157-66.
    • (2002) Construction Management and Economics , vol.20 , Issue.2 , pp. 157-166
    • Drew, D.S.1    Lai, P.Y.2    Li, H.3    Lo, H.P.4
  • 8
    • 3242682780 scopus 로고    scopus 로고
    • Finance Bureau, Government Secretariat, Government of Hong Kong Special Administrative Region, Hong Kong
    • Finance Bureau (1997), A Guide to Procurement, Finance Bureau, Government Secretariat, Government of Hong Kong Special Administrative Region, Hong Kong.
    • (1997) A Guide to Procurement
  • 9
    • 0342651716 scopus 로고    scopus 로고
    • Topic No. 625-020-010-a, Office of Environment Management, FDOT, Tallahassee, FL
    • Florida Department of Transportation (FDOT) (1996), Design-Build Procurement and Administration, Topic No. 625-020-010-a, Office of Environment Management, FDOT, Tallahassee, FL
    • (1996) Design-build Procurement and Administration
  • 10
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytical hierarchy process
    • Fong, P.S. and Choi, S.K. (2000), "Final contractor selection using the analytical hierarchy process", Construction Management and Economics, Vol. 18 No. 5, pp. 547-57.
    • (2000) Construction Management and Economics , vol.18 , Issue.5 , pp. 547-557
    • Fong, P.S.1    Choi, S.K.2
  • 12
    • 0030686122 scopus 로고    scopus 로고
    • Evaluating best value contract proposals
    • C&C.04.1 to C&C.04.5, AACE International, Dallas, TX
    • Gransberg, D.D. (1997), "Evaluating best value contract proposals", 1997 AACE Transactions, C&C.04.1 to C&C.04.5, AACE International, Dallas, TX.
    • (1997) 1997 AACE Transactions
    • Gransberg, D.D.1
  • 13
    • 0029708514 scopus 로고    scopus 로고
    • Best value contracting: Breaking the low-bid paradigm
    • VE&C.5.1-VE&C.5.4, AACE International, Vancouver
    • Gransberg, D.D. and Ellicott, M.A. (1996), "Best value contracting: breaking the low-bid paradigm", 1996 AACE Transactions, VE&C.5.1-VE&C.5.4, AACE International, Vancouver.
    • (1996) 1996 AACE Transactions
    • Gransberg, D.D.1    Ellicott, M.A.2
  • 14
    • 0010137271 scopus 로고    scopus 로고
    • Best value contracting criteria
    • Gransberg, D.D. and Ellicott, M.A. (1997), "Best value contracting criteria", Cost Engineering, Vol. 39 No. 6, pp. 31-4.
    • (1997) Cost Engineering , vol.39 , Issue.6 , pp. 31-34
    • Gransberg, D.D.1    Ellicott, M.A.2
  • 17
    • 0000771440 scopus 로고    scopus 로고
    • Assessment and evaluation of contractor data against client goals using PERT approach
    • Hatush, Z. and Skitmore, M (1997), "Assessment and evaluation of contractor data against client goals using PERT approach", Construction Management and Economics, Vol. 15 No. 4, pp. 327-40.
    • (1997) Construction Management and Economics , vol.15 , Issue.4 , pp. 327-340
    • Hatush, Z.1    Skitmore, M.2
  • 18
    • 0032023054 scopus 로고    scopus 로고
    • Contractor selection using multicriteria utility theory: An additive mode
    • Hatush, Z. and Skitmore, M. (1998), "Contractor selection using multicriteria utility theory: an additive mode", Building and Environment, Vol. 33 No. 2/3, pp. 105-15.
    • (1998) Building and Environment , vol.33 , Issue.2-3 , pp. 105-115
    • Hatush, Z.1    Skitmore, M.2
  • 19
    • 0032098746 scopus 로고    scopus 로고
    • Which contractor selection methodology?
    • Holt, G.D. (1998), "Which contractor selection methodology?". International Journal of Project Management, Vol. 16 No. 3, pp. 153-64.
    • (1998) International Journal of Project Management , vol.16 , Issue.3 , pp. 153-164
    • Holt, G.D.1
  • 22
    • 0347877894 scopus 로고    scopus 로고
    • A just-in-time evaluation strategy for international procurement
    • Humphreys, P., Mak. P.I. and Yeung, C.M. (1998), "A just-in-time evaluation strategy for international procurement". Journal of Supply Chain Management, Vol. 3 No. 4, pp. 175-86.
