-
1
-
-
34548232857
-
Bechtold-Jacobs generalized model for shift scheduling with extraordinary overlap
-
10.1007/s10479-007-0222-0
-
I. Addou F. Soumis 2007 Bechtold-Jacobs generalized model for shift scheduling with extraordinary overlap Annals of Operations Research 155 1 177 205 10.1007/s10479-007-0222-0
-
(2007)
Annals of Operations Research
, vol.155
, Issue.1
, pp. 177-205
-
-
Addou, I.1
Soumis, F.2
-
2
-
-
0030125115
-
Optimal shift scheduling with multiple break windows
-
10.1287/mnsc.42.4.591
-
T. Aykin 1996 Optimal shift scheduling with multiple break windows Management Science 42 591 602 10.1287/mnsc.42.4.591
-
(1996)
Management Science
, vol.42
, pp. 591-602
-
-
Aykin, T.1
-
3
-
-
0032096643
-
A composite branch and cut algorithm for optimal shift scheduling with multiple breaks and break windows
-
10.1057/palgrave.jors.2600472
-
T. Aykin 1998 A composite branch and cut algorithm for optimal shift scheduling with multiple breaks and break windows Journal of the Operational Research Society 49 603 615 10.1057/palgrave.jors.2600472
-
(1998)
Journal of the Operational Research Society
, vol.49
, pp. 603-615
-
-
Aykin, T.1
-
4
-
-
0033717636
-
Comparative evaluation of modeling approaches to the labor shift scheduling problem
-
DOI 10.1016/S0377-2217(99)00413-0
-
T. Aykin 2000 A comparative evaluation of modeling approaches to the labor shift scheduling problem European Journal of Operational Research 125 381 397 10.1016/S0377-2217(99)00413-0 (Pubitemid 30890454)
-
(2000)
European Journal of Operational Research
, vol.125
, Issue.2
, pp. 381-397
-
-
Aykin, T.1
-
5
-
-
0021694201
-
Integrated days off and shift personnel scheduling
-
10.1016/0360-8352(85)90027-0
-
J. Bailey 1985 Integrated days off and shift personnel scheduling Computers and Industrial Engineering 9 395 404 10.1016/0360-8352(85)90027-0
-
(1985)
Computers and Industrial Engineering
, vol.9
, pp. 395-404
-
-
Bailey, J.1
-
6
-
-
0010767738
-
Personnel scheduling with flexshift models
-
10.1016/0272-6963(85)90017-8
-
J. Bailey J. Fields 1985 Personnel scheduling with flexshift models Journal of Operations Management 5 327 338 10.1016/0272-6963(85)90017-8
-
(1985)
Journal of Operations Management
, vol.5
, pp. 327-338
-
-
Bailey, J.1
Fields, J.2
-
7
-
-
84896876201
-
Workforce allocation in cyclic scheduling problems: A survey
-
10.1057/jors.1976.30
-
K. R. Baker 1976 Workforce allocation in cyclic scheduling problems: A survey Operational Research Quarterly 27 155 10.1057/jors.1976.30
-
(1976)
Operational Research Quarterly
, vol.27
, pp. 155
-
-
Baker, K.R.1
-
8
-
-
0037395795
-
Staff scheduling at the United States Postal Service
-
DOI 10.1016/S0305-0548(02)00048-5, PII S0305054802000485
-
J. F. Bard C. Binici A. H. deSilva 2003 Staff scheduling at the United States Postal Service Computers & Operations Research 30 745 771 10.1016/S0305-0548(02)00048-5 (Pubitemid 36175282)
-
(2003)
Computers and Operations Research
, vol.30
, Issue.5
, pp. 745-771
-
-
Bard, J.F.1
Binici, C.2
De Silva, A.H.3
-
9
-
-
0019562318
-
A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering
-
10.1287/opre.29.3.501
-
J. J. Bartholdi 1981 A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering Operations Research 29 501 510 10.1287/opre.29.3. 501
-
(1981)
Operations Research
, vol.29
, pp. 501-510
-
-
Bartholdi, J.J.1
-
10
-
-
0000309722
-
Implicit modeling of flexible break assignments in optimal shift scheduling
-
10.1287/mnsc.36.11.1339
-
S. E. Bechtold L. W. Jacobs 1990 Implicit modeling of flexible break assignments in optimal shift scheduling Management Science 36 1339 1351 10.1287/mnsc.36.11.1339
-
(1990)
Management Science
, vol.36
, pp. 1339-1351
-
-
Bechtold, S.E.1
Jacobs, L.W.2
-
11
-
-
84990587419
-
Labor utilization effects of labor scheduling flexibility alternatives in a tour scheduling environment
-
10.1111/j.1540-5915.1993.tb00467.x
-
S. E. Bechtold L. W. Jacobs 1993 Labor utilization effects of labor scheduling flexibility alternatives in a tour scheduling environment Decision Sciences 24 148 166 10.1111/j.1540-5915.1993.tb00467.x
-
(1993)
Decision Sciences
, vol.24
, pp. 148-166
-
-
Bechtold, S.E.1
Jacobs, L.W.2
-
12
-
-
4243163526
-
The equivalence of general set-covering and implicit integer programming formulations for shift scheduling
-
10.1002/(SICI)1520-6750(199603)43:2<233::AID-NAV5>3.0.CO;2-B
-
S. E. Bechtold L. W. Jacobs 1996 The equivalence of general set-covering and implicit integer programming formulations for shift scheduling Naval Research Logistics 43 233 249 10.1002/(SICI)1520-6750(199603)43:2<233::AID- NAV5>3.0.CO;2-B
-
(1996)
