메뉴 건너뛰기




Volumn 24, Issue 3, 2010, Pages 273-280

Efficacy of using support vector machine in a contractor prequalification decision model

Author keywords

Computation; Contractor prequalification; Contractors; Decision making; Decision model; Models; Support vector machine

Indexed keywords

CLASSIFICATION ABILITY; COMPUTATION; CONTRACTOR PREQUALIFICATION; DECISION MODEL; DECISION MODELS; GROUP CLASSIFICATION; HIGH-DIMENSIONAL FEATURE SPACE; NONLINEAR SEPARABLE PROBLEMS; QUALITATIVE DATA; SUPERVISED LEARNING METHODS; SVM MODEL;

EID: 77951234487     PISSN: 08873801     EISSN: None     Source Type: Journal    
DOI: 10.1061/(ASCE)CP.1943-5487.0000030     Document Type: Article
Times cited : (24)

References (45)
  • 2
    • 0003710380 scopus 로고    scopus 로고
    • Dept. of Computer Science and Information Engineering, National Taiwan Univ., 〈〉 (Aug. 6, 2007).
    • Chang, C. C., and Lin, C. J. (2004). " LIBSVM: A library for support vector machines.." Dept. of Computer Science and Information Engineering, National Taiwan Univ., 〈 http://www.csie.ntu.edu.tw/~cjlin/papers/libsvm. pdf 〉 (Aug. 6, 2007).
    • (2004) LIBSVM: A Library for Support Vector Machines
    • Chang, C.C.1    Lin, C.J.2
  • 4
    • 0019552530 scopus 로고
    • Cost-plus contractor selection: Case study
    • Diekmann, J. E. (1981). " Cost-plus contractor selection: Case study.." J. Techn. Counc., 107 (1), 13-25.
    • (1981) J. Techn. Counc. , vol.107 , Issue.1 , pp. 13-25
    • Diekmann, J.E.1
  • 5
    • 0000222666 scopus 로고
    • Prequalification and C-competitiveness
    • Drew, D. S., and Skitmore, R. M. (1993). " Prequalification and C-competitiveness.." Int. J. Manag. Sci., 21 (3), 363-375.
    • (1993) Int. J. Manag. Sci. , vol.21 , Issue.3 , pp. 363-375
    • Drew, D.S.1    Skitmore, R.M.2
  • 6
    • 0032594950 scopus 로고    scopus 로고
    • Support vector machines for spam categorization
    • ITNNEP 1045-9227, 10.1109/72.788645
    • Drucker, H., Wu, D., and Vapnik, V. N. (1999). " Support vector machines for spam categorization.." IEEE Trans. Neural Netw. ITNNEP 1045-9227, 10 (5), 1048-1054. 10.1109/72.788645
    • (1999) IEEE Trans. Neural Netw. , vol.10 , Issue.5 , pp. 1048-1054
    • Drucker, H.1    Wu, D.2    Vapnik, V.N.3
  • 7
    • 34248333828 scopus 로고    scopus 로고
    • Contractor pre-qualification model: State-of-the-art
    • DOI 10.1016/j.ijproman.2006.11.011, PII S0263786306001670
    • El-Sawalhi, N., Eaton, D., and Rustom, R. (2007). " Contractor pre-qualification model: State-of-the-art.." Int. J. Proj. Manag., 25 (5), 465-474. 10.1016/j.ijproman.2006.11.011 0263-7863 (Pubitemid 46731270)
    • (2007) International Journal of Project Management , vol.25 , Issue.5 , pp. 465-474
    • El-Sawalhi, N.1    Eaton, D.2    Rustom, R.3
  • 8
    • 34047230554 scopus 로고    scopus 로고
    • Analysis and application of steel harden ability forecasting model based on support vector machine
    • DOI 10.1109/WCICA.2006.1713474, 1713474, Proceedings of the World Congress on Intelligent Control and Automation (WCICA)
    • Guo, H., Wang, L., and Liu, H. P. (2006). " Analysis and application of steel harden ability forecasting model based on support vector machine.." Proc., 6th World Congress on Intelligent Control and Automation, IEEE, Piscataway, N.J. (Pubitemid 46540996)
    • (2006) Proceedings of the World Congress on Intelligent Control and Automation (WCICA) , vol.2 , pp. 7738-7741
    • Guo, H.1    Wang, L.2    Liu, H.3
  • 9
    • 0002576968 scopus 로고    scopus 로고
    • Criteria for contractor selection
    • Hatush, Z., and Skitmore, M. (1997a). " Criteria for contractor selection.." Constr. Manage. Econom. CMECF3 0144-6193, 15 (1), 19-38. 10.1080/014461997373088 (Pubitemid 127679837)
