메뉴 건너뛰기




Volumn 136, Issue 7, 2010, Pages 768-777

Performance of MBE/DBE/WBE construction firms in transportation projects

Author keywords

Company performance; DBE; MBE; Minority; Transportation projects; WBE

Indexed keywords

BUSINESS ENTERPRISE; COMPANY PERFORMANCE; CONSTRUCTION FIRMS; FIRM SIZE; MANN-WHITNEY; PERFORMANCE ASSESSMENT MODELS; PERFORMANCE MEASUREMENTS; TRANSPORTATION PROJECTS;

EID: 77953577270     PISSN: 07339364     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CO.1943-7862.0000182     Document Type: Article
Times cited : (12)

References (63)
  • 1
    • 84992974751 scopus 로고    scopus 로고
    • Business failures in the construction industry
    • Arditi, D., Koksal, A., and Kale, S. (2000). " Business failures in the construction industry.." Eng., Constr., Archit., Manage., 7 (2), 120-132.
    • (2000) Eng., Constr., Archit., Manage. , vol.7 , Issue.2 , pp. 120-132
    • Arditi, D.1    Koksal, A.2    Kale, S.3
  • 2
    • 0002478241 scopus 로고
    • Design of performance measures for time-based companies
    • " IOPMDU 0144-3577, (),. 10.1108/01443579110143412
    • Azzone, G., Masella, C., and Bertele, U. (1991). " Design of performance measures for time-based companies.." Int. J. Operat. Product. Manage. IOPMDU 0144-3577, 11 (3), 77-85. 10.1108/01443579110143412
    • (1991) Int. J. Operat. Product. Manage. , vol.11 , Issue.3 , pp. 77-85
    • Azzone, G.1    Masella, C.2    Bertele, U.3
  • 3
    • 14744304229 scopus 로고    scopus 로고
    • Performance measurement in construction
    • DOI 10.1061/(ASCE)0742-597X(2004)20:2(42)
    • Bassioni, H. A., Price, A. D. F., and Hassan, T. M. (2004). " Performance measurement in construction.." J. Manage. Eng. JMENEA 0742-597X, 20 (2), 42-50. 10.1061/(ASCE)0742-597X(2004)20:2(42) (Pubitemid 40329300)
    • (2004) Journal of Management in Engineering , vol.20 , Issue.2 , pp. 42-50
    • Bassioni, H.A.1    Price, A.D.F.2    Hassan, T.M.3
  • 4
    • 22144446074 scopus 로고    scopus 로고
    • Building a conceptual framework for measuring business performance in construction: An empirical evaluation
    • DOI 10.1080/0144619042000301401
    • Bassioni, H. A., Price, A. D. F., and Hassan, T. M. (2005). " Building a conceptual framework for measuring business performance in construction: an empirical evaluation.." Constr. Manage. Econom. CMECF3 0144-6193, 23, 495-507. 10.1080/0144619042000301401 (Pubitemid 40974447)
    • (2005) Construction Management and Economics , vol.23 , Issue.5 , pp. 495-507
    • Bassioni, H.A.1    Price, A.D.F.2    Hassan, T.M.3
  • 5
    • 34248656208 scopus 로고    scopus 로고
    • Discrimination in the Chicago-area construction industry handicaps minority-owned firms
    • 10.1007/BF02915420 0034-6446
    • Bates, T. (2006). " Discrimination in the Chicago-area construction industry handicaps minority-owned firms.." Rev. Black Polit. Econ., 33 (4), 7-26. 10.1007/BF02915420 0034-6446
    • (2006) Rev. Black Polit. Econ. , vol.33 , Issue.4 , pp. 7-26
    • Bates, T.1
  • 7
    • 0026128930 scopus 로고
    • DBE programs
    • " JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1991)117:1(176)
    • Beliveau, Y., Snyder, D., and Voster, M. (1991). " DBE programs.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 117 (1), 176-192. 10.1061/(ASCE)0733-9364(1991)117:1(176)
    • (1991) J. Constr. Eng. Manage. , vol.117 , Issue.1 , pp. 176-192
    • Beliveau, Y.1    Snyder, D.2    Voster, M.3
  • 9
    • 0242426659 scopus 로고    scopus 로고
    • Discrimination in the small-business credit market
    • DOI 10.1162/003465303772815835
    • Blanchflower, D. G., Levine, P. B., and Zimmerman, D. J. (2003). " Discrimination in the small-business credit market.." Rev. Econ. Stat. ZZZZZZ 0034-6535, 85 (4), 930-943. 10.1162/003465303772815835 (Pubitemid 37417027)
    • (2003) Review of Economics and Statistics , vol.85 , Issue.4 , pp. 930-943
    • Blanchflower, D.G.1    Levine, P.B.2    Zimmerman, D.J.3
  • 11
    • 77956757216 scopus 로고
    • Increasing minority participation in the construction industry in Florida, Phase II
    • School of Building Construction, Univ. of Florida, Gainesville, Fla.