Naval Research Logistics
, vol.43
, pp. 233-249
-
-
Bechtold, S.E.1
Jacobs, L.W.2
-
13
-
-
0029471493
-
Cost analysis of alternative formulations for personnel scheduling in continuously operating organisations
-
10.1016/0377-2217(94)00063-I
-
M. J. Brusco L. W. Jacobs 1995 Cost analysis of alternative formulations for personnel scheduling in continuously operating organisations European Journal of Operational Research 86 249 261 10.1016/0377-2217(94)00063-I
-
(1995)
European Journal of Operational Research
, vol.86
, pp. 249-261
-
-
Brusco, M.J.1
Jacobs, L.W.2
-
14
-
-
0034479946
-
Optimal models for meal-break and start-time flexibility in continuous tour scheduling
-
10.1287/mnsc.46.12.1630.12074
-
M. J. Brusco L. W. Jacobs 2000 Optimal models for meal-break and start-time flexibility in continuous tour scheduling Management Science 46 1630 1641 10.1287/mnsc.46.12.1630.12074
-
(2000)
Management Science
, vol.46
, pp. 1630-1641
-
-
Brusco, M.J.1
Jacobs, L.W.2
-
15
-
-
1642343388
-
Reformulating linear programs with transportation constraints with applications to workforce scheduling
-
10.1002/nav.10115
-
T. Çezik O. Günlük 2004 Reformulating linear programs with transportation constraints with applications to workforce scheduling Naval Research Logistics 51 275 296 10.1002/nav.10115
-
(2004)
Naval Research Logistics
, vol.51
, pp. 275-296
-
-
Çezik, T.1
Günlük, O.2
-
16
-
-
0000722156
-
A comment on Edie's traffic delays at toll booths
-
10.1287/opre.2.3.339
-
G. B. Dantzig 1954 A comment on Edie's traffic delays at toll booths Operations Research 2 339 341 10.1287/opre.2.3.339
-
(1954)
Operations Research
, vol.2
, pp. 339-341
-
-
Dantzig, G.B.1
-
17
-
-
77950506171
-
Public transit
-
G. Laporte C. Barnhart (eds). Elsevier Amsterdam
-
Desaulniers, G., & Hickman, M. (2007). Public transit. In G. Laporte & C. Barnhart (Eds.), Handbooks in operations research and management science, transportation (Vol. 14, pp. 69-127). Amsterdam: Elsevier.
-
(2007)
Handbooks in Operations Research and Management Science, Transportation
, vol.14
, pp. 69-127
-
-
Desaulniers, G.1
Hickman, M.2
-
18
-
-
0002267839
-
Telephone sales manpower planning at Quantas
-
10.1287/inte.9.3.1
-
A. Gaballa W. Pearce 1979 Telephone sales manpower planning at Quantas Interfaces 9 1 9 10.1287/inte.9.3.1
-
(1979)
Interfaces
, vol.9
, pp. 1-9
-
-
Gaballa, A.1
Pearce, W.2
-
19
-
-
0016985083
-
Heuristic methods for telephone operator shift scheduling: An experimental analysis
-
10.1287/mnsc.22.12.1372
-
W. B. Henderson W. L. Berry 1976 Heuristic methods for telephone operator shift scheduling: an experimental analysis Management Science 22 1372 1380 10.1287/mnsc.22.12.1372
-
(1976)
Management Science
, vol.22
, pp. 1372-1380
-
-
Henderson, W.B.1
Berry, W.L.2
-
20
-
-
0018444711
-
Operator scheduling
-
E. G. Keith 1979 Operator scheduling AIIE Transactions 11 37 41
-
(1979)
AIIE Transactions
, vol.11
, pp. 37-41
-
-
Keith, E.G.1
-
21
-
-
0003391424
-
An L.P. model for workforce scheduling in banks
-
S. L. Moondra 1976 An L.P. model for workforce scheduling in banks Journal of Bank Research 6 299 301
-
(1976)
Journal of Bank Research
, vol.6
, pp. 299-301
-
-
Moondra, S.L.1
-
22
-
-
4043162915
-
Using Benders decomposition to implicitly model tour scheduling
-
10.1023/B:ANOR.0000019101.29692.2c
-
M. Rekik J.-F. Cordeau F. Soumis 2004 Using Benders decomposition to implicitly model tour scheduling Annals of Operations Research 128 111 133 10.1023/B:ANOR.0000019101.29692.2c
-
(2004)
Annals of Operations Research
, vol.128
, pp. 111-133
-
-
Rekik, M.1
Cordeau, J.-F.2
Soumis, F.3
-
23
-
-
44349133920
-
Solution approaches to large shift scheduling problems
-
DOI 10.1051/ro:2008006
-
M. Rekik J.-F. Cordeau F. Soumis 2008 Solution approaches to large shift scheduling problems RAIRO Operations Research 42 229 258 10.1051/ro:2008006 (Pubitemid 351730104)
-
(2008)
RAIRO - Operations Research
, vol.42
, Issue.2
, pp. 229-258
-
-
Rekik, M.1
Cordeau, J.-F.2
Soumis, F.3
-
24
-
-
0016079835
-
The operator scheduling problem: A network flow approach
-
10.1287/opre.22.4.808
-
M. Segal 1974 The operator scheduling problem: a network flow approach Operations Research 22 808 824 10.1287/opre.22.4.808
-
(1974)
Operations Research
, vol.22
, pp. 808-824
-
-
Segal, M.1
-
25
-
-
0003332325
-
Improved implicit optimal modeling of the labor shift scheduling problem
-
10.1287/mnsc.41.4.595
-
G. M. Thompson 1995 Improved implicit optimal modeling of the labor shift scheduling problem Management Science 41 595 607 10.1287/mnsc.41.4.595
-
(1995)
Management Science
, vol.41
, pp. 595-607
-
-
Thompson, G.M.1
|