-
1
-
-
11944252554
-
Performance modeling for contractor selection
-
Alarcón, L. F., and Mourgues, C. (2002). " Performance modeling for contractor selection.. " J. Manage. Eng., 18 (2), 52-60.
-
(2002)
J. Manage. Eng.
, vol.18
, Issue.2
, pp. 52-60
-
-
Alarcón, L.F.1
Mourgues, C.2
-
2
-
-
14744304229
-
Performance measurement in construction
-
Bassioni, H. A., Price, A. D. F., and Hassan, T. M. (2004). " Performance measurement in construction.. " J. Manage. Eng., 20 (2), 42-50.
-
(2004)
J. Manage. Eng.
, vol.20
, Issue.2
, pp. 42-50
-
-
Bassioni, H.A.1
Price, A.D.F.2
Hassan, T.M.3
-
3
-
-
20744455983
-
KPIs: A critical appraisal of their use in construction
-
Beatham, S., Anumba, C., Thorpe, T., and Hedges, I. (2004). " KPIs: A critical appraisal of their use in construction.. " Benchmarking: An Int. J., 11 (1), 93-117.
-
(2004)
Benchmarking: An Int. J.
, vol.11
, Issue.1
, pp. 93-117
-
-
Beatham, S.1
Anumba, C.2
Thorpe, T.3
Hedges, I.4
-
5
-
-
3543129537
-
Integrated performance measurement systems: A development guide
-
Bititci, U. S., Carrie, A. S., and McDevitt, L. (1997). " Integrated performance measurement systems: A development guide.. " Int. J. Operat. Product. Manage., 17 (5), 522-534.
-
(1997)
Int. J. Operat. Product. Manage.
, vol.17
, Issue.5
, pp. 522-534
-
-
Bititci, U.S.1
Carrie, A.S.2
McDevitt, L.3
-
6
-
-
0000786365
-
Why performance measurement interventions succeed and fail
-
Cambridge, U.K.
-
Bourne, M., and Neely, A. (2000). " Why performance measurement interventions succeed and fail.. " Proc., 2nd Int. Conf. on Performance Measurement, Cambridge, U.K., 165-173.
-
(2000)
Proc., 2nd Int. Conf. on Performance Measurement
, pp. 165-173
-
-
Bourne, M.1
Neely, A.2
-
7
-
-
13944265046
-
Factors affecting the success of a construction project
-
Chan, A. P. C., Scott, D., and Chan, A. P. L. (2004). " Factors affecting the success of a construction project.. " J. Constr. Eng. Manage., 130 (1), 153-155.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.1
, pp. 153-155
-
-
Chan, A.P.C.1
Scott, D.2
Chan, A.P.L.3
-
8
-
-
0242434228
-
Framework of success criteria for design/build projects
-
Chan, A. P. C., Scott, D., and Lam, E. W. M. (2002). " Framework of success criteria for design/build projects.. " J. Manage. Eng., 18 (3), 120-128.
-
(2002)
J. Manage. Eng.
, vol.18
, Issue.3
, pp. 120-128
-
-
Chan, A.P.C.1
Scott, D.2
Lam, E.W.M.3
-
9
-
-
0001055467
-
The ranking of construction management journals
-
Chau, K. W. (1997). " The ranking of construction management journals.. " Constr. Manage. Econom., 15 (4), 387-398.
-
(1997)
Constr. Manage. Econom.
, vol.15
, Issue.4
, pp. 387-398
-
-
Chau, K.W.1
-
10
-
-
1642587217
-
PPMS: A web-based construction project performance monitoring system
-
Cheung, S. O., Suen, H. C. H., and Cheung, K. K. W. (2004). " PPMS: A web-based construction project performance monitoring system.. " Autom. Constr., 13 (3), 361-376.
-
(2004)
Autom. Constr.
, vol.13
, Issue.3
, pp. 361-376
-
-
Cheung, S.O.1
Suen, H.C.H.2
Cheung, K.K.W.3
-
11
-
-
33845722537
-
-
Construction Best Practice Program (CBPP).
-
Construction Best Practice Program (CBPP). (2002). " Key performance indicators.. " 〈 http://www.constructingexcellence.org.uk/ 〉 (Jul. 2004).
-
(2002)
Key Performance Indicators
-
-
-
12
-
-
33845776029
-
-
Construction Industry Institute (CII). (2005)
-
Construction Industry Institute (CII). (2005). 〈http://cii- benchmarking.org/〉 (Mar. 2005).
-
(2005)
-
-
-
13
-
-
0012038947
-
The SMART way to define and sustain success
-
Cross, K. F., and Lynch, R. L. (1988). " The SMART way to define and sustain success.. " Natl. Prod. Rev., 8 (1), 23-33.