    • Chang, L. -M. (1986). " Increasing minority participation in the construction industry in Florida, Phase II.." Tech. Publ. No. 41, School of Building Construction, Univ. of Florida, Gainesville, Fla.
    • (1986) Tech. Publ. No. 41
    • Chang, L.-M.1
  • 12
    • 77953581431 scopus 로고
    • Suggestions for increasing DBE contractors' participation
    • JPIEDN 0733-9380, (),. 10.1061/(ASCE)1052-3928(1987)113:4(371)
    • Chang, L. -M. (1987). " Suggestions for increasing DBE contractors' participation.." J. Profl. Issues in Engrg. JPIEDN 0733-9380, 113 (4), 371-388. 10.1061/(ASCE)1052-3928(1987)113:4(371)
    • (1987) J. Profl. Issues in Engrg. , vol.113 , Issue.4 , pp. 371-388
    • Chang, L.-M.1
  • 13
    • 14744304180 scopus 로고    scopus 로고
    • ISO 9000 and the U.S. construction industry
    • DOI 10.1061/(ASCE)0742-597X(2003)19:2(69)
    • Chini, A. R., and Valdez, H. E. (2003). " ISO 9000 and the U.S. construction industry.." J. Manage. Eng. JMENEA 0742-597X, 19 (2), 69-77. 10.1061/(ASCE)0742-597X(2003)19:2(69) (Pubitemid 40329327)
    • (2003) Journal of Management in Engineering , vol.19 , Issue.2 , pp. 69-77
    • Chini, A.R.1    Valdez, H.E.2
  • 14
    • 33845722537 scopus 로고    scopus 로고
    • Construction Best Practice Program (CBPP).. "." 〈〉 (February 1, 2008)
    • Construction Best Practice Program (CBPP). (2002). " Key performance indicators (CBPP-KPI).." 〈 http://www.cbpp.org.uk/cbpplthemes/bm/ KPIs/ 〉 (February 1, 2008).
    • (2002) Key Performance Indicators (CBPP-KPI)
  • 15
    • 13944268320 scopus 로고    scopus 로고
    • Management's perception of key performance indicators for construction
    • DOI 10.1061/(ASCE)0733-9364(2003)129:2(142)
    • Cox, R. F., Issa, R. R. A., and Ahrens, D. (2003). " Management's perception of key performance indicators for construction.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 129 (2), 142-152. 10.1061/(ASCE)0733-9364(2003) 129:2(142) (Pubitemid 40265482)
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.2 , pp. 142-151
    • Cox, R.F.1    Issa, R.R.A.2    Ahrens, D.3
  • 16
    • 0012038947 scopus 로고
    • The SMART' way to define and sustain success
    • ZZZZZZ 0277-8556, (),. 10.1002/npr.4040080105
    • Cross, K. F., and Lynch, R. L. (1988). " The SMART' way to define and sustain success.." Natl. Prod. Rev. ZZZZZZ 0277-8556, 8 (1), 23-33. 10.1002/npr.4040080105
    • (1988) Natl. Prod. Rev. , vol.8 , Issue.1 , pp. 23-33
    • Cross, K.F.1    Lynch, R.L.2
  • 17
    • 33947375983 scopus 로고    scopus 로고
    • The impact of customer-related IT investments on customer satisfaction and shareholder returns
    • Dardan, S., Kumar, R., and Stylianou, A. (2006). " The impact of customer-related IT investments on customer satisfaction and shareholder returns.." Journal of Computer Information Systems, 47, 100-111.
