메뉴 건너뛰기




Volumn , Issue , 2009, Pages

Should the spinning reserve procurement in systems with wind power generation be deterministic or probabilistic?

Author keywords

Cost benefit; Deterministic; Probabilistic; Spinning reserve

Indexed keywords

DETERMINISTIC; DETERMINISTIC APPROACH; HANDLING SYSTEMS; N-1 CRITERION; OPERATING POLICIES; PROBABILISTIC APPROACHES; SPINNING RESERVES; SYSTEM OPERATOR;

EID: 77951450592     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: 10.1109/SUPERGEN.2009.5348164     Document Type: Conference Paper
Times cited : (22)

References (44)
  • 2
    • 47149085510 scopus 로고    scopus 로고
    • The California ISO
    • [Online]. Available Accessed
    • CAISO, "The California ISO," in Spinning Reserve Requirements. [Online]. Available: http://www.caiso.com/. Accessed
    • Spinning Reserve Requirements
  • 4
    • 47149108759 scopus 로고    scopus 로고
    • [Online]. Available New York. Accessed on
    • NYISO, "The New York Independent System Operator." [Online]. Available: http://www.nyiso.com, New York. Accessed on: 2007
    • (2007) The New York Independent System Operator
  • 6
    • 77951438664 scopus 로고    scopus 로고
    • Pennsylvania-New Jersey-Maryland
    • [Online]. Available Accessed on
    • PJM, "Pennsylvania-New Jersey-Maryland," in Scheduling Operation. [Online]. Available: http://www.pjm.com/contributions/pjm-manuals/ pdf/m11v22.pdf. Accessed on: 2007
    • (2007) Scheduling Operation
  • 7
    • 77951434037 scopus 로고    scopus 로고
    • Red Eléctrica de España
    • [Online]. Available Accessed on
    • REE, "Red Eléctrica de España," in Operación del Sistema Eléctrico. [Online]. Available: http://www.ree.es/cap03/pdf/po/PO-resol-30jul1998-b.pdf. Accessed on: 2007
    • (2007) Operación del Sistema Eléctrico
  • 8
    • 0036806111 scopus 로고    scopus 로고
    • Power system security
    • Oct.
    • D. S. Kirschen, "Power system security," Power Eng. J., vol. 16, pp. 241-248, Oct. 2002.
    • (2002) Power Eng. J. , vol.16 , pp. 241-248
    • Kirschen, D.S.1
  • 9
    • 84937657196 scopus 로고
    • Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection
    • Oct.
    • L. T. Anstine, R. E. Burke, J. E. Casey, R. Holgate, R. S. John, and H. G. Stewart, "Application of probability methods to the determination of spinning reserve requirements for the Pennsylvania-New Jersey-Maryland interconnection," IEEE Trans. Power App. Syst., vol. PAS-82, no. 68, pp. 720-735, Oct. 1963.
    • (1963) IEEE Trans. Power App. Syst. , vol.PAS-82 , Issue.68 , pp. 720-735
    • Anstine, L.T.1    Burke, R.E.2    Casey, J.E.3    Holgate, R.4    John, R.S.5    Stewart, H.G.6
  • 10
    • 0015058420 scopus 로고
    • Security constrained unit commitment
    • J. D. Guy, "Security constrained unit commitment," IEEE Trans. Power App. Syst., vol. PAS-90, pp. 1385-1389, 1971.
    • (1971) IEEE Trans. Power App. Syst. , vol.PAS-90 , pp. 1385-1389
    • Guy, J.D.1
  • 13
    • 1442289950 scopus 로고    scopus 로고
    • An electricity market with a probabilistic spinning reserve criterion
    • Feb.
    • F. Bouffard and F. D. Galiana, "An electricity market with a probabilistic spinning reserve criterion," IEEE Trans. Power Syst., vol. 19, pp. 300-307, Feb. 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , pp. 300-307
    • Bouffard, F.1    Galiana, F.D.2
  • 14
    • 28244483147 scopus 로고    scopus 로고
    • Market-clearing with stochastic security - Part I: Formulation
    • DOI 10.1109/TPWRS.2005.857016
    • F. Bouffard, F. D. Galiana, and A. J. Conejo, "Market-clearing with stochastic security - Part I: Formulation," IEEE Trans. Power Syst., vol. 20, pp. 1818-1826, Nov. 2005. (Pubitemid 41700534)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 1818-1826
    • Bouffard, F.1    Galiana, F.D.2    Conejo, A.J.3
  • 15