    • (1997) Construction Management and Economics , vol.15 , Issue.1 , pp. 19-38
    • Hatush, Z.1    Skitmore, M.2
  • 10
    • 0000771440 scopus 로고    scopus 로고
    • Assessment and evaluation of contractor data against client goals using PERT approach
    • Hatush, Z., and Skitmore, M. (1997b). " Assessment and evaluation of contractor data against client goals using PERT approach.." Constr. Manage. Econom. CMECF3 0144-6193, 15 (4), 327-340. 10.1080/014461997372881 (Pubitemid 127679860)
    • (1997) Construction Management and Economics , vol.15 , Issue.4 , pp. 327-340
    • Hatush, Z.1    Skitmore, M.2
  • 13
    • 0027592767 scopus 로고
    • A conceptual alternative to current tendering practice
    • BREIEA 0961-3218, 10.1080/09613219308727284
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1993). " A conceptual alternative to current tendering practice.." Build. Res. Inf. BREIEA 0961-3218, 21 (3), 167-172. 10.1080/09613219308727284
    • (1993) Build. Res. Inf. , vol.21 , Issue.3 , pp. 167-172
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 14
    • 0038618183 scopus 로고
    • Factors influencing U.K. construction clients' choice of contractor
    • BUSCBC 0360-1323, 10.1016/0360-1323(94)90074-4
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994a). " Factors influencing U.K. construction clients' choice of contractor.." Build. Environ. BUSCBC 0360-1323, 29 (2), 241-248. 10.1016/0360-1323(94)90074-4
    • (1994) Build. Environ. , vol.29 , Issue.2 , pp. 241-248
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 15
    • 0038734398 scopus 로고
    • Applying multi-attribute analysis to contractor selection decisions
    • 10.1016/0969-7012(94)90003-5
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994b). " Applying multi-attribute analysis to contractor selection decisions.." Eur. J. Purch. Supply. Manag., 1 (3), 139-148. 10.1016/0969-7012(94)90003-5
    • (1994) Eur. J. Purch. Supply. Manag. , vol.1 , Issue.3 , pp. 139-148
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 16
    • 0028479514 scopus 로고
    • Incorporating project specific criteria and client utility into the evaluation of construction tenderers
    • BREIEA 0961-3218, 10.1080/09613219408727384
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994c). " Incorporating project specific criteria and client utility into the evaluation of construction tenderers.." Build. Res. Inf. BREIEA 0961-3218, 22 (4), 214-221. 10.1080/09613219408727384
    • (1994) Build. Res. Inf. , vol.22 , Issue.4 , pp. 214-221
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 17
    • 0028516227 scopus 로고
    • Evaluating pre-qualification criteria in contractor selection
    • BUSCBC 0360-1323, 10.1016/0360-1323(94)90003-5
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994d). " Evaluating pre-qualification criteria in contractor selection.." Build. Environ. BUSCBC 0360-1323, 29 (4), 437-448. 10.1016/0360-1323(94)90003-5
    • (1994) Build. Environ. , vol.29 , Issue.4 , pp. 437-448
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 18
    • 0002766723 scopus 로고
    • Evaluating performance potential in the selection of construction contractors
    • ZZZZZZ 0969-9988, 10.1108/eb020991
    • Holt, G. D., Olomolaiye, P. O., and Harris, F. C. (1994e). " Evaluating performance potential in the selection of construction contractors.." Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, 1 (1), 29-50. 10.1108/eb020991
    • (1994) Eng., Constr., Archit. Manage. , vol.1 , Issue.1 , pp. 29-50
    • Holt, G.D.1    Olomolaiye, P.O.2    Harris, F.C.3
  • 19
    • 4944228528 scopus 로고    scopus 로고
    • Dept. of Computer Science and Information Engineering, National Taiwan Univ., 〈.〉 (Aug. 6, 2007).
