메뉴 건너뛰기




Volumn 41, Issue 6, 2009, Pages 511-523

Production control with backlog-dependent demand

Author keywords

Backlog dependent demand; Customer defection; Hedging point policy; Inventory control; Manufacturing systems analysis; Optimal flow control; Production control; Production systems; Stochastic control

Indexed keywords

CUSTOMER DEFECTION; CUSTOMER DEFECTIONS; HEDGING POINT; MANUFACTURING SYSTEM; MANUFACTURING SYSTEMS ANALYSIS; OPTIMAL FLOW CONTROL; PRODUCTION SYSTEM; STOCHASTIC CONTROL;

EID: 74849132554     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170801975040     Document Type: Article
Times cited : (23)

References (26)
  • 2
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • Bielecki, T. and Kumar, P.R. (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 36(4), 532-541.
    • (1988) Operations Research , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 4
    • 0001903449 scopus 로고    scopus 로고
    • How tolerable is delay? Consumers' evaluations of internet web sites after waiting
    • Dellaert, B.G.C. and Kahn, B.E. (1999) How tolerable is delay? Consumers' evaluations of internet web sites after waiting. Journal of Interactive Marketing, 13(1), 41-54.
    • (1999) Journal of Interactive Marketing , vol.13 , Issue.1 , pp. 41-54
    • Dellaert, B.G.C.1    Kahn, B.E.2
  • 6
    • 0023455979 scopus 로고
    • An optimal stochastic production planning with randomly fluctuating demand
    • Fleming, W.H., Sethi, S.P. and Soner, H.M. (1987) An optimal stochastic production planning with randomly fluctuating demand. SIAM Journal of Control Optimization, 25, 1495-1502.
    • (1987) SIAM Journal of Control Optimization , vol.25 , pp. 1495-1502
    • Fleming, W.H.1    Sethi, S.P.2    Soner, H.M.3
  • 7
    • 0027656154 scopus 로고
    • Optimal control of switching diffusions with applications to flexible manufacturing systems
    • Ghosh, M.K., Araposthathis, A. and Markus, S.I. (1993) Optimal control of switching diffusions with applications to flexible manufacturing systems. SIAM Journal of Control Optimization, 31, 1183-1204.
    • (1993) SIAM Journal of Control Optimization , vol.31 , pp. 1183-1204
    • Ghosh, M.K.1    Araposthathis, A.2    Markus, S.I.3
  • 10
    • 0029252650 scopus 로고
    • Production rate control for failure prone production with no backlog permitted
    • Hu, J. (1995) Production rate control for failure prone production with no backlog permitted. IEEE Transactions on Automatic Control, 40(2), 291-295.
    • (1995) IEEE Transactions on Automatic Control , vol.40 , Issue.2 , pp. 291-295
    • Hu, J.1
  • 11
    • 0020915621 scopus 로고
    • An algorithm for the computer control of production in a flexible manufacturing systems
    • Kimemia, J.G. and Gershwin, S.B. (1983) An algorithm for the computer control of production in a flexible manufacturing systems. IIE Transactions, 15(4), 353-362.
    • (1983) IIE Transactions , vol.15 , Issue.4 , pp. 353-362
    • Kimemia, J.G.1    Gershwin, S.B.2
  • 12
    • 8344284764 scopus 로고    scopus 로고
    • The impact of customers' patience on delay and abandonment: Some empirically-driven experiments with the M/M/N+G queue
    • Mandelbaum, A. and Zeltyn, S. (2004) The impact of customers' patience on delay and abandonment: some empirically-driven experiments with the M/M/N+G queue. OR Spectrum, 26, 377-411.
    • (2004) OR Spectrum , vol.26 , pp. 377-411
    • Mandelbaum, A.1    Zeltyn, S.2
  • 13
    • 0345910613 scopus 로고    scopus 로고
    • Rationing by waiting lists: An empirical investigation
    • Martin, S. and Smith, P.C. (1999) Rationing by waiting lists: an empirical investigation. Journal of Public Economics, 71(1), 141-164.
    • (1999) Journal of Public Economics , vol.71 , Issue.1 , pp. 141-164
    • Martin, S.1    Smith, P.C.2
  • 14
    • 7244248999 scopus 로고    scopus 로고
