메뉴 건너뛰기




Volumn 23, Issue 2, 2010, Pages 146-154

Optimal resource allocation for hybrid flow shop in one-of-a-kind production

Author keywords

Branch and bound; Hybrid flow shop; One of a kind production (OKP); Resource allocation

Indexed keywords

BRANCH AND BOUND METHOD; MACHINE SHOP PRACTICE;

EID: 76249111613     PISSN: 0951192X     EISSN: 13623052     Source Type: Journal    
DOI: 10.1080/09511920903440339     Document Type: Article
Times cited : (19)

References (23)
  • 1
    • 0027634134 scopus 로고
    • BPSS: Scheduling support system for the packaging industry
    • Adler, L., et al., 1993. BPSS: Scheduling support system for the packaging industry. Operations Research, 41, 641-648.
    • (1993) Operations Research , vol.41 , pp. 641-648
    • Adler, L.1
  • 3
    • 70449567536 scopus 로고    scopus 로고
    • Minimising the weighted number of tardy jobs in a hybrid flow shop with genetic algorithm
    • Desprez, C., Chu, F., and Chu, C., 2009. Minimising the weighted number of tardy jobs in a hybrid flow shop with genetic algorithm. International Journal of Computer Integrated Manufacturing, 22, 745-757.
    • (2009) International Journal of Computer Integrated Manufacturing , vol.22 , pp. 745-757
    • Desprez, C.1    Chu, F.2    Chu, C.3
  • 4
    • 0030149222 scopus 로고    scopus 로고
    • A computational study of heuristics for two-stage flexible flow shops
    • Guinet, A., et al., 1996. A computational study of heuristics for two-stage flexible flowshops. International Journal of Production Research, 34, 1399-1415.
    • (1996) International Journal of Production Research , vol.34 , pp. 1399-1415
    • Guinet, A.1
  • 6
    • 0026190509 scopus 로고
    • Schedules for a two stage hybrid flow shop with parallel machines at the second stage
    • Gupta, J.N.D. and Tunc, E.A., 1991. Schedules for a twostage hybrid flowshop with parallel machines at the second stage. International Journal of Production Research, 29, 1489-1502.
    • (1991) International Journal of Production Research , vol.29 , pp. 1489-1502
    • Gupta, J.N.D.1    Tunc, E.A.2
  • 7
    • 33745220037 scopus 로고    scopus 로고
    • Flexible flow shop scheduling-optimum, heuristics and artificial intelligence solutions
    • Hong, W., 2005. Flexible flow shop scheduling- optimum, heuristics and artificial intelligence solutions. Expert Systems, 22, 78-85.
    • (2005) Expert Systems , vol.22 , pp. 78-85
    • Hong, W.1
  • 8
    • 0035545748 scopus 로고    scopus 로고
    • Colored Petri Nets with changeable structures (CPN-CS) and their applications in modeling one-of-a-kind production (OKP) systems
    • Jiang, Z., et al., 2001. Colored Petri Nets with changeable structures (CPN-CS) and their applications in modeling one-of-a-kind production (OKP) systems. Computers and Industrial Engineering, 41, 279-308.
    • (2001) Computers and Industrial Engineering , vol.41 , pp. 279-308
    • Jiang, Z.1
  • 10
    • 12244249206 scopus 로고    scopus 로고
    • A review of exact solution methods for the non-preemptive multiprocessor flow shop problem
    • Tamá s, K. and Erwin, P., 2005. A review of exact solution methods for the non-preemptive multiprocessor flowshop problem. European Journal of Operational Research, 164, 592-608.
    • (2005) European Journal of Operational Research , vol.164 , pp. 592-608
    • Tamás, K.1    Erwin, P.2
  • 14
    • 0035501877 scopus 로고    scopus 로고
    • Sequencing three stage flexible flow-shops with identical machines to minimize make span
    • Soewandi, H. and Elmaghraby, S.E., 2001. Sequencing threestage flexible flow-shops with identical machines to minimize makespan. IIE Transactions, 33, 985-993.
    • (2001) IIE Transactions , vol.33 , pp. 985-993
    • Soewandi, H.1    Elmaghraby, S.E.2
  • 15
    • 0040311825 scopus 로고
    • A production scheduling system for a hybrid flow shop-a case study
    • Tsubone, H., et al., 1993. A production scheduling system for a hybrid flow shop-a case study. Omega, 21, 205-214.
    • (1993) Omega , vol.21 , pp. 205-214
    • Tsubone, H.1
  • 17
    • 21544471551 scopus 로고    scopus 로고
    • Automatic determination of operation sequence for material handling and equipment set-up in one-of-a-kind production
    • Tu, Y.L. and Holm, H., 1997. Automatic determination of operation sequence for material handling and equipment set-up in one-of-a-kind production. International Journal of Computer Integrated Manufacturing, 10, 435-445. (Pubitemid 127700124)
    • (1997) International Journal of Computer Integrated Manufacturing , vol.10 , Issue.6 , pp. 435-445
    • Tu, Y.1    Holm, H.2
  • 18
    • 0031365006 scopus 로고    scopus 로고
    • Production planning and control in a virtual OKP company
    • Tu, Y.L., 1997a. Production planning and control in a virtual OKP company. Computers in Industry, 34, 271-283.
    • (1997) Computers in Industry , vol.34 , pp. 271-283
    • Tu, Y.L.1
  • 19
    • 0031259539 scopus 로고    scopus 로고
    • Real-time scheduling and control of one-ofa-kind production
    • Tu, Y.L., 1997b. Real-time scheduling and control of one-ofa-kind production. Production Planning and Control, 8, 701-710.
    • (1997) Production Planning and Control , vol.8 , pp. 701-710
    • Tu, Y.L.1
  • 20
    • 0033906893 scopus 로고    scopus 로고
    • Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness
    • Valerie, B.G., 2000. Hybrid flow shop scheduling with precedence constraints and time lags to minimize maximum lateness. International Journal of Production Economics, 64, 101-111.
    • (2000) International Journal of Production Economics , vol.64 , pp. 101-111
    • Valerie, B.G.1
  • 22
    • 27844498823 scopus 로고    scopus 로고
    • A reconfigurable platform in support of one-of-a-kind product development
    • Xie, S.Q., Xu, X., and Tu, Y.L., 2005. A reconfigurable platform in support of one-of-a-kind product development. International Journal of Production Research, 43, 1889-1910.
    • (2005) International Journal of Production Research , vol.43 , pp. 1889-1910
    • Xie, S.Q.1    Xu, X.2    Tu, Y.L.3
  • 23
    • 0024748810 scopus 로고
    • A practical approach to scheduling a multistage, multiprocessor flow-shop problem
    • Yanney, J.D. and Kuo, W., 1989. A practical approach to scheduling a multistage, multiprocessor flow-shop problem. International Journal of Production Research, 27, 1733-1742.
    • (1989) International Journal of Production Research , vol.27 , pp. 1733-1742
    • Yanney, J.D.1    Kuo, W.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.