    • 28244448538 scopus 로고    scopus 로고
    • Market-clearing with stochastic security - Part II: Case studies
    • DOI 10.1109/TPWRS.2005.857015
    • F. Bouffard, F. D. Galiana, and A. J. Conejo, "Market-clearing with stochastic security - Part II: Case studies," IEEE Trans. Power Syst., vol. 20, pp. 1827-1835, Nov. 2005. (Pubitemid 41700535)
    • (2005) IEEE Transactions on Power Systems , vol.20 , Issue.4 , pp. 1827-1835
    • Bouffard, F.1    Galiana, F.D.2    Conejo, A.J.3
  • 16
    • 13844320119 scopus 로고    scopus 로고
    • Operating reserve model in the power market
    • Feb.
    • J. X. Wang, X. F. Wang, and Y. Wu, "Operating reserve model in the power market," IEEE Trans. Power Syst., vol. 20, pp. 223-229, Feb. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , pp. 223-229
    • Wang, J.X.1    Wang, X.F.2    Wu, Y.3
  • 18
    • 33947366923 scopus 로고    scopus 로고
    • Optimizing the spinning reserve requirements using a cost/benefit analysis
    • Feb.
    • M. A. Ortega-Vazquez and D. S. Kirschen, "Optimizing the spinning reserve requirements using a cost/benefit analysis," IEEE Trans. Power Syst., vol. 22, pp. 24-33, Feb. 2007.
    • (2007) IEEE Trans. Power Syst. , vol.22 , pp. 24-33
    • Ortega-Vazquez, M.A.1    Kirschen, D.S.2
  • 19
    • 0029252684 scopus 로고
    • The generalized unit commitment problem
    • Feb.
    • R. Baldick, "The generalized unit commitment problem," IEEE Trans. Power Syst., vol. 10, pp. 465-475, Feb. 1995.
    • (1995) IEEE Trans. Power Syst. , vol.10 , pp. 465-475
    • Baldick, R.1
  • 22
    • 33947392510 scopus 로고    scopus 로고
    • Optimizing the spinning reserve requirements
    • Manchester, UK: Univ. of Manchester
    • M. A. Ortega-Vazquez, "Optimizing the Spinning Reserve Requirements," in Sch. Elect. & Elect. Engn. Manchester, UK: Univ. of Manchester, 2006, pp. 1-219.
    • (2006) Sch. Elect. & Elect. Engn. , pp. 1-219
    • Ortega-Vazquez, M.A.1
  • 25
    • 47149091716 scopus 로고    scopus 로고
    • [Online]. Dash Associates Available Accessed on
    • "Modeling with Xpress-MP." [Online]. Available: http://www.dashoptimization.com/home/downloads/pdf/Modeling-with-Xpress-MP.pdf: Dash Associates. Accessed on: 2007
    • (2007) Modeling with Xpress-MP
  • 27
    • 0027647348 scopus 로고
    • Effects of ramp-rate limits on unit commitment and economic-dispatch
    • Aug.
    • C. Wang and S. M. Shahidehpour, "Effects of ramp-rate limits on unit commitment and economic-dispatch," IEEE Trans. Power Syst., vol. 8, pp. 1341-1350, Aug. 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , pp. 1341-1350
    • Wang, C.1    Shahidehpour, S.M.2
  • 28
    • 0027594442 scopus 로고
    • Reserve margin planning in a wind-hydro-thermal power-system
    • May
    • L. Söder, "Reserve Margin Planning in a Wind-Hydro-Thermal Power-System," IEEE Trans. Power Syst., vol. 8, pp. 564-571, May 1993.
    • (1993) IEEE Trans. Power Syst. , vol.8 , pp. 564-571
    • Söder, L.1
  • 29
    • 84861408123 scopus 로고    scopus 로고
    • Power reserve in interconnected systems with high wind power production
    • Porto, Portugal
    • G. Dany, "Power reserve in interconnected systems with high wind power production," in IEEE Porto Power Tech, Porto, Portugal, 2001.
    • (2001) IEEE Porto Power Tech
    • Dany, G.1
  • 30
    • 0038208236 scopus 로고    scopus 로고
    • Effects of large scale wind power on total system variability and operation: Case study of Northern Ireland
    • S. Persaud, B. Fox, and D. Flynn, "Effects of large scale wind power on total system variability and operation: case study of Northern Ireland," Wind Engineering, vol. 27, pp. 3-20, 2003.
    • (2003) Wind Engineering , vol.27 , pp. 3-20
    • Persaud, S.1    Fox, B.2    Flynn, D.3
  • 32
    • 18944371663 scopus 로고    scopus 로고