    • (2006) Journal of Computer Information Systems , vol.47 , pp. 100-111
    • Dardan, S.1    Kumar, R.2    Stylianou, A.3
  • 18
    • 0010612318 scopus 로고
    • Management theory and total quality: Improving research and practice through theory development
    • ZZZZZZ 0363-7425, (),. 10.2307/258933
    • Dean, J. W., and Bowen, D. E. (1994). " Management theory and total quality: improving research and practice through theory development.." Acad. Manage. Rev. ZZZZZZ 0363-7425, 19 (3), 392-418. 10.2307/258933
    • (1994) Acad. Manage. Rev. , vol.19 , Issue.3 , pp. 392-418
    • Dean, J.W.1    Bowen, D.E.2
  • 19
    • 9144261866 scopus 로고    scopus 로고
    • Department of the Environment, Transport, and the Regions (DETR). The KPI Working Group, London
    • Department of the Environment, Transport, and the Regions (DETR). (2000). KPI Rep. for The Minister of Construction, The KPI Working Group, London.
    • (2000) KPI Re for the Minister of Construction
  • 21
    • 0028466483 scopus 로고
    • Improving effectiveness of equal business opportunity programs
    • JPEPE3 1052-3928, (),. 10.1061/(ASCE)1052-3928(1994)120:3(295)
    • El-Itr, Z. M., and Kangari, R. (1994a). " Improving effectiveness of equal business opportunity programs.." J. Profl. Issues Eng. Educ. Pract. JPEPE3 1052-3928, 120 (3), 295-312. 10.1061/(ASCE)1052-3928(1994)120:3(295)
    • (1994) J. Profl. Issues Eng. Educ. Pract. , vol.120 , Issue.3 , pp. 295-312
    • El-Itr, Z.M.1    Kangari, R.2
  • 22
    • 0028498229 scopus 로고
    • Minority contractors: Framework for new policy development
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1994)120:3(632)
    • El-Itr, Z. M., and Kangari, R. (1994b). " Minority contractors: Framework for new policy development.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 120 (3), 632-648. 10.1061/(ASCE)0733-9364(1994)120:3(632)
    • (1994) J. Constr. Eng. Manage. , vol.120 , Issue.3 , pp. 632-648
    • El-Itr, Z.M.1    Kangari, R.2
  • 23
    • 0004003238 scopus 로고    scopus 로고
    • European Foundation for Quality Management (EFQM).., EFQM, Brussels.
    • European Foundation for Quality Management (EFQM). (1999). The EFQM Excellence Model (Blue Book), EFQM, Brussels.
    • (1999) The EFQM Excellence Model (Blue Book)
  • 24
    • 84989095992 scopus 로고
    • Output flexibility-A competitive advantage for small firms
    • SMADJ8 0143-2095,. 10.1002/smj.4250120203
    • Fiegenbaum, A., and Karnani, A. (1991). " Output flexibility-A competitive advantage for small firms.." Strategic Manage. J. SMADJ8 0143-2095, 12, 101-114. 10.1002/smj.4250120203
    • (1991) Strategic Manage. J. , vol.12 , pp. 101-114
    • Fiegenbaum, A.1    Karnani, A.2
  • 25
    • 0029203834 scopus 로고
    • Benchmarking in construction industry
    • " JMENEA 0742-597X, (),. 10.1061/(ASCE)0742-597X(1995)11:1(50)
    • Fisher, D., Miertschin, S., and Pllock, D. (1995). " Benchmarking in construction industry.." J. Manage. Eng. JMENEA 0742-597X, 11 (1), 50-57. 10.1061/(ASCE)0742-597X(1995)11:1(50)
    • (1995) J. Manage. Eng. , vol.11 , Issue.1 , pp. 50-57
    • Fisher, D.1    Miertschin, S.2    Pllock, D.3
  • 27
    • 79959613884 scopus 로고
    • The liability of newness: Age dependence in organizational death rates
    • " ZZZZZZ 0003-1224,. 10.2307/2094928
    • Freeman, J., Carroll, G. R., and Hannan, M. T. (1983). " The liability of newness: Age dependence in organizational death rates.." Am. Sociol. Rev. ZZZZZZ 0003-1224, 48, 692-710. 10.2307/2094928
    • (1983) Am. Sociol. Rev. , vol.48 , pp. 692-710
    • Freeman, J.1    Carroll, G.R.2    Hannan, M.T.3
  • 28
