메뉴 건너뛰기




Volumn 10, Issue , 2004, Pages 331-340

A real-time model for the robotic highway safety marker system

Author keywords

[No Author keywords available]

Indexed keywords

EARLIEST DEADLINE FIRST (EDF); RATE MONOTONIC (RM) PRIORITY; REAL-TIME MODELS; ROBOTIC HIGHWAY SAFETY MARKER SYSTEM;

EID: 7744230575     PISSN: None     EISSN: None     Source Type: Conference Proceeding    
DOI: None     Document Type: Conference Paper
Times cited : (10)

References (30)
  • 2
    • 0026173834 scopus 로고
    • The vector field histogram-fast obstacle avoidance for mobile robots
    • J. Borestein and Y. Koren, "The Vector Field Histogram-Fast Obstacle Avoidance for Mobile Robots," IEEE Trans. on Robotics and Automation, Vol.3, No.3, 1991.
    • (1991) IEEE Trans. on Robotics and Automation , vol.3 , Issue.3
    • Borestein, J.1    Koren, Y.2
  • 3
    • 0022688781 scopus 로고
    • A robust layered control system for a mobile robot
    • R. Brooks, "A Robust Layered Control System for a Mobile Robot," IEEE Trans. on Robotics and Automation, Vol.2, No.1, 1986.
    • (1986) IEEE Trans. on Robotics and Automation , vol.2 , Issue.1
    • Brooks, R.1
  • 5
    • 0015285440 scopus 로고
    • Use of the hough transformation to detect lines and curves in pictures
    • R. O. Duda and P. E. Hart, "Use of the Hough Transformation to Detect Lines and Curves in Pictures," In Communications of the ACM, pages 11-15, 1972.
    • (1972) Communications of the ACM , pp. 11-15
    • Duda, R.O.1    Hart, P.E.2
  • 8
    • 0035659186 scopus 로고    scopus 로고
    • Managing latency and buffer requirements in processing graph chains
    • S. Goddard and K. Jeffay, "Managing Latency and Buffer Requirements in Processing Graph Chains," The Computer Journal, 44-6:486-503, 2001.
    • (2001) The Computer Journal , vol.44 , Issue.6 , pp. 486-503
    • Goddard, S.1    Jeffay, K.2
  • 9
    • 7744243530 scopus 로고    scopus 로고
    • A variable rate execution model
    • (in submission to ECRTS'04), Department of Computer Science and Engineering, University of Nebraska - Lincoln, December
    • S. Goddard and X. Liu, "A Variable Rate Execution Model," Technical Report TR-UNL-CSE-2003-15 (in submission to ECRTS'04), Department of Computer Science and Engineering, University of Nebraska - Lincoln, December 2003.
    • (2003) Technical Report , vol.TR-UNL-CSE-2003-15
    • Goddard, S.1    Liu, X.2
  • 11
    • 0022674420 scopus 로고
    • Real-time obstacle avoidance for manipulators and mobile robots
    • O. Khatib, "Real-Time Obstacle Avoidance for Manipulators and Mobile Robots," Intl. Journal of Robotics Research, 5(1), 90-98,1986.
    • (1986) Intl. Journal of Robotics Research , vol.5 , Issue.1 , pp. 90-98
    • Khatib, O.1
  • 12
    • 0034230093 scopus 로고    scopus 로고
    • Sensor-based path planning and motion control for a robotic system for roadway crack sealing
    • T. Lasky and B. Ravani, "Sensor-based Path Planning and Motion Control for a Robotic System for Roadway Crack Sealing," IEEE Trans. on Control Systems Tech., Vol. 8, No.4, pp.609-622, 2000.
    • (2000) IEEE Trans. on Control Systems Tech. , vol.8 , Issue.4 , pp. 609-622
    • Lasky, T.1    Ravani, B.2
  • 14
    • 0024915921 scopus 로고
    • The rate-monotonic scheduling algorithm: Exact characterization and average case behavior
    • Decemember
    • J. P. Lehoczky, L. Sha, and Y.Ding, "The Rate-Monotonic Scheduling algorithm: Exact Characterization and Average Case Behavior," Proceedings of Real-Time Systems Symposium, Decemember 1989, pp.166-171.
    • (1989) Proceedings of Real-time Systems Symposium , pp. 166-171
    • Lehoczky, J.P.1    Sha, L.2    Ding, Y.3
  • 15
    • 0020271514 scopus 로고
    • On the complexity of fixed-priority scheduling of periodic, real-time tasks
    • J.Y.T. Leung and J.Whitehead, "On the Complexity of Fixed-Priority Scheduling of Periodic, Real-Time Tasks," In Performance Evaluation, 1982.
    • (1982) Performance Evaluation
    • Leung, J.Y.T.1    Whitehead, J.2
  • 18
    • 5644293201 scopus 로고    scopus 로고
    • A loadable variable rate execution scheduler
    • Valencia, Spain, November
    • X. Liu and S. Goddard, "A Loadable Variable Rate Execution Scheduler," Proceedings of the Real-Time Linux Workshop, Valencia, Spain, November 2003, pp. 187-196.
    • (2003) Proceedings of the Real-time Linux Workshop , pp. 187-196
    • Liu, X.1    Goddard, S.2
  • 20
    • 84974687699 scopus 로고
    • Scheduling algorithms for multiprogramming in a hard-real-time environment
    • C. L. Liu and J. W. Layland, "Scheduling Algorithms for Multiprogramming in a Hard-Real-Time Environment," Journal of the ACM (JACM), 20(1):46-61, 1973.
    • (1973) Journal of the ACM (JACM) , vol.20 , Issue.1 , pp. 46-61
    • Liu, C.L.1    Layland, J.W.2
  • 25
    • 7744239185 scopus 로고    scopus 로고
    • M.S. thesis, Computer Science and Engineering, University of Nebraska-Lincoln
    • X. Shen, "Control of robotic highway safety markers," M.S. thesis, Computer Science and Engineering, University of Nebraska-Lincoln, 2003.
    • (2003) Control of Robotic Highway Safety Markers
    • Shen, X.1
  • 28
    • 0242672657 scopus 로고
    • Advanced highway maintenance and construction technology applications
    • T. H. West, S. A. Velinsky, and B. Ravani, "Advanced Highway Maintenance and Construction Technology Applications," TR news, pp. 17-23, 1995.
    • (1995) TR News , pp. 17-23
    • West, T.H.1    Velinsky, S.A.2    Ravani, B.3
  • 29
    • 0242672655 scopus 로고
    • Evolving automation in the asphalt paving industry
    • T. White, "Evolving Automation in the Asphalt Paving Industry, " TR news, No. 176, pp.4-6, 1995.
    • (1995) TR News , Issue.176 , pp. 4-6
    • White, T.1
  • 30
    • 0029632049 scopus 로고
    • Robotics in highway construction
    • D. Woo, "Robotics in Highway Construction," Public Roads, Vol.58, No.3, pp.26-30, 1995.
    • (1995) Public Roads , vol.58 , Issue.3 , pp. 26-30
    • Woo, D.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.