    • Hsu, C. W., Chang, C. C., and Lin, C. J. (2004). " A practical guide to support vector classification.." Dept. of Computer Science and Information Engineering, National Taiwan Univ., 〈 http://www.csie.ntu.edu. tw/~cjlin/papers/guide/guide.pdf.〉 (Aug. 6, 2007).
    • (2004) A Practical Guide to Support Vector Classification
    • Hsu, C.W.1    Chang, C.C.2    Lin, C.J.3
  • 20
    • 33846454686 scopus 로고    scopus 로고
    • Predicting corporate financial distress based on integration of support vector machine and logistic regression
    • DOI 10.1016/j.eswa.2006.05.006, PII S095741740600159X
    • Hua, Z. S., Wang, Y., Xu, X. Y., Zhang, B., and Liang, L. (2007). " Predicting corporate financial distress based on integration of support vector machine and logistic regression.." Expert Sys. Applic. ESAPEH 0957-4174, 33 (2), 434-440. 10.1016/j.eswa.2006.05.006 (Pubitemid 46150047)
    • (2007) Expert Systems with Applications , vol.33 , Issue.2 , pp. 434-440
    • Hua, Z.1    Wang, Y.2    Xu, X.3    Zhang, B.4    Liang, L.5
  • 21
    • 2442665617 scopus 로고    scopus 로고
    • Credit rating analysis with support vector machine and neural networks: A market comparative study
    • DSSYDK 0167-9236, 10.1016/S0167-9236(03)00086-1
    • Huang, Z., Chen, H., Hsu, C. J., Chen, W. H., and Wu, S. (2004). " Credit rating analysis with support vector machine and neural networks: A market comparative study.." Decision Support Sys. DSSYDK 0167-9236, 37 (4), 543-558. 10.1016/S0167-9236(03)00086-1
    • (2004) Decision Support Sys. , vol.37 , Issue.4 , pp. 543-558
    • Huang, Z.1    Chen, H.2    Hsu, C.J.3    Chen, W.H.4    Wu, S.5
  • 23
    • 0037822222 scopus 로고    scopus 로고
    • Asymptotic behaviors of support vector machines with gaussian kernel
    • DOI 10.1162/089976603321891855
    • Keerthi, S. S., and Lin, C. J. (2003). " Asymptotic behaviors of support vector machines with Gaussian kernel.." Neural Comput. NEUCEB 0899-7667, 15 (7), 1667-1689. 10.1162/089976603321891855 (Pubitemid 37035565)
    • (2003) Neural Computation , vol.15 , Issue.7 , pp. 1667-1689
    • Keerthi, S.S.1    Lin, C.-J.2
  • 24
    • 84993073505 scopus 로고    scopus 로고
    • Neural network model for contractors' prequalification for local authority projects
    • ZZZZZZ 0969-9988.
    • Khosrowshahi, F. (1999). " Neural network model for contractors' prequalification for local authority projects.." Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, 6 (3), 315-328.
    • (1999) Eng., Constr., Archit. Manage. , vol.6 , Issue.3 , pp. 315-328
    • Khosrowshahi, F.1
  • 25
    • 0242351905 scopus 로고    scopus 로고
    • Financial time series forecasting using support vector machines
    • DOI 10.1016/S0925-2312(03)00372-2
    • Kim, K. J. (2003). " Financial time series forecasting using support vector machines.." Neurocomputing NRCGEO 0925-2312, 55 (1-2), 307-319. 10.1016/S0925-2312(03)00372-2 (Pubitemid 37336681)
    • (2003) Neurocomputing , vol.55 , Issue.1-2 , pp. 307-319
    • Kim, K.-J.1
  • 26
    • 25844517320 scopus 로고    scopus 로고
    • Using the principal component analysis method as a tool in contractor pre-qualification
    • DOI 10.1080/01446190500041263
    • Lam, K. C., Hu, T. S., and Ng, S. T. (2005). " Using the principal component analysis method as a tool in contractor pre-qualification.." Constr. Manage. Econom. CMECF3 0144-6193, 23 (7), 673-684. 10.1080/ 01446190500041263 (Pubitemid 41388507)