    • 0031076668 scopus 로고    scopus 로고
    • An integrated dynamic performance measurement system for improving manufacturing competitiveness
    • " IJPEE6 0925-5273,. 10.1016/S0925-5273(96)00093-X
    • Ghalayini, A. M., Nobel, J. S., and Crowe, T. J. (1997). " An integrated dynamic performance measurement system for improving manufacturing competitiveness.." Int. J. Prod. Econ. IJPEE6 0925-5273, 48, 207-225. 10.1016/S0925-5273(96)00093-X
    • (1997) Int. J. Prod. Econ. , vol.48 , pp. 207-225
    • Ghalayini, A.M.1    Nobel, J.S.2    Crowe, T.J.3
  • 30
    • 33744978319 scopus 로고    scopus 로고
    • An empirical study of relationship between IT investment and firm performance: A resource-based perspective
    • DOI 10.1016/j.ejor.2005.06.013, PII S0377221705004728
    • Huang, S. M., Ou, C. S., Chen, C. M., and Lin, B. (2006). " An empirical study of relationship between IT investment and firm performance: A resource-based perspective.." Eur. J. Oper. Res. EJORDT 0377-2217, 173 (3), 984-999. 10.1016/j.ejor.2005.06.013 (Pubitemid 43866311)
    • (2006) European Journal of Operational Research , vol.173 , Issue.3 , pp. 984-999
    • Huang, S.-M.1    Ou, C.-S.2    Chen, C.-M.3    Lin, B.4
  • 31
    • 0029747849 scopus 로고    scopus 로고
    • Strategies for achieving excellence in construction safety performance
    • " JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1996)122:1(61)
    • Jaselskis, E. J., Anderson, S. D., and Russell, J. S. (1996). " Strategies for achieving excellence in construction safety performance.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 122 (1), 61-70. 10.1061/(ASCE)0733- 9364(1996)122:1(61)
    • (1996) J. Constr. Eng. Manage. , vol.122 , Issue.1 , pp. 61-70
    • Jaselskis, E.J.1    Anderson, S.D.2    Russell, J.S.3
  • 32
    • 77953563848 scopus 로고    scopus 로고
    • Does minority business enterprise status make sense for a construction bid?
    • Jenkins, W. A. (2007). " Does minority business enterprise status make sense for a construction bid? " Real Estate Finance, 24 (1), 17-19.
    • (2007) Real Estate Finance , vol.24 , Issue.1 , pp. 17-19
    • Jenkins, W.A.1
  • 33
    • 0037876286 scopus 로고    scopus 로고
    • Performance management in construction: A conceptual framework
    • " CMECF3 0144-6193, (),. 10.1080/01446190010003425
    • Kagioglou, M., Cooper, R., and Aouad, G. (2001). " Performance management in construction: A conceptual framework.." Constr. Manage. Econom. CMECF3 0144-6193, 19 (2), 85-95. 10.1080/01446190010003425
    • (2001) Constr. Manage. Econom. , vol.19 , Issue.2 , pp. 85-95
    • Kagioglou, M.1    Cooper, R.2    Aouad, G.3
  • 34
    • 0032206692 scopus 로고    scopus 로고
    • Business failures: Liabilities of newness, adolescence, and smallness
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1998)124:6(458)
    • Kale, S., and Arditi, D. (1998). " Business failures: Liabilities of newness, adolescence, and smallness.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 124 (6), 458-464. 10.1061/(ASCE)0733-9364(1998)124:6(458)
    • (1998) J. Constr. Eng. Manage. , vol.124 , Issue.6 , pp. 458-464
    • Kale, S.1    Arditi, D.2
  • 35
    • 0026494564 scopus 로고
    • The balanced scorecard-Measures that drive performance
    • HABRAX 0017-8012
    • Kaplan, R. S., and Norton, D. P. (1992). " The balanced scorecard-Measures that drive performance.." Harvard Bus. Rev. HABRAX 0017-8012, 70 (1), 71-79.
    • (1992) Harvard Bus. Rev. , vol.70 , Issue.1 , pp. 71-79
    • Kaplan, R.S.1    Norton, D.P.2
  • 36
    • 0002352706 scopus 로고
    • Are your performance measure obsolete?