-
(1988)
Natl. Prod. Rev.
, vol.8
, Issue.1
, pp. 23-33
-
-
Cross, K.F.1
Lynch, R.L.2
-
15
-
-
0003449093
-
-
Dow Jones-Irwin, Homewood, Ill.
-
Dixon, J. R., Nanni, A. J., and Vollmann, T. E. (1990). The new performance challenge-Measuring operations for world-class competition, Dow Jones-Irwin, Homewood, Ill.
-
(1990)
The New Performance Challenge-Measuring Operations for World-class Competition
-
-
Dixon, J.R.1
Nanni, A.J.2
Vollmann, T.E.3
-
16
-
-
0003732501
-
-
Dept. of the Environment, Transport and the Regions, London.
-
Egan, J. (1998). Rethinking construction, Dept. of the Environment, Transport and the Regions, London.
-
(1998)
Rethinking Construction
-
-
Egan, J.1
-
18
-
-
0342656664
-
Is the Hong Kong construction industry ready for value management
-
Fong, S. W., and Shen, Q. P. (2000). " Is the Hong Kong construction industry ready for value management.. " Int. J. Proj. Manage., 18, 317-326.
-
(2000)
Int. J. Proj. Manage.
, vol.18
, pp. 317-326
-
-
Fong, S.W.1
Shen, Q.P.2
-
19
-
-
2042510301
-
Benchmarking for construction: Theory and practice
-
Garnett, N., and Pickrell, S. (2000). " Benchmarking for construction: Theory and practice.. " Constr. Manage. Econom., 18 (1), 55-63.
-
(2000)
Constr. Manage. Econom.
, vol.18
, Issue.1
, pp. 55-63
-
-
Garnett, N.1
Pickrell, S.2
-
20
-
-
0000942012
-
Evaluating contractor prequalification data: Selection criteria and project success factors
-
Hutush, Z., and Skitmore, M. (1997). " Evaluating contractor prequalification data: Selection criteria and project success factors.. " Constr. Manage. Econom., 15 (2), 129-147.
-
(1997)
Constr. Manage. Econom.
, vol.15
, Issue.2
, pp. 129-147
-
-
Hutush, Z.1
Skitmore, M.2
-
21
-
-
0037876286
-
Performance management in construction: A conceptual framework
-
Kagioglou, M., Cooper, R., and Aouad, G. (2001). " Performance management in construction: A conceptual framework.. " Constr. Manage. Econom., 19 (1), 85-95.
-
(2001)
Constr. Manage. Econom.
, vol.19
, Issue.1
, pp. 85-95
-
-
Kagioglou, M.1
Cooper, R.2
Aouad, G.3
-
22
-
-
0001451553
-
Measuring manufacturing performance: A new challenge for managerial accounting research
-
Kaplan, R. S. (1983). " Measuring manufacturing performance: A new challenge for managerial accounting research.. " Account. Rev., 58 (4), 686-705.
-
(1983)
Account. Rev.
, vol.58
, Issue.4
, pp. 686-705
-
-
Kaplan, R.S.1
-
23
-
-
84968082676
-
Accounting lag-The obsolescence of cost accounting system
-
Kaplan, R. S. (1986). " Accounting lag-The obsolescence of cost accounting system.. " California Manage. Rev., 28 (2), 174-199.
-
(1986)
California Manage. Rev.
, vol.28
, Issue.2
, pp. 174-199
-
-
Kaplan, R.S.1
-
24
-
-
0026494564
-
The balanced scorecard-Measures that drive performance
-
Kaplan, R. S., and Norton, D. P. (1992). " The balanced scorecard-Measures that drive performance.. " Harvard Bus. Rev., 70, 71-79.
-
(1992)
Harvard Bus. Rev.
, vol.70
, pp. 71-79
-
-
Kaplan, R.S.1
Norton, D.P.2
-
25
-
-
0004296314
-
-
Spon Press, Taylor and Francis Group, London.
-
Kelly, J., and Male, S. (1993). Value management in design and construction: The economic management of projects, Spon Press, Taylor and Francis Group, London.
-
(1993)
Value Management in Design and Construction: The Economic Management of Projects
-
-
Kelly, J.1
Male, S.2
-
26
-
-
2142768897
-
Simple durability test for cement stabilized blocks
-
Kerali, A. G., and Thomas, T. H. (2004). " Simple durability test for cement stabilized blocks.. " Build. Res. Inf., 32 (2), 140-145.
-
(2004)
Build. Res. Inf.
, vol.32
, Issue.2
, pp. 140-145
-
-
Kerali, A.G.1
Thomas, T.H.2
-
27
-
-
33845778798
-
-
KPI Working Grou
-
KPI Working Group. (2000). KPI Rep. for the Minister for Construction, Dept. of the Environment, Transport and the Regions, London.
