-
1
-
-
70450084715
-
Multi-objective optimization of time-cost-quality using multicolony ant algorithm
-
Afshar, A., A. Kaveh, and O.R. Shoghli, 2007. Multi-objective optimization of time-cost-quality using multicolony ant algorithm. Asian Journal of Civil Engineering (Building And Housing), 8(2): 113-124.
-
(2007)
Asian Journal of Civil Engineering (Building and Housing)
, vol.8
, Issue.2
, pp. 113-124
-
-
Afshar, A.1
Kaveh, A.2
Shoghli, O.R.3
-
2
-
-
0029772743
-
Project management with time, cost, and quality considerations
-
Babu, A.J.G. and N. Suresh, 1996. Project management with time, cost, and quality considerations. European Journal of Operational Research, 88(2): 320-327.
-
(1996)
European Journal of Operational Research
, vol.88
, Issue.2
, pp. 320-327
-
-
Babu, A.J.G.1
Suresh, N.2
-
4
-
-
0029632618
-
The discrete time-cost tradeoff problem revisited
-
De, P., E. James Dunne, J.B. Ghosh, and C.E. Wells, 1995. The discrete time-cost tradeoff problem revisited. European Journal of Operational Research, 81(2): 225-238.
-
(1995)
European Journal of Operational Research
, vol.81
, Issue.2
, pp. 225-238
-
-
De, P.1
James Dunne, E.2
Ghosh, J.B.3
Wells, C.E.4
-
6
-
-
0015484051
-
Critical Path Problems with Concave Cost-Time Curves
-
Falk, J.E. and J.L. Horowitz, 1972. Critical Path Problems with Concave Cost-Time Curves. Management Science, 19(4): 446-455.
-
(1972)
Management Science
, vol.19
, Issue.4
, pp. 446-455
-
-
Falk, J.E.1
Horowitz, J.L.2
-
7
-
-
0000181338
-
A Network Flow Computation for Project Cost Curves
-
Fulkerson, D.R., 1961. A Network Flow Computation for Project Cost Curves. Management Science, 7(2): 167-178.
-
(1961)
Management Science
, vol.7
, Issue.2
, pp. 167-178
-
-
Fulkerson, D.R.1
-
8
-
-
77952622237
-
Finding Pareto Optimal Front for the MultiMode Time, Cost Quality Trade-off in Project Scheduling
-
Iranmanesh, H., M.R. Skandari, and M. Allahverdiloo, 2008. Finding Pareto Optimal Front for the MultiMode Time, Cost Quality Trade-off in Project Scheduling. International Journal of Computer, Information, and Systems Science, and Engineering, 2(2): 118-122.
-
(2008)
International Journal of Computer, Information, and Systems Science, and Engineering
, vol.2
, Issue.2
, pp. 118-122
-
-
Iranmanesh, H.1
Skandari, M.R.2
Allahverdiloo, M.3
-
9
-
-
0015725441
-
An Algorithm for the Project Cost-Duration Analysis with Quadratic and Convex Cost Functions
-
Kapur, K.C., 1973. An Algorithm for the Project Cost-Duration Analysis with Quadratic and Convex Cost Functions, IIE Transactions, 5(4): 314-322.
-
(1973)
IIE Transactions
, vol.5
, Issue.4
, pp. 314-322
-
-
Kapur, K.C.1
-
10
-
-
85044160449
-
Critical-path planning and scheduling
-
Boston, Massachusetts
-
Kelley, J.J.E. and M.R. Walker, 1959. Critical-path planning and scheduling. In Papers presented at the December 1-3, 1959, eastern joint IRE-AIEE-ACM computer conference (pp. 160-173). Boston, Massachusetts.
-
(1959)
Papers Presented At the December 1-3, 1959, Eastern Joint IRE-AIEE-ACM Computer Conference
, pp. 160-173
-
-
Kelley, J.J.E.1
Walker, M.R.2
-
11
-
-
0033177842
-
Time, cost and quality trade-off in project management: A case study
-
Khang, D.B. and Y.M. Myint, 1999. Time, cost and quality trade-off in project management: a case study. International Journal of Project Management, 17(4): 249-256.
-
(1999)
International Journal of Project Management
, vol.17
, Issue.4
, pp. 249-256
-
-
Khang, D.B.1
Myint, Y.M.2
-
12
-
-
76349096961
-
Generation of efficient solutions in Multiobjective Mathematical Programming problems using GAMS
-
Technical report: National Technical University of Athens, Zografou Campus, Athens
-
Mavrotas, G., 2006. Generation of efficient solutions in Multiobjective Mathematical Programming problems using GAMS. Effective implementation of the å-constraint method, Technical report: National Technical University of Athens, Zografou Campus, Athens.
-
(2006)
Effective Implementation of The Å-constraint Method
-
-
Mavrotas, G.1
-
14
-
-
33750585495
-
Incorporating Quality Considerations into Project Time/Cost Tradeoff Analysis and Decision Making
-
Pollack-Johnson, B. and M. Liberatore, 2006. Incorporating Quality Considerations into Project Time/Cost Tradeoff Analysis and Decision Making. Engineering Management, IEEE Transactions on, 53(4): 534-542.
-
(2006)
Engineering Management, IEEE Transactions On
, vol.53
, Issue.4
, pp. 534-542
-
-
Pollack-Johnson, B.1
Liberatore, M.2
-
16
-
-
70449446451
-
Multi Objective Particle Swarm Optimization for a Discrete Time, Cost, and Quality Trade-off Problem
-
Rahimi, M. and H. Iranmanesh, 2008. Multi Objective Particle Swarm Optimization for a Discrete Time, Cost, and Quality Trade-off Problem. World Applied Sciences Journal, 4(2): 270-276.
-
(2008)
World Applied Sciences Journal
, vol.4
, Issue.2
, pp. 270-276
-
-
Rahimi, M.1
Iranmanesh, H.2
-
17
-
-
0021623441
-
Optimal linear approximation in project compression
-
Salem, A.M. and S.E. Elmaghraby, 1984. Optimal linear approximation in project compression. IIE Transactions, 16(4): 339-347.
-
(1984)
IIE Transactions
, vol.16
, Issue.4
, pp. 339-347
-
-
Salem, A.M.1
Elmaghraby, S.E.2
-
18
-
-
33750488440
-
On the discrete time, cost and quality trade-off problem
-
Tareghian, H.R. and S.H. Taheri, 2006. On the discrete time, cost and quality trade-off problem. Applied Mathematics and Computation, 181(2): 1305-1312.
-
(2006)
Applied Mathematics and Computation
, vol.181
, Issue.2
, pp. 1305-1312
-
-
Tareghian, H.R.1
Taheri, S.H.2
-
19
-
-
34250621376
-
A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search
-
Tareghian, H.R. and S.H. Taheri, 2007. A solution procedure for the discrete time, cost and quality tradeoff problem using electromagnetic scatter search. Applied Mathematics and Computation, 190(2): 1136-1145.
-
(2007)
Applied Mathematics and Computation
, vol.190
, Issue.2
, pp. 1136-1145
-
-
Tareghian, H.R.1
Taheri, S.H.2
-
20
-
-
34848917527
-
The discrete time/cost trade-off problem: Extensions and heuristic procedures
-
Vanhoucke, M. and D. Debels, 2007. The discrete time/cost trade-off problem: extensions and heuristic procedures. Journal of Scheduling, 10(4): 311-326.
-
(2007)
Journal of Scheduling
, vol.10
, Issue.4
, pp. 311-326
-
-
Vanhoucke, M.1
Debels, D.2
|