    • A new approach to quantify reserve demand in systems with significant installed wind capacity
    • May
    • R. Doherty and M. O'Malley, "A new approach to quantify reserve demand in systems with significant installed wind capacity," IEEE Trans. Power Syst., vol. 20, pp. 587-595, May 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , pp. 587-595
    • Doherty, R.1    O'Malley, M.2
  • 33
    • 33947685476 scopus 로고    scopus 로고
    • Value of bulk energy storage for managing wind power fluctuations
    • Mar.
    • M. Black and G. Strbac, "Value of bulk energy storage for managing wind power fluctuations," IEEE Trans. Ener. Conv., vol. 22, pp. 197-205, Mar. 2007.
    • (2007) IEEE Trans. Ener. Conv. , vol.22 , pp. 197-205
    • Black, M.1    Strbac, G.2
  • 34
    • 43849089442 scopus 로고    scopus 로고
    • Stochastic security for operations planning with significant wind power generation
    • May
    • F. Bouffard and F. D. Galiana, "Stochastic security for operations planning with significant wind power generation," IEEE Trans. Power Syst., vol. 23, p. 10, May 2008.
    • (2008) IEEE Trans. Power Syst. , vol.23 , pp. 10
    • Bouffard, F.1    Galiana, F.D.2
  • 35
    • 0023563676 scopus 로고
    • Short-term load forecasting
    • Dec.
    • G. Gross and F. D. Galiana, "Short-term load forecasting," Proceedings of the IEEE, vol. 75, pp. 1558-1573, Dec. 1987.
    • (1987) Proceedings of the IEEE , vol.75 , pp. 1558-1573
    • Gross, G.1    Galiana, F.D.2
  • 36
    • 0033874583 scopus 로고    scopus 로고
    • Forecasting loads and prices in competitive power markets
    • Feb.
    • D. W. Bunn, "Forecasting loads and prices in competitive power markets," Proceedings of the IEEE, vol. 88, pp. 163-169, Feb. 2000.
    • (2000) Proceedings of the IEEE , vol.88 , pp. 163-169
    • Bunn, D.W.1
  • 38
    • 24944575302 scopus 로고    scopus 로고
    • Assessment of the cost associated with wind generation prediction errors in a liberalized electricity market
    • Aug.
    • A. Fabbri, T. Gomez, S. Roman, J. R. Abbad, and V. H. M. Quezada, "Assessment of the cost associated with wind generation prediction errors in a liberalized electricity market," IEEE Trans. Power Syst., vol. 20, pp. 1440-1446, Aug. 2005.
    • (2005) IEEE Trans. Power Syst. , vol.20 , pp. 1440-1446
    • Fabbri, A.1    Gomez, T.2    Roman, S.3    Abbad, J.R.4    Quezada, V.H.M.5
  • 39
    • 35348894411 scopus 로고    scopus 로고
    • Economic impact assessment of load forecast errors considering the cost of interruptions
    • Montreal, Que., Canada
    • M. A. Ortega-Vazquez and D. S. Kirschen, "Economic impact assessment of load forecast errors considering the cost of interruptions," in IEEE PES General Meeting, Montreal, Que., Canada, 2006, p. 8.
    • (2006) IEEE PES General Meeting , pp. 8
    • Ortega-Vazquez, M.A.1    Kirschen, D.S.2
  • 41
    • 4043118236 scopus 로고    scopus 로고
    • On the optimization of the daily operation of a wind-hydro power plant
    • Aug.
    • E. D. Castronuovo and J. A. P. Lopes, "On the optimization of the daily operation of a wind-hydro power plant," IEEE Trans. Power Syst., vol. 19, pp. 1599-1606, Aug. 2004.
    • (2004) IEEE Trans. Power Syst. , vol.19 , pp. 1599-1606
    • Castronuovo, E.D.1    Lopes, J.A.P.2
  • 43
    • 60149087287 scopus 로고    scopus 로고
    • Estimating the spinning reserve requirements in systems with significant wind power generation penetration
    • forthcoming, Accepted for future publication
    • M. A. Ortega-Vazquez and D. S. Kirschen, "Estimating the spinning reserve requirements in systems with significant wind power generation penetration," IEEE Trans. Power Syst., vol. forthcoming, Accepted for future publication.
    • IEEE Trans. Power Syst.
    • Ortega-Vazquez, M.A.1    Kirschen, D.S.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.