-
(2000)
-
-
-
28
-
-
0029734237
-
Systematizing construction project evaluations
-
Kumaraswamy, M. M., and Thorpe, A. (1996). " Systematizing construction project evaluations.. " J. Manage. Eng., 12 (1), 34-39.
-
(1996)
J. Manage. Eng.
, vol.12
, Issue.1
, pp. 34-39
-
-
Kumaraswamy, M.M.1
Thorpe, A.2
-
29
-
-
0004178374
-
-
Her Majesty's Stationery Office, London.
-
Latham, M. (1994). Constructing the team, Her Majesty's Stationery Office, London.
-
(1994)
Constructing the Team
-
-
Latham, M.1
-
30
-
-
84992996699
-
Partnering research in construction
-
Li, H., Cheng, E. W. L., and Love, P. E. D. (2000). " Partnering research in construction.. " Eng., Constr., Archit. Manage., 7 (1), 76-99.
-
(2000)
Eng., Constr., Archit. Manage.
, vol.7
, Issue.1
, pp. 76-99
-
-
Li, H.1
Cheng, E.W.L.2
Love, P.E.D.3
-
31
-
-
33845763252
-
A framework for performance measurement of value management studies in construction
-
China Architecture and Building Press, Hong Kong
-
Lin, G. B., Shen, Q. P., and Fan, S. C. (2004). " A framework for performance measurement of value management studies in construction.. " Proc., 3rd Int. Conf. on Construction and Real Estate Management, China Architecture and Building Press, Hong Kong, 307-311.
-
(2004)
Proc., 3rd Int. Conf. on Construction and Real Estate Management
, pp. 307-311
-
-
Lin, G.B.1
Shen, Q.P.2
Fan, S.C.3
-
32
-
-
0000855204
-
Evaluation of project outcomes
-
Liu, A. M. M., and Walker, A. (1998). " Evaluation of project outcomes.. " Constr. Manage. Econom., 16, 209-219.
-
(1998)
Constr. Manage. Econom.
, vol.16
, pp. 209-219
-
-
Liu, A.M.M.1
Walker, A.2
-
33
-
-
2342506785
-
-
Thomas Telford, London.
-
Male, S., Kelly, J., Fernie, S., Gronqvist, M., and Bowles, G. (1998a). The value management benchmark: A good practice framework for clients and practitioners, Thomas Telford, London.
-
(1998)
The Value Management Benchmark: A Good Practice Framework for Clients and Practitioners
-
-
Male, S.1
Kelly, J.2
Fernie, S.3
Gronqvist, M.4
Bowles, G.5
-
34
-
-
2342645124
-
-
Thomas Telford, London.
-
Male, S., Kelly, J., Fernie, S., Gronqvist, M., and Bowles, G. (1998b). The value management benchmark: Research results of an international benchmarking study, Thomas Telford, London.
-
(1998)
The Value Management Benchmark: Research Results of An International Benchmarking Study
-
-
Male, S.1
Kelly, J.2
Fernie, S.3
Gronqvist, M.4
Bowles, G.5
-
36
-
-
0003702954
-
-
Financial Times Prentice-Hall, London.
-
Neely, A., Adams, C., and Kennerley, M. (2002). The performance prism: The scorecard for measuring and managing business success, Financial Times Prentice-Hall, London.
-
(2002)
The Performance Prism: The Scorecard for Measuring and Managing Business Success
-
-
Neely, A.1
Adams, C.2
Kennerley, M.3
-
37
-
-
0033478138
-
The performance measurement revolution: Why now and what next
-
Neely, A. D. (1999). " The performance measurement revolution: Why now and what next.. " Int. J. Operat. Product. Manage., 19 (2), 205-228.
-
(1999)
Int. J. Operat. Product. Manage.
, vol.19
, Issue.2
, pp. 205-228
-
-
Neely, A.D.1
-
39
-
-
2342418043
-
Holistic appraisal of value engineering in construction in United States
-
Palmer, A., Kelly, J., and Male, S. (1996). " Holistic appraisal of value engineering in construction in United States.. " J. Constr. Eng. Manage., 122 (4), 324-328.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.4
, pp. 324-328
-
-
Palmer, A.1
Kelly, J.2
Male, S.3
-
40
-
-
13944282971
-
ASCE Journal of Construction Engineering and Management: Review of the years 1983-2000
-
Pietroforte, R., and Stefani, T. P. (2004). " ASCE Journal of Construction Engineering and Management: Review of the years 1983-2000.. " J. Constr. Eng. Manage., 130 (3), 440-448.