    • Keegan, D. P., Eiler, R. G., and Jones, C. R. (1989). " Are your performance measure obsolete? " Management Accounting, 70 (2), 45-50.
    • (1989) Management Accounting , vol.70 , Issue.2 , pp. 45-50
    • Keegan, D.P.1    Eiler, R.G.2    Jones, C.R.3
  • 38
    • 0021439295 scopus 로고
    • Cost and benefit of MBE rules in construction
    • JCEMD4 0733-9364, (),. 10.1061/(ASCE)0733-9364(1984)110:2(235)
    • Koehn, E., and Espaillat, C. (1984). " Cost and benefit of MBE rules in construction.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 110 (2), 235-247. 10.1061/(ASCE)0733-9364(1984)110:2(235)
    • (1984) J. Constr. Eng. Manage. , vol.110 , Issue.2 , pp. 235-247
    • Koehn, E.1    Espaillat, C.2
  • 40
    • 3843068774 scopus 로고    scopus 로고
    • The development and implementation of an integrated performance measurement framework
    • A. D. Neely and D. B. Waggoner, eds. Cambridge University Press, Cambridge, U.K
    • Medori, D. (1998). " The development and implementation of an integrated performance measurement framework.." Performance measurement-Theory and practice, A. D. Neely, and, D. B. Waggoner, eds., Vol. 2, Cambridge University Press, Cambridge, U.K.
    • (1998) Performance Measurement-Theory and Practice , vol.2
    • Medori, D.1
  • 41
    • 33751231403 scopus 로고    scopus 로고
    • Meta-analysis of the relationship between quality management practices and firm performance-implications for quality management theory development
    • ZZZZZZ 0272-6963, (),. 10.1016/j.jom.2005.11.005
    • Nair, A. (2005). " Meta-analysis of the relationship between quality management practices and firm performance-implications for quality management theory development.." J. Operations Manage. ZZZZZZ 0272-6963, 24 (2006), 948-975. 10.1016/j.jom.2005.11.005
    • (2005) J. Operations Manage. , vol.24 , Issue.2006 , pp. 948-975
    • Nair, A.1
  • 42
    • 14744305927 scopus 로고    scopus 로고
    • NIST.. "." Gaithersburg, MD 〈〉 (February 4, 2008) NIST. (2002). " Baldrige national quality program.." Gaithersburg, MD 〈 http://www.quality.nist.gov/ 〉 (February 4, 2008).
    • (2002) Baldrige National Quality Program
  • 43
    • 3843119890 scopus 로고    scopus 로고
    • An integrated model for infrastructural implementation of performance measurement
    • A. D. Neely and D. B. Waggoner, eds.,Cambridge University Press, Cambridge, U.K
    • Oliver, L., and Palmer, E. (1998). " An integrated model for infrastructural implementation of performance measurement.." Performance measurement-Theory and practice, A. D. Neely, and, D. B. Waggoner, eds., Vol. 2, Cambridge University Press, Cambridge, U.K.
    • (1998) Performance Measurement-Theory and Practice , vol.2
    • Oliver, L.1    Palmer, E.2
  • 44
    • 33747776443 scopus 로고    scopus 로고
    • Performance measurement systems: Successes, failures and future - A review
    • DOI 10.1108/13683040610685748
    • Paranjape, B., Rossiter, M., and Pantano, V. (2006). " Insights from the balanced scorecard performance measurement systems: Successes, failures and future-A review.." Measuring Business Excellence, 10 (3), 4-14. 10.1108/13683040610685748 (Pubitemid 44275822)
    • (2006) Measuring Business Excellence , vol.10 , Issue.3 , pp. 4-14
    • Paranjape, B.1    Rossiter, M.2    Pantano, V.3
  • 45
    • 33645128272 scopus 로고    scopus 로고
    • Predicting construction firm performance: An empirical assessment of the differential impact between industry and firm-specific factors
    • CMECF3 0144-6193, (),. 10.1080/01446190500435127
    • Phua, F. T. T. (2006). " Predicting construction firm performance: an empirical assessment of the differential impact between industry and firm-specific factors.." Constr. Manage. Econom. CMECF3 0144-6193, 24 (3), 309-320. 10.1080/01446190500435127
    • (2006) Constr. Manage. Econom. , vol.24 , Issue.3 , pp. 309-320
    • Phua, F.T.T.1
  • 46
    • 21744460265 scopus 로고    scopus 로고
    • A construction company's approach to business performance measurement
    • TQMAED 0954-4127, (),. 10.1080/09544129710161
    • Robertson, H. W. (1997). " A construction company's approach to business performance measurement.." Total Qual. Manage. TQMAED 0954-4127, 8 (2/3), 254-255. 10.1080/09544129710161
    • (1997) Total Qual. Manage. , vol.8 , Issue.2-3 , pp. 254-255
    • Robertson, H.W.1
  • 47
    • 84992974229 scopus 로고    scopus 로고
    • Review and implementation of performance management models in construction engineering organizations
    • Robinson, H. S., Carrillo, P. M., Anumba, C. J., and Al-Ghassani, A. M. (2004). " Review and implementation of performance management models in construction engineering organizations.." Constr. Innov., 5, 203-217.