    • (2005) Construction Management and Economics , vol.23 , Issue.7 , pp. 673-684
    • Lam, K.C.1    Hu, T.S.2    Ng, S.T.3
  • 27
    • 0035282199 scopus 로고    scopus 로고
    • A fuzzy neural network approach for contractor prequalification
    • DOI 10.1080/01446190150505108
    • Lam, K. C., Hu, T. S., Ng, S. T., Skitmore, M., and Cheung, S. O. (2001). " A fuzzy neural network approach for contractor prequalification.." Constr. Manage. Econom. CMECF3 0144-6193, 19 (2), 175-188. 10.1080/ 01446190150505108 (Pubitemid 32228859)
    • (2001) Construction Management and Economics , vol.19 , Issue.2 , pp. 175-188
    • Lam, K.C.1    Hu, T.2    Ng, S.T.3    Skitmore, M.4    Cheoung, S.O.5
  • 28
    • 84993014082 scopus 로고    scopus 로고
    • Decision support system for contractor pre-qualification-artificial neural network model
    • ZZZZZZ 0969-9988, 10.1108/eb021150
    • Lam, K. C., Ng, S. T., Hu, T. S., Skitmore, M., and Cheung, S. O. (2000). " Decision support system for contractor pre-qualification-artificial neural network model.." Eng., Constr., Archit. Manage. ZZZZZZ 0969-9988, 3 (3), 251-266. 10.1108/eb021150
    • (2000) Eng., Constr., Archit. Manage. , vol.3 , Issue.3 , pp. 251-266
    • Lam, K.C.1    Ng, S.T.2    Hu, T.S.3    Skitmore, M.4    Cheung, S.O.5
  • 29
    • 33845665258 scopus 로고    scopus 로고
    • Application of support vector machines to corporate credit rating prediction
    • DOI 10.1016/j.eswa.2006.04.018, PII S0957417406001205
    • Lee, Y. C. (2007). " Application of support vector machines to corporate credit rating prediction.." Expert Sys. Applic. ESAPEH 0957-4174, 33 (1), 67-74. 10.1016/j.eswa.2006.04.018 (Pubitemid 44959918)
    • (2007) Expert Systems with Applications , vol.33 , Issue.1 , pp. 67-74
    • Lee, Y.-C.1
  • 30
    • 0001500115 scopus 로고
    • Functions of positive and negative type and their connection with the theory of integral equations
    • PTRMAD 0962-8428,. 10.1098/rsta.1909.0016
    • Mercer, T. (1909). " Functions of positive and negative type and their connection with the theory of integral equations.." Philos. Trans. R. Soc. London, Ser. A PTRMAD 0962-8428, 209, 415-446. 10.1098/rsta.1909.0016
    • (1909) Philos. Trans. R. Soc. London, Ser. A , vol.209 , pp. 415-446
    • Mercer, T.1
  • 31
    • 17844363481 scopus 로고    scopus 로고
    • Bankruptcy prediction using support vector machine with optimal choice of kernel function parameters
    • DOI 10.1016/j.eswa.2004.12.008, PII S0957417404001526
    • Min, J. H., and Lee, Y. C. (2005). " Bankruptcy prediction using support vector machine with optimal choice of kernel function parameters.." Expert Sys. Applic. ESAPEH 0957-4174, 28, 603-614. 10.1016/j.eswa.2004.12.008 (Pubitemid 40583838)
    • (2005) Expert Systems with Applications , vol.28 , Issue.4 , pp. 603-614
    • Min, J.H.1    Lee, Y.-C.2
  • 33
    • 0030673582 scopus 로고    scopus 로고
    • Training support vector machines: An application to face detection
    • IEEE, Piscataway, N.J..
    • Osuna, E., Freund, R. and Girosi, F. (1997). " Training support vector machines: an application to face detection.." Proc., Computer Vision and Pattern Recognition, IEEE, Piscataway, N.J., 130-136.
