메뉴 건너뛰기




Volumn 33, Issue 2, 2010, Pages 317-333

A job-plan based performance evaluation for construction value engineering study

Author keywords

Construction VE study; Job plan; Performance evaluation

Indexed keywords

SURVEYS; VALUE ENGINEERING;

EID: 77950816089     PISSN: 02533839     EISSN: 21587299     Source Type: Journal    
DOI: 10.1080/02533839.2010.9671620     Document Type: Article
Times cited : (22)

References (27)
  • 1
    • 0000987481 scopus 로고    scopus 로고
    • The Changing Role of Builder's Merchants in the Construction Supply Chain
    • Agapiou, A., 1998. “The Changing Role of Builder's Merchants in the Construction Supply Chain”. Construction Management & Economics, 16 (3):351–361.
    • (1998) Construction Management & Economics , vol.16 , Issue.3 , pp. 351-361
    • Agapiou, A.1
  • 4
    • 77950823630 scopus 로고    scopus 로고
    • Measuring Performance of a VM Program
    • Bethany, K., 2003. “Measuring Performance of a VM Program”. Value World, 26 (2):12–17.
    • (2003) Value World , vol.26 , Issue.2 , pp. 12-17
    • Bethany, K.1
  • 6
    • 77950803659 scopus 로고    scopus 로고
    • Utilization of Computers to Enhance the Efficiency of Value Engineering Study
    • (in Chinese)
    • Chen, W. T., and Chang, P. Y., 2008. “Utilization of Computers to Enhance the Efficiency of Value Engineering Study”. Civil and Hydraulic, 35 (1):78–85. (in Chinese)
    • (2008) Civil and Hydraulic , vol.35 , Issue.1 , pp. 78-85
    • Chen, W.T.1    Chang, P.Y.2
  • 7
    • 47549111718 scopus 로고    scopus 로고
    • Using Factor Analysis to Assess Route Construction Priority for Common Duct Network in Taiwan
    • Chen, W. T., Chen, T. T., Lin, Y. P., and Lu, C., 2008. “Using Factor Analysis to Assess Route Construction Priority for Common Duct Network in Taiwan”. Journal of Marine Science and Technology, 16 (2):77–89.
    • (2008) Journal of Marine Science and Technology , vol.16 , Issue.2 , pp. 77-89
    • Chen, W.T.1    Chen, T.T.2    Lin, Y.P.3    Lu, C.4
  • 10
  • 11
    • 2042510301 scopus 로고    scopus 로고
    • Benchmarking for Construction: Theory and Practice
    • Garnett, N., 2000. “Benchmarking for Construction:Theory and Practice”. Construction Management & Economics, 18 (1):55–63.
    • (2000) Construction Management & Economics , vol.18 , Issue.1 , pp. 55-63
    • Garnett, N.1
  • 13
    • 40649111097 scopus 로고    scopus 로고
    • AHP- and Simulation-Based Budget Determination Procedure for Public Building Construction Projects
    • Lai, Y.-T., Wang, W.-C., and Wang, H.-H., 2008. “AHP- and Simulation-Based Budget Determination Procedure for Public Building Construction Projects”. Automation in Construction, 17:623–632.
    • (2008) Automation in Construction , vol.17 , pp. 623-632
    • Lai, Y.-T.1    Wang, W.-C.2    Wang, H.-H.3
  • 15
    • 33845760469 scopus 로고    scopus 로고
    • Measuring the Performance of Value Management Studies in Construction: Critical Review
    • Lin, G., and Shen, Q., 2007. “Measuring the Performance of Value Management Studies in Construction:Critical Review”. Journal of Construction Engineering and Management, 23 (1):2–9.
    • (2007) Journal of Construction Engineering and Management , vol.23 , Issue.1 , pp. 2-9
    • Lin, G.1    Shen, Q.2
  • 20
    • 2342418043 scopus 로고    scopus 로고
    • Holistic Appraisal of Value Engineering in Construction in United States
    • Palmer, A., Kelly, J., and Male, S., 1996. “Holistic Appraisal of Value Engineering in Construction in United States”. Journal of Construction Engineering and Management, 122 (4):324–328.
    • (1996) Journal of Construction Engineering and Management , vol.122 , Issue.4 , pp. 324-328
    • Palmer, A.1    Kelly, J.2    Male, S.3
  • 21
    • 85023929103 scopus 로고    scopus 로고
    • Proceedings of SAVE International 38th Conference, Washington DC, USA.
    • Pucetas, J. D., “Keys to Successful VE Implementation”. Proceedings of SAVE International 38th Conference. Washington DC, USA. pp. 333–342.
    • Keys to Successful VE Implementation , pp. 333-342
    • Pucetas, J.D.1
  • 23
    • 34548400272 scopus 로고    scopus 로고
    • Application of the Analytic Hierarchy Process (AHP) in Multi-Criteria Analysis of the Selection of Intelligent Building Systems
    • Wong, K. W., and Li, H., 2008. “Application of the Analytic Hierarchy Process (AHP) in Multi-Criteria Analysis of the Selection of Intelligent Building Systems”. Building and Environment, 43:108–125.
    • (2008) Building and Environment , vol.43 , pp. 108-125
    • Wong, K.W.1    Li, H.2
  • 24
    • 13644277735 scopus 로고
    • Exploring the Interface between the Hierarchies, Multiple Objectives and Fuzzy Sets
    • Saaty, T. L., 1978. “Exploring the Interface between the Hierarchies, Multiple Objectives and Fuzzy Sets”. Fuzzy Sets and Systems, 1:57–68.
    • (1978) Fuzzy Sets and Systems , vol.1 , pp. 57-68
    • Saaty, T.L.1
  • 25
    • 13944274913 scopus 로고    scopus 로고
    • Critical Success Factors for Value Management Studies in Construction
    • Shen, Q., and Liu, G., 2003. “Critical Success Factors for Value Management Studies in Construction”. Journal of Construction Engineering and Management, 129 (5):485–491.
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 485-491
    • Shen, Q.1    Liu, G.2
  • 26
    • 77950848670 scopus 로고    scopus 로고
    • VM: The Collaborative Team Model
    • Sperling, R. B., 2002. “VM:The Collaborative Team Model”. Value World, 24 (1):14–16.
    • (2002) Value World , vol.24 , Issue.1 , pp. 14-16
    • Sperling, R.B.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.