    • (1998) Journal of Supply Chain Management , vol.3 , Issue.4 , pp. 175-186
    • Humphreys, P.1    Mak, P.I.2    Yeung, C.M.3
  • 23
    • 3242709803 scopus 로고    scopus 로고
    • Construction project briefing/architectural programming
    • Kelly, J., Morledge, R., and Wilkinson, S. (Eds), published in conjunction with RICS Foundation, Blackwell Publishing, Oxford
    • Kelly, J. and Duerk, D. (2002), "Construction project briefing/architectural programming", in Kelly, J., Morledge, R., and Wilkinson, S. (Eds), Best Value in Construction, published in conjunction with RICS Foundation, Blackwell Publishing, Oxford.
    • (2002) Best Value in Construction
    • Kelly, J.1    Duerk, D.2
  • 25
    • 0036680985 scopus 로고    scopus 로고
    • Selecting the appropriate project delivery method using the AHP
    • Khalil, M.I. (2002), "Selecting the appropriate project delivery method using the AHP", International Journal of Project Management, Vol. 20 No. 6, pp. 469-74.
    • (2002) International Journal of Project Management , vol.20 , Issue.6 , pp. 469-474
    • Khalil, M.I.1
  • 26
    • 0030147931 scopus 로고    scopus 로고
    • Contractor evaluation and selection - A Hong Kong perspective
    • Kumaraswamy, M.M. (1996), "Contractor evaluation and selection - a Hong Kong perspective", Building and Environment Journal, Vol. 31 No. 3, pp. 273-82.
    • (1996) Building and Environment Journal , vol.31 , Issue.3 , pp. 273-282
    • Kumaraswamy, M.M.1
  • 27
    • 0034744971 scopus 로고    scopus 로고
    • Developing a decision support system for building project procurement
    • Kumaraswamy, M.M. and Dissanayaka, S.M. (2001), "Developing a decision support system for building project procurement", Building and Environment Journal, Vol. 36 No. 3, pp. 337-49.
    • (2001) Building and Environment Journal , vol.36 , Issue.3 , pp. 337-349
    • Kumaraswamy, M.M.1    Dissanayaka, S.M.2
  • 29
    • 0035482649 scopus 로고    scopus 로고
    • Web-based decision support systems: A case study in project delivery
    • Molenaar, K.R. and Songer, A.D. (2001), "Web-based decision support systems: a case study in project delivery", Journal of Computing in Civil Engineering, Vol. 15 No. 4, pp. 259-67.
    • (2001) Journal of Computing in Civil Engineering , vol.15 , Issue.4 , pp. 259-267
    • Molenaar, K.R.1    Songer, A.D.2
  • 30
    • 0006591191 scopus 로고    scopus 로고
    • Progress Report No. 5 under Special Experimental Project (September 14), Division of Capital Program Management, NJDOT, NJ
    • New Jersey Department of Transportation (NJDOT) (1999), New Jersey's Modified Design/Build Program Progress Report, Progress Report No. 5 under Special Experimental Project (September 14), Division of Capital Program Management, NJDOT, NJ.
    • (1999) New Jersey's Modified Design/Build Program Progress Report
  • 33
    • 0001886332 scopus 로고
    • Using the analytic hierarchy process to structure the supplier selection procedure
    • Spring
    • Nydick, R.L. and Hill, R.P. (1992), "Using the analytic hierarchy process to structure the supplier selection procedure", Journal of Purchasing and Materials Management, Spring, pp. 31-6.
    • (1992) Journal of Purchasing and Materials Management , pp. 31-36
    • Nydick, R.L.1    Hill, R.P.2
  • 39
    • 3242657522 scopus 로고    scopus 로고
    • Knowledge mining of information sources for research in construction management
    • ASCE
    • Palaneeswaran, E. and Kumaraswamy, M.M. (2003), "Knowledge mining of information sources for research in construction management", Construction Engineering and Management, Vol. 129 No. 2, ASCE, pp. 182-91.
    • (2003) Construction Engineering and Management , vol.129 , Issue.2 , pp. 182-191
    • Palaneeswaran, E.1    Kumaraswamy, M.M.2
  • 40
    • 0035212291 scopus 로고    scopus 로고
    • Recent advances and proposed improvements in contractor prequalification methodologies
    • Palaneeswaran, E. and Kumaraswamy, M.M. (2001), "Recent advances and proposed improvements in contractor prequalification methodologies", Building and Environment Journal, Vol. 36, pp. 73-87.
