-
1
-
-
0343134640
-
A composite branch and cut algorithm for optimal shift scheduling with multiple breaks and break windows
-
Aykin T. A composite branch and cut algorithm for optimal shift scheduling with multiple breaks and break windows. Journal of the Operations Research Society. 48:1998;1-13.
-
(1998)
Journal of the Operations Research Society
, vol.48
, pp. 1-13
-
-
Aykin, T.1
-
2
-
-
0030125115
-
Optimal shift scheduling with multiple break windows
-
Aykin T. Optimal shift scheduling with multiple break windows. Management Science. 42:1996;591-603.
-
(1996)
Management Science
, vol.42
, pp. 591-603
-
-
Aykin, T.1
-
3
-
-
85031563409
-
A generalized implicit modeling approach for the shift and tour scheduling problems
-
Graduate School of Management, Rutgers University, Newark, NJ
-
Aykin, T., 1995a. A generalized implicit modeling approach for the shift and tour scheduling problems. GSM Working Paper #95-29, Graduate School of Management, Rutgers University, Newark, NJ.
-
(1995)
GSM Working Paper #95-29
-
-
Aykin, T.1
-
4
-
-
0343570625
-
Reformulating the tour scheduling problem to improve solvability
-
Graduate School of Management, Rutgers University, Newark, NJ
-
Aykin, T., 1995b. Reformulating the tour scheduling problem to improve solvability. GSM Working Paper #95-35, Graduate School of Management, Rutgers University, Newark, NJ.
-
(1995)
GSM Working Paper #95-35
-
-
Aykin, T.1
-
5
-
-
84896876201
-
Workforce allocation in cyclical scheduling problems: A survey
-
Baker K. Workforce allocation in cyclical scheduling problems: A survey. Operational Research Q. 27:1976;155-167.
-
(1976)
Operational Research Q
, vol.27
, pp. 155-167
-
-
Baker, K.1
-
6
-
-
0019562318
-
A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering
-
Bartoldi J.J. A guaranteed-accuracy round-off algorithm for cyclic scheduling and set covering. Operations Research. 29:1981;501-510.
-
(1981)
Operations Research
, vol.29
, pp. 501-510
-
-
Bartoldi, J.J.1
-
7
-
-
0019059991
-
Cyclic scheduling via integer programs with circular ones
-
Bartoldi J.J., Orlin J.B., Ratliff H.D. Cyclic scheduling via integer programs with circular ones. Operations Research. 29:1980;1074-1085.
-
(1980)
Operations Research
, vol.29
, pp. 1074-1085
-
-
Bartoldi, J.J.1
Orlin, J.B.2
Ratliff, H.D.3
-
8
-
-
0000309722
-
Implicit modeling of flexible break assignments in optimal shift scheduling
-
Bechtold S.E., Jacobs L.W. Implicit modeling of flexible break assignments in optimal shift scheduling. Management Science. 36(11):1990;1339-1351.
-
(1990)
Management Science
, vol.36
, Issue.11
, pp. 1339-1351
-
-
Bechtold, S.E.1
Jacobs, L.W.2
-
9
-
-
0004193076
-
-
Wiley, New York
-
Bedworth, D.D., Bailey, J.E., 1987. Integrated Production Control Systems, second ed. Wiley, New York.
-
(1987)
Integrated Production Control Systems, Second Ed.
-
-
Bedworth, D.D.1
Bailey, J.E.2
-
11
-
-
0000722156
-
A comment on Edie's "traffic delays at toll booths"
-
Dantzig G.B. A comment on Edie's "Traffic delays at toll booths" Operations Research. 2(3):1954;339-341.
-
(1954)
Operations Research
, vol.2
, Issue.3
, pp. 339-341
-
-
Dantzig, G.B.1
-
12
-
-
0000722157
-
Traffic delays at toll booths
-
Edie L.C. Traffic delays at toll booths. Operations Research. 2(2):1954;107-138.
-
(1954)
Operations Research
, vol.2
, Issue.2
, pp. 107-138
-
-
Edie, L.C.1
-
13
-
-
0002267839
-
Telephone sales manpower planning at Qantas
-
Gaballa A., Pearce W. Telephone sales manpower planning at Qantas. Interfaces. 9(3):1979;1-9.
-
(1979)
Interfaces
, vol.9
, Issue.3
, pp. 1-9
-
-
Gaballa, A.1
Pearce, W.2
-
14
-
-
0016985083
-
Heuristic methods for telephone operator shift scheduling: An experimental analysis
-
Henderson W.B., Berry W.L. Heuristic methods for telephone operator shift scheduling: An experimental analysis. Management Science. 22(12):1976;1372-1380.
-
(1976)
Management Science
, vol.22
, Issue.12
, pp. 1372-1380
-
-
Henderson, W.B.1
Berry, W.L.2
-
16
-
-
0040820263
-
Management science improves fast-food operations
-
Love R.R., Hoey J. Management science improves fast-food operations. Interfaces. 20:1990;21-29.
-
(1990)
Interfaces
, vol.20
, pp. 21-29
-
-
Love, R.R.1
Hoey, J.2
-
17
-
-
0003391424
-
An L.P model for work force scheduling for Banks
-
Moondra S.L. An L.P model for work force scheduling for Banks. Journal of Bank Research. 6:1976;299-301.
-
(1976)
Journal of Bank Research
, vol.6
, pp. 299-301
-
-
Moondra, S.L.1
-
19
-
-
0016079835
-
The operator-scheduling problem: A network flow approach
-
Segal M. The operator-scheduling problem: A network flow approach. Operations Research. 22:1974;808-823.
-
(1974)
Operations Research
, vol.22
, pp. 808-823
-
-
Segal, M.1
-
20
-
-
0342700336
-
A decision support system for workforce management
-
Spencer III, T., Brigandi, T., Barlow, G., Gomez, R., 1992. A decision support system for workforce management. Modelling and Simulation 23 (5).
-
(1992)
Modelling and Simulation
, vol.23
, Issue.5
-
-
Spencer, T.1
III Brigandi, T.2
Barlow, G.3
Gomez, R.4
-
21
-
-
0003332325
-
Improved implicit optimal modeling of the labor shift scheduling problem
-
Thompson G.M. Improved implicit optimal modeling of the labor shift scheduling problem. Management Science. 41:1995;595-607.
-
(1995)
Management Science
, vol.41
, pp. 595-607
-
-
Thompson, G.M.1
-
22
-
-
84974872765
-
A quick heuristic for some cyclic staffing problems with breaks
-
Vohra R.V. A quick heuristic for some cyclic staffing problems with breaks. Journal of the Operational Research Society. 39:1988;1057-1061.
-
(1988)
Journal of the Operational Research Society
, vol.39
, pp. 1057-1061
-
-
Vohra, R.V.1
|