    • (2004) Constr. Innov. , vol.5 , pp. 203-217
    • Robinson, H.S.1    Carrillo, P.M.2    Anumba, C.J.3    Al-Ghassani, A.M.4
  • 48
    • 77953576676 scopus 로고    scopus 로고
    • Running the show. Surveys: A corporate leadership
    • Oct. 23
    • " Running the show. Surveys: A corporate leadership.." (2003). The Economist, Oct. 23.
    • (2003) The Economist
  • 50
    • 46349108008 scopus 로고    scopus 로고
    • Performance and size: Empirical evidence from Portuguese SMEs
    • SBECEX 0921-898X,. 10.1007/s11187-007-9092-8
    • Serrasqueiro, Z. S., and Nunes, P. M. (2008). " Performance and size: empirical evidence from Portuguese SMEs.." Small Bus. Econ. SBECEX 0921-898X, 31, 195-217. 10.1007/s11187-007-9092-8
    • (2008) Small Bus. Econ. , vol.31 , pp. 195-217
    • Serrasqueiro, Z.S.1    Nunes, P.M.2
  • 51
    • 0012074533 scopus 로고
    • Effective process management through performance measurement. Part III: An integrated model of total quality-based performance management
    • 10.1108/14637159510103220
    • Sinclair, D., and Zairi, M. (1995). " Effective process management through performance measurement. Part III: An integrated model of total quality-based performance management.." Business Process Re-engineering and Management Journal, 1 (3), 50-65. 10.1108/14637159510103220
    • (1995) Business Process Re-engineering and Management Journal , vol.1 , Issue.3 , pp. 50-65
    • Sinclair, D.1    Zairi, M.2
  • 52
    • 0001915770 scopus 로고
    • Social structure and organizations
    • J. G. March, ed., Rand McNally, Chicago
    • Stinchcombe, A. L. (1965). " Social structure and organizations.." Handbook of Organizations, J. G. March, ed., Rand McNally, Chicago.
    • (1965) Handbook of Organizations
    • Stinchcombe, A.L.1
  • 53
    • 0036272950 scopus 로고    scopus 로고
    • A comparative study of 16 national quality awards
    • DOI 10.1108/09544780210425874
    • Tan, K. C. (2002). " A comparative study of 16 national quality awards.." TQM Mag., 14 (3), 165-171. 10.1108/09544780210425874 0954-478X (Pubitemid 34605945)
    • (2002) TQM Magazine , vol.14 , Issue.3 , pp. 165-171
    • Tan, K.C.1
  • 54
    • 77953601676 scopus 로고
    • Establishing the President's committee on equal employment opportunity
    • The White House., Washington, D.C., 〈〉 (February 1, 2008).
    • The White House. (1961). " Establishing the President's committee on equal employment opportunity.." Executive Order 10925, Washington, D.C., 〈 http://www.eeoc.gov/abouteeoc/35th/thelaw/eo-10925.html 〉 (February 1, 2008).
    • (1961) Executive Order 10925
  • 55
    • 77953591624 scopus 로고
    • Equal employment opportunity
    • The White House. Washington, D.C., 〈〉 (February 1, 2008).
    • The White House. (1965). " Equal employment opportunity.." Executive Order 11246, Washington, D.C., 〈 http://www.eeoc.gov/abouteeoc/ 35th/thelaw/eo-11246.html 〉 (February 1, 2008).
