-
1
-
-
0037091919
-
Process planning for product disassembly
-
Das, S.K. and Naik, S., 2002. Process planning for product disassembly. International Journal of Production Research, 40 (6), 1335-1355.
-
(2002)
International Journal of Production Research
, vol.40
, Issue.6
, pp. 1335-1355
-
-
Das, S.K.1
Naik, S.2
-
3
-
-
36248957483
-
Subassembly identification based on grey clustering
-
Gao, J., Xiang, D., and Duan, G., 2008. Subassembly identification based on grey clustering. International Journal of Production Research, 46 (4), 1137-1161.
-
(2008)
International Journal of Production Research
, vol.46
, Issue.4
, pp. 1137-1161
-
-
Gao, J.1
Xiang, D.2
Duan, G.3
-
4
-
-
27944452228
-
A bill of materials-based approach for end-of-life decision making in design for the environment
-
Gonzá lez, B. and Adenso-díaz, B., 2005. A bill of materials-based approach for end-of-life decision making in design for the environment. International Journal of Production Research, 43 (10), 2071-2099.
-
(2005)
International Journal of Production Research
, vol.43
, Issue.10
, pp. 2071-2099
-
-
González, B.1
Adenso-Díaz, B.2
-
6
-
-
32044456224
-
From life cycle assessment to sustainable production: Status and perspectives
-
Hauschild, M., Jeswiet, J., and Alting, L., 2005. From life cycle assessment to sustainable production: status and perspectives. CIRP Annals - Manufacturing Technology, 54 (2), 1-21.
-
(2005)
CIRP Annals - Manufacturing Technology
, vol.54
, Issue.2
, pp. 1-21
-
-
Hauschild, M.1
Jeswiet, J.2
Alting, L.3
-
7
-
-
21144456733
-
Modular and platform for product family design: Literature analysis
-
Jose, A. and Tollenaere, M., 2005. Modular and platform for product family design: literature analysis. Journal of Intelligent Manufacturing, 16, 371-390.
-
(2005)
Journal of Intelligent Manufacturing
, vol.16
, pp. 371-390
-
-
Jose, A.1
Tollenaere, M.2
-
8
-
-
0242269931
-
Solving the assembly configuration problem for modular products using immune algorithm approach
-
Kahoo, L.P. and Situmdrang, T.D., 2003. Solving the assembly configuration problem for modular products using immune algorithm approach. International Journal Production Research, 41 (15), 3419-3434.
-
(2003)
International Journal Production Research
, vol.41
, Issue.15
, pp. 3419-3434
-
-
Kahoo, L.P.1
Situmdrang, T.D.2
-
11
-
-
0032166103
-
Implications of modularity on product design for the life cycle
-
Newcomb, P.J., Bras, B., and Rosen, D.W., 1998. Implications of modularity on product design for the life cycle. Transaction of the ASME, 120, 483-490.
-
(1998)
Transaction of the ASME
, vol.120
, pp. 483-490
-
-
Newcomb, P.J.1
Bras, B.2
Rosen, D.W.3
-
12
-
-
0032633128
-
Automatic subassembly detection from a product model for disassembly sequence generation
-
Ong, N.S. and Wong, Y.C., 1999. Automatic subassembly detection from a product model for disassembly sequence generation. International Journal of Advanced Manufacturing, 15, 425-431.
-
(1999)
International Journal of Advanced Manufacturing
, vol.15
, pp. 425-431
-
-
Ong, N.S.1
Wong, Y.C.2
-
13
-
-
0032642458
-
Selective disassembly for virtual prototyping as applied to de-manufacturing
-
Srinivasan, H., Figueroa, R., and Gadh, R., 1999. Selective disassembly for virtual prototyping as applied to de-manufacturing. Robotics and Computer-Integrated Manufacturing, 15 (3), 231-245.
-
(1999)
Robotics and Computer-Integrated Manufacturing
, vol.15
, Issue.3
, pp. 231-245
-
-
Srinivasan, H.1
Figueroa, R.2
Gadh, R.3
-
15
-
-
4444243737
-
A connector-based approach to modular equation problem for mechanical products
-
Tseng, H.E., Chang, T.S., and Yang, Y.C., 2004a. A connector-based approach to modular equation problem for mechanical products. International Journal of Advanced Manufacturing Technology, 24, 161-171.
-
(2004)
International Journal of Advanced Manufacturing Technology
, vol.24
, pp. 161-171
-
-
Tseng, H.E.1
Chang, T.S.2
Yang, Y.C.3
-
16
-
-
2542492970
-
Connector-based approach to assembly planning using a genetic algorithm
-
Tseng, H.E., Li, J.D., and Chang, Y.H., 2004b. Connector-based approach to assembly planning using a genetic algorithm. International Journal of Production Research, 42 (11), 2243-2261.
-
(2004)
International Journal of Production Research
, vol.42
, Issue.11
, pp. 2243-2261
-
-
Tseng, H.E.1
Li, J.D.2
Chang, Y.H.3
-
17
-
-
29344436275
-
A sequential consideration for assembly sequence planning and assembly line balancing using the connector concept
-
Tseng, H.E. and Tang, C.E., 2006. A sequential consideration for assembly sequence planning and assembly line balancing using the connector concept. International Journal of Production Research, 44 (1), 97-116.
-
(2006)
International Journal of Production Research
, vol.44
, Issue.1
, pp. 97-116
-
-
Tseng, H.E.1
Tang, C.E.2
-
18
-
-
38749139283
-
Modular design to support green life-cycle engineering
-
Tseng, H.E., Chang, C.C., and Li, J.D., 2008. Modular design to support green life-cycle engineering. Expert System with Applications, 34 (4), 2524-2537.
-
(2008)
Expert System with Applications
, vol.34
, Issue.4
, pp. 2524-2537
-
-
Tseng, H.E.1
Chang, C.C.2
Li, J.D.3
-
19
-
-
0041877452
-
An initial study of direct relationships between life-cycle modularity and life-cycle cost
-
Zhang, Y. and Gershenson, J.K., 2003. An initial study of direct relationships between life-cycle modularity and life-cycle cost. Concurrent Engineering: Research and Applications, 11 (2), 121-128.
-
(2003)
Concurrent Engineering: Research and Applications
, vol.11
, Issue.2
, pp. 121-128
-
-
Zhang, Y.1
Gershenson, J.K.2
|