    • (2001) Building and Environment Journal , vol.36 , pp. 73-87
    • Palaneeswaran, E.1    Kumaraswamy, M.M.2
  • 42
    • 0037399418 scopus 로고    scopus 로고
    • Curing congenital construction industry concerns through relationally integrated supply chains
    • Palaneeswaran, E., Kumaraswamy, M.M., Rahman, M.M. and Ng, T.S.T. (2003), "Curing congenital construction industry concerns through relationally integrated supply chains", Building and Environment Journal, Vol. 38 No. 4, pp. 571-82.
    • (2003) Building and Environment Journal , vol.38 , Issue.4 , pp. 571-582
    • Palaneeswaran, E.1    Kumaraswamy, M.M.2    Rahman, M.M.3    Ng, T.S.T.4
  • 44
    • 0042951149 scopus 로고
    • Decision models for analysis and evaluation of construction contractors
    • Russell, J.S. (1992), "Decision models for analysis and evaluation of construction contractors", Construction Management and Economics, Vol. 10, pp. 185-202.
    • (1992) Construction Management and Economics , vol.10 , pp. 185-202
    • Russell, J.S.1
  • 45
    • 0032083413 scopus 로고    scopus 로고
    • Optimization for bidder profitability and contractor selection
    • Singh, A. (1998), "Optimization for bidder profitability and contractor selection", Cost Engineering, Vol. 40 No. 6, pp. 31-41.
    • (1998) Cost Engineering , vol.40 , Issue.6 , pp. 31-41
    • Singh, A.1
  • 46
    • 67651079207 scopus 로고
    • Which procurement system? Towards a universal procurement selection technique
    • Skitmore, R.M. and Marsden, D.E. (1988), "Which procurement system? Towards a universal procurement selection technique", Construction Management and Economics, Vol. 6 No. 1, pp. 71-89.
    • (1988) Construction Management and Economics , vol.6 , Issue.1 , pp. 71-89
    • Skitmore, R.M.1    Marsden, D.E.2
  • 48
    • 3242695479 scopus 로고    scopus 로고
    • Contracting for best value - A best practice guide to source selection
    • United States Army Material Command, Alexandria, VA
    • United States Army Material Command (1998), "Contracting for best value - a best practice guide to source selection", AMC Pamphlet 715-3, United States Army Material Command, Alexandria, VA.
    • (1998) AMC Pamphlet 715-3
  • 50
    • 3242707138 scopus 로고    scopus 로고
    • Prequalification: It's time to rethink our evaluation standards
    • Design-Build Institute of America, Washington, DC
    • Warne, T.R. (2002), "Prequalification: it's time to rethink our evaluation standards", Design-Build DATELINE, Design-Build Institute of America, Washington, DC, Vol. 9 No. 8, p. 10.
    • (2002) Design-build DATELINE , vol.9 , Issue.8 , pp. 10
    • Warne, T.R.1
  • 51
    • 0344031908 scopus 로고    scopus 로고
    • Lowest price or value? investigation of UK construction clients' tender selection process
    • Wong, C.H., Holt, G.D. and Cooper, A.C. (2000), "Lowest price or value? investigation of UK construction clients' tender selection process", Construction Management and Economics, Vol. 18, pp. 767-74.
    • (2000) Construction Management and Economics , vol.18 , pp. 767-774
    • Wong, C.H.1    Holt, G.D.2    Cooper, A.C.3
  • 52
    • 84993033383 scopus 로고    scopus 로고
    • Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences
    • Wong, C.H., Holt, G.D. and Harris, P. (2001), "Multi-criteria selection or lowest price? Investigation of UK construction clients' tender evaluation preferences", Engineering, Construction and Architectural Management, Vol. 8 No. 4, pp. 257-71.
    • (2001) Engineering, Construction and Architectural Management , vol.8 , Issue.4 , pp. 257-271
    • Wong, C.H.1    Holt, G.D.2    Harris, P.3
  • 53
    • 0008159226 scopus 로고    scopus 로고
    • Low bidders needn't apply
    • Wright, G. (1998), "Low bidders needn't apply", Building Design & Construction, Vol. 39 No. 9, pp. 52-6.
    • (1998) Building Design & Construction , vol.39 , Issue.9 , pp. 52-56
    • Wright, G.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.