    • (1997) Proc., Computer Vision and Pattern Recognition , pp. 130-136
    • Osuna, E.1    Freund, R.2    Girosi, F.3
  • 34
    • 0001582664 scopus 로고
    • Decision criteria in contractor prequalification
    • JMENEA 0742-597X, 10.1061/(ASCE)9742-597X(1988)4:2(148)
    • Russell, J. S., and Skibniewski, M. J. (1988). " Decision criteria in contractor prequalification.." J. Manage. Eng. JMENEA 0742-597X, 4 (2), 148-164. 10.1061/(ASCE)9742-597X(1988)4:2(148)
    • (1988) J. Manage. Eng. , vol.4 , Issue.2 , pp. 148-164
    • Russell, J.S.1    Skibniewski, M.J.2
  • 35
    • 0025220842 scopus 로고
    • Qualifier-1: Contractor prequalification model
    • JCCEE5 0887-3801, 10.1061/(ASCE)0887-3801(1990)4:1(77)
    • Russell, J. S., and Skibniewski, M. J. (1990). " Qualifier-1: contractor prequalification model.." J. Comput. Civ. Eng. JCCEE5 0887-3801, 4 (1), 77-90. 10.1061/(ASCE)0887-3801(1990)4:1(77)
    • (1990) J. Comput. Civ. Eng. , vol.4 , Issue.1 , pp. 77-90
    • Russell, J.S.1    Skibniewski, M.J.2
  • 36
    • 0025398528 scopus 로고
    • Qualifier-2: Knowledge-based system for contractor prequalification
    • JCEMD4 0733-9364, 10.1061/(ASCE)0733-9364(1990)116:1(157)
    • Russell, J. S., Skibniewski, M. J., and Cozier, D. R. (1990). " Qualifier-2: knowledge-based system for contractor prequalification.." J. Constr. Eng. Manage. JCEMD4 0733-9364, 116 (1), 157-171. 10.1061/(ASCE)0733- 9364(1990)116:1(157)
    • (1990) J. Constr. Eng. Manage. , vol.116 , Issue.1 , pp. 157-171
    • Russell, J.S.1    Skibniewski, M.J.2    Cozier, D.R.3
  • 38
    • 9244259665 scopus 로고    scopus 로고
    • An application of support vector machines in bankruptcy prediction model
    • ESAPEH 0957-4174, 10.1016/j.eswa.2004.08.009
    • Shin, K. S., Lee, T. S., and Kim, H. J. (2005). " An application of support vector machines in bankruptcy prediction model.." Expert Sys. Applic. ESAPEH 0957-4174, 28 (1), 127-135. 10.1016/j.eswa.2004.08.009
    • (2005) Expert Sys. Applic. , vol.28 , Issue.1 , pp. 127-135
    • Shin, K.S.1    Lee, T.S.2    Kim, H.J.3
  • 39
    • 0032664993 scopus 로고    scopus 로고
    • Improving the manufacturability of electronic designs
    • IEESAM 0018-9235, 10.1109/6.769272
    • Stoneking, D. (1999). " Improving the manufacturability of electronic designs.." IEEE Spectrum IEESAM 0018-9235, 36 (6), 70-76. 10.1109/6.769272
    • (1999) IEEE Spectrum , vol.36 , Issue.6 , pp. 70-76
    • Stoneking, D.1
  • 40
    • 0001023715 scopus 로고    scopus 로고
    • Application of support vector machines in financial time series forecasting
    • DOI 10.1016/S0305-0483(01)00026-3, PII S0305048301000263
    • Tay, F. E. H., and Cao, L. (2001). " Application of support vector machines in financial time series forecasting.." Omega OMEGAG 0305-0483, 29 (4), 309-317. 10.1016/S0305-0483(01)00026-3 (Pubitemid 33628757)
    • (2001) Omega , vol.29 , Issue.4 , pp. 309-317
    • Tay, F.E.H.1    Cao, L.2
  • 44
    • 0001024505 scopus 로고
    • On the uniform convergence of relative frequencies of events to their probabilities
    • TPRBAU 0040-585X, 10.1137/1116025
    • Vapnik, V. N. and Chervnoenkis, A. J. (1971). " On the uniform convergence of relative frequencies of events to their probabilities.." Theor. Probab. Appl. TPRBAU 0040-585X, 16 (2), 264-280. 10.1137/1116025
    • (1971) Theor. Probab. Appl. , vol.16 , Issue.2 , pp. 264-280
    • Vapnik, V.N.1    Chervnoenkis, A.J.2
  • 45
    • 34248666540 scopus 로고
    • Fuzzy sets
    • 10.1016/S0019-9958(65)90241-X 0019-9958
    • Zadeh, L. (1965). " Fuzzy sets.." Inf. Control, 8 (3), 338-353. 10.1016/S0019-9958(65)90241-X 0019-9958
    • (1965) Inf. Control , vol.8 , Issue.3 , pp. 338-353
    • Zadeh, L.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.