-
(2004)
J. Constr. Eng. Manage.
, vol.130
, Issue.3
, pp. 440-448
-
-
Pietroforte, R.1
Stefani, T.P.2
-
41
-
-
14744304274
-
Benchmarking system for evaluating management practices in the construction industry
-
Ramirez, R. R., Alarcón, L., F., and Knights, P. (2004). " Benchmarking system for evaluating management practices in the construction industry.. " J. Manage. Eng., 20 (3), 110-117.
-
(2004)
J. Manage. Eng.
, vol.20
, Issue.3
, pp. 110-117
-
-
Ramirez, R.R.1
Alarcón, L.F.2
Knights, P.3
-
42
-
-
31844446120
-
-
SAVE International.
-
SAVE International. (1998). " Value methodology standard.. " 〈 http://www.value-eng.org/pdf_docs/about/VMStandardMethodology.pdf 〉 (Apr. 2004).
-
(1998)
Value Methodology Standard
-
-
-
43
-
-
33845782761
-
-
SAVE International. (2005)
-
SAVE International. (2005). 〈 http://www.value-eng.org/ 〉 (Mar. 2005).
-
(2005)
-
-
-
45
-
-
0036532724
-
A group decision support system for value management studies in the construction industry
-
Shen, Q. P., and Chung, K. H. (2002). " A group decision support system for value management studies in the construction industry.. " Int. J. Proj. Manage., 20, 247-252.
-
(2002)
Int. J. Proj. Manage.
, vol.20
, pp. 247-252
-
-
Shen, Q.P.1
Chung, K.H.2
-
46
-
-
13944274913
-
Critical success factors for value management studies in construction
-
Shen, Q. P., and Liu, G. W. (2003). " Critical success factors for value management studies in construction.. " J. Constr. Eng. Manage., 129 (5), 485-491.
-
(2003)
J. Constr. Eng. Manage.
, vol.129
, Issue.5
, pp. 485-491
-
-
Shen, Q.P.1
Liu, G.W.2
-
47
-
-
0002055683
-
The productivity paradox
-
Skinner, W. (1986). " The productivity paradox.. " Harvard Bus. Rev., 64, 55-59.
-
(1986)
Harvard Bus. Rev.
, vol.64
, pp. 55-59
-
-
Skinner, W.1
-
48
-
-
33845787364
-
-
Standards Australia and Standards New Zealand (AS/NZS). (Value management, AS/NZS 4183, Australia and New Zealand.
-
Standards Australia and Standards New Zealand (AS/NZS). (1994). Value management, AS/NZS 4183, Australia and New Zealand.
-
(1994)
-
-
-
49
-
-
0032166258
-
Partnering continuum
-
Thompson, P. J., and Sanders, S. R. (1998). " Partnering continuum.. " J. Manage. Eng., 14 (5), 73-78.
-
(1998)
J. Manage. Eng.
, vol.14
, Issue.5
, pp. 73-78
-
-
Thompson, P.J.1
Sanders, S.R.2
-
50
-
-
0037912278
-
Objectives and performance in construction projects
-
Ward, S. C., Curtis, B., and Chapman, C. B. (1991). " Objectives and performance in construction projects.. " Constr. Manage. Econom., 9, 343-353.
-
(1991)
Constr. Manage. Econom.
, vol.9
, pp. 343-353
-
-
Ward, S.C.1
Curtis, B.2
Chapman, C.B.3
-
51
-
-
0042121333
-
The project excellence model: Linking success criteria and critical success factors
-
Westerveld, E. (2003). " The project excellence model: Linking success criteria and critical success factors.. " Int. J. Proj. Manage., 21 (6), 411-418.
-
(2003)
Int. J. Proj. Manage.
, vol.21
, Issue.6
, pp. 411-418
-
-
Westerveld, E.1
-
52
-
-
0035479050
-
Benchmarking on-site productivity in France and the UK: A CALIBRE approach
-
Winch, G., and Carr, B. (2001). " Benchmarking on-site productivity in France and the UK: A CALIBRE approach.. " Constr. Manage. Econom., 19 (6), 577-590.
-
(2001)
Constr. Manage. Econom.
, vol.19
, Issue.6
, pp. 577-590
-
-
Winch, G.1
Carr, B.2
-
53
-
-
0036540430
-
Assessing contractor quality performance
-
Yamasis, F., Arditi, D., and Mohammadi, J. (2002). " Assessing contractor quality performance.. " Constr. Manage. Econom., 20 (3), 211-223.
-
(2002)
Constr. Manage. Econom.
, vol.20
, Issue.3
, pp. 211-223
-
-
Yamasis, F.1
Arditi, D.2
Mohammadi, J.3
|