Volumn 16, Issue 2, 2008, Pages 77-89

Using factor analysis to assess route construction priority for common duct network in Taiwan

Author keywords

Common duct; Pipelines; Route construction priority

Indexed keywords

OPERATIONS RESEARCH;

EID: 47549111718     PISSN: 10232796     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (7)

References (32)
  • 1
    • 47549098021 scopus 로고    scopus 로고
    • Challenges and solutions for selecting an optimal water main route
    • Chicago, pp
    • Amrou Atassi, A., Paul Shadrake, P., and Rago, L. "Challenges and solutions for selecting an optimal water main route," CDR of Pipelines 2006, Chicago, pp. 2-7 (2006).
    • (2006) CDR of Pipelines 2006 , pp. 2-7
    • Amrou Atassi, A.1    Paul Shadrake, P.2    Rago, L.3
  • 5
    • 24344459097 scopus 로고    scopus 로고
    • Some behavior patterns of contractors' supply chain payment conditions
    • Chen, H. L., and Chen, W. T., "Some behavior patterns of contractors' supply chain payment conditions," International Journal of Project Management, Vol. 23, pp. 463-473 (2005).
    • (2005) International Journal of Project Management , vol.23 , pp. 463-473
    • Chen, H.L.1    Chen, W.T.2
  • 6
    • 33846343749 scopus 로고    scopus 로고
    • April. 25, 2006 in Chinese
    • Common duct, http://pwb.tcg.gov.tw/31c.htm, April. 25, 2006 (in Chinese).
    • Common duct
  • 7
    • 0037117677 scopus 로고    scopus 로고
    • Assigning priorities for maintenance, repair and refurbishment in managing a municipal housing stock
    • Costa, C. A. B., Oliveira, R. C., "Assigning priorities for maintenance, repair and refurbishment in managing a municipal housing stock," European Journal of Operational Research, Vol. 138, pp. 380-391 (2002).
    • (2002) European Journal of Operational Research , vol.138 , pp. 380-391
    • Costa, C.A.B.1    Oliveira, R.C.2
  • 11
    • 0028972250 scopus 로고
    • Using a cost-to-benefit index (CBI) to set priorities for a city master plan drainage system
    • Hromadka, T. V., and Yen, C. C., "Using a cost-to-benefit index (CBI) to set priorities for a city master plan drainage system," Environmental Software, Vol. 10, No. 1, pp. 1-9 (1995).
    • (1995) Environmental Software , vol.10 , Issue.1 , pp. 1-9
    • Hromadka, T.V.1    Yen, C.C.2
  • 12
    • 47549113972 scopus 로고    scopus 로고
    • The analysis of cost-benefit and expenditure-shearing on constructing underground common tunnel
    • Taipei, pp
    • Hsu, Y. C., and Chen, C. H., "The analysis of cost-benefit and expenditure-shearing on constructing underground common tunnel," GIS and Common Duct Technology Conference, Taipei, pp. v1-v22 (2004).
    • (2004) GIS and Common Duct Technology Conference
    • Hsu, Y.C.1    Chen, C.H.2
  • 17
    • 17044381291 scopus 로고    scopus 로고
    • Global factors affecting margin-size of construction projects
    • Ling, F. Y. Y., "Global factors affecting margin-size of construction projects," Journal of Construction Research, Vol. 6, No. 1, pp. 91-106 (2005).
    • (2005) Journal of Construction Research , vol.6 , Issue.1 , pp. 91-106
    • Ling, F.Y.Y.1
  • 18
    • 47549119163 scopus 로고    scopus 로고
    • A study on the promotion of common utility ducts in Taiwan
    • Liou, F. S. "A study on the promotion of common utility ducts in Taiwan," Chung Hua Journal of Architecture, Vol. 1, No. 3, pp. 25-34 (2005).
    • (2005) Chung Hua Journal of Architecture , vol.1 , Issue.3 , pp. 25-34
    • Liou, F.S.1
  • 20
    • 28744442340 scopus 로고    scopus 로고
    • Geomorphologic mapping for route selection and road construction at lower Kihansi in Tanzania
    • Marwa, E. M. M. and Kimaro, D. N., "Geomorphologic mapping for route selection and road construction at lower Kihansi in Tanzania," Bulletin of Engineering Geology and the Environment, Vol. 64, No. 4, pp. 333-339 (2005).
    • (2005) Bulletin of Engineering Geology and the Environment , vol.64 , Issue.4 , pp. 333-339
    • Marwa, E.M.M.1    Kimaro, D.N.2
  • 22
    • 47549084158 scopus 로고    scopus 로고
    • A versatile route selection process
    • San Diego, California, pp
    • Ryan, P. K., "A versatile route selection process," Pipelines 2001, San Diego, California, pp. 62-70 (2001).
    • (2001) Pipelines 2001 , pp. 62-70
    • Ryan, P.K.1
  • 24
    • 13944274913 scopus 로고    scopus 로고
    • Critical success factors for value management studies in construction
    • Shen, Q. and Liu, G., "Critical success factors for value management studies in construction," Journal of Construction Engineering and Management, Vol. 129, No. 5, pp. 485-491 (2003).
    • (2003) Journal of Construction Engineering and Management , vol.129 , Issue.5 , pp. 485-491
    • Shen, Q.1    Liu, G.2
  • 27
    • 2642579411 scopus 로고    scopus 로고
    • Predicting accuracy of early cost estimate using factor analysis and multivariate regression
    • Trost, S. M. and Oberlender, G D. "Predicting accuracy of early cost estimate using factor analysis and multivariate regression," Journal Construction Engineering and Management, Vol. 129, No. 2, pp. 198-204 (2003).
    • (2003) Journal Construction Engineering and Management , vol.129 , Issue.2 , pp. 198-204
    • Trost, S.M.1    Oberlender, G.D.2
  • 28
    • 33748473444 scopus 로고    scopus 로고
    • Criterions and measures of route selection of shallowly embedded long-distance oil and gas pipeline in mountain areas
    • Wang, C., Ma, Q., Kong, J., Chen, Z., and Li, X., "Criterions and measures of route selection of shallowly embedded long-distance oil and gas pipeline in mountain areas," Wuhan University Journal of Natural Sciences, Vol. 11, Issue 4, pp. 787-792 (2006).
    • (2006) Wuhan University Journal of Natural Sciences , vol.11 , Issue.4 , pp. 787-792
    • Wang, C.1    Ma, Q.2    Kong, J.3    Chen, Z.4    Li, X.5


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.