    • (1965) Executive Order 11246
  • 56
    • 37349001996 scopus 로고    scopus 로고
    • The effect of information technology investment on firm-level performance in the health care industry
    • ", (),. 0361-6274
    • Thouin, M., Hoffman, J. J., and Ford, E. W. (2008). " The effect of information technology investment on firm-level performance in the health care industry.." Health Care Manage. Rev., 33 (1), 60-68. 0361-6274
    • (2008) Health Care Manage. Rev. , vol.33 , Issue.1 , pp. 60-68
    • Thouin, M.1    Hoffman, J.J.2    Ford, E.W.3
  • 57
    • 77953547433 scopus 로고    scopus 로고
    • Union of Japanese Scientists and Engineers (JUSE).. "." 〈〉 (April 5, 2009)
    • Union of Japanese Scientists and Engineers (JUSE). (2009). " The Deming Prize.." 〈 http://www.juse.or.jp/e/ 〉 (April 5, 2009).
    • (2009) The Deming Prize
  • 58
    • 77953599383 scopus 로고    scopus 로고
    • U.S. Department of Commerce, Economic and Statistics Administration, U.S. Census Bureau.., U.S. Department of Commerce, Economic, and Statistics Administration, U.S. Census Bureau, Washington, D.C
    • U.S. Department of Commerce, Economic and Statistics Administration, U.S. Census Bureau. (2005a). Architectural, engineering, and related services: 2002 economic census professional, scientific, and technical services, industry series, U.S. Department of Commerce, Economic, and Statistics Administration, U.S. Census Bureau, Washington, D.C.
    • (2005) Architectural, Engineering, and Related Services: 2002 Economic Census Professional, Scientific, and Technical Services, Industry Series
  • 59
    • 77953603301 scopus 로고    scopus 로고
    • U.S. Department of Commerce, Economic, and Statistics Administration, U.S. Census Bureau.., U.S. Department of Commerce, Economic, and Statistics Administration, U.S. Census Bureau, Washington, D.C
    • U.S. Department of Commerce, Economic, and Statistics Administration, U.S. Census Bureau. (2005b). Industry general summary: 2002 economic census construction subject series, U.S. Department of Commerce, Economic, and Statistics Administration, U.S. Census Bureau, Washington, D.C.
    • (2005) Industry General Summary: 2002 Economic Census Construction Subject Series
  • 60
    • 84958521526 scopus 로고    scopus 로고
    • U.S. Department of Commerce, Minority Business Development Agency.., U.S. Department of Commerce, Minority Business Development Agency, Washington, D.C.
    • U.S. Department of Commerce, Minority Business Development Agency. (2006). The state of minority business enterprises: An overview of the 2002 survey of business owners, U.S. Department of Commerce, Minority Business Development Agency, Washington, D.C.
    • (2006) The State of Minority Business Enterprises: An Overview of the 2002 Survey of Business Owners
  • 61
    • 0003750767 scopus 로고    scopus 로고
    • U.S. Department of Labor, Bureau of Labor Statistics.(Jan. 15, 2008)
    • U.S. Department of Labor, Bureau of Labor Statistics. (2008). " The current population survey.." 〈 www.bls.gov/cps/home.htm#annual 〉 (Jan. 15, 2008).
    • (2008) The Current Population Survey
  • 62
    • 77953606449 scopus 로고    scopus 로고
    • U.S. DOT.. (Feb. 01, 2008)
    • U.S. DOT. (2008). " Disadvantaged business enterprise.." 〈 http://www.dotcr.ost.dot.gov/asp/dbe.asp 〉 (Feb. 01, 2008).
    • (2008) Disadvantaged Business Enterprise
  • 63
    • 34250667136 scopus 로고    scopus 로고
    • Comparable performance measurement system for construction companies
    • DOI 10.1061/(ASCE)0742-597X(2007)23:3(131)
    • Yu, I., Kim, K., Jung, Y., and Chin, S. (2007). " Comparable performance measurement system for construction companies.." J. Manage. Eng. JMENEA 0742-597X, 23 (3), 131-139. 10.1061/(ASCE)0742-597X(2007)23:3(131) (Pubitemid 46935020)
    • (2007) Journal of Management in Engineering , vol.23 , Issue.3 , pp. 131-139
    • Yu, I.1    Kim, K.2    Jung, Y.3    Chin, S.4


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.