    • Hedging point policies remain optimal under limited backlog and inventory space
    • Martinelli, F. and Valigi, P. (2004) Hedging point policies remain optimal under limited backlog and inventory space. IEEE Transactions on Automatic Control, 49(10), 1863-1871.
    • (2004) IEEE Transactions on Automatic Control , vol.49 , Issue.10 , pp. 1863-1871
    • Martinelli, F.1    Valigi, P.2
  • 15
    • 0019240915 scopus 로고
    • Time-optimal control of flexible manufacturing systems with failure prone machines
    • IEEE, Piscataway, NJ, pp
    • Olsder, G.J. and Suri, R. (1980) Time-optimal control of flexible manufacturing systems with failure prone machines, in Proceedings of the 19th IEEE Conference on Decision and Control, IEEE, Piscataway, NJ, pp. 722-727.
    • (1980) Proceedings of the 19th IEEE Conference on Decision and Control , pp. 722-727
    • Olsder, G.J.1    Suri, R.2
  • 16
    • 0035279831 scopus 로고    scopus 로고
    • Failure-prone production systems with uncertain demand
    • Perkins, J. and Srikant, R. (2001) Failure-prone production systems with uncertain demand. IEEE Transactions on Automatic Control, 46(3), 441-449.
    • (2001) IEEE Transactions on Automatic Control , vol.46 , Issue.3 , pp. 441-449
    • Perkins, J.1    Srikant, R.2
  • 18
    • 0016470159 scopus 로고
    • Dynamic programming and minimum principles for systems with jump Markov disturbances
    • Rishel, R. (1975) Dynamic programming and minimum principles for systems with jump Markov disturbances. SIAM Journal on Control, 13(2), 338-371.
    • (1975) SIAM Journal on Control , vol.13 , Issue.2 , pp. 338-371
    • Rishel, R.1
  • 19
    • 0031538949 scopus 로고    scopus 로고
    • Optimal production planning in a stochastic manufacturing system with long-run average cost
    • Sethi, S., Suo, W., Taksar, M. and Zhang, Q. (1997) Optimal production planning in a stochastic manufacturing system with long-run average cost. Journal of Optimization Theory and Applications, 92, 161-188.
    • (1997) Journal of Optimization Theory and Applications , vol.92 , pp. 161-188
    • Sethi, S.1    Suo, W.2    Taksar, M.3    Zhang, Q.4
  • 20
    • 0031220337 scopus 로고    scopus 로고
    • Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures
    • Tan, B. (1997) Variance of the throughput of an N-station production line with no intermediate buffers and time dependent failures. European Journal of Operational Research, 101(3), 560-576.
    • (1997) European Journal of Operational Research , vol.101 , Issue.3 , pp. 560-576
    • Tan, B.1
  • 21
    • 0036576750 scopus 로고    scopus 로고
    • Production control of a pull system with production and demand uncertainty
    • Tan, B. (2002) Production control of a pull system with production and demand uncertainty. IEEE Transactions on Automatic Control, 47(5), 779-783.
    • (2002) IEEE Transactions on Automatic Control , vol.47 , Issue.5 , pp. 779-783
    • Tan, B.1
  • 22
    • 74849099498 scopus 로고    scopus 로고
    • Tan, B. and Gershwin, S.B. (2001) On production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Working Paper Series ORC 354-01, Massachusetts Institute of Technology, Operations Research Center, MIT, Cambridge, MA.
    • Tan, B. and Gershwin, S.B. (2001) On production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Working Paper Series ORC 354-01, Massachusetts Institute of Technology, Operations Research Center, MIT, Cambridge, MA.
  • 23
    • 0037681173 scopus 로고
    • Waiting for service: The relationship between delays and evaluations of service
    • Taylor, S. (1994) Waiting for service: the relationship between delays and evaluations of service. Journal of Marketing, 58(2), 56-69.
    • (1994) Journal of Marketing , vol.58 , Issue.2 , pp. 56-69
    • Taylor, S.1
  • 24
    • 56749158995 scopus 로고    scopus 로고
    • The impact of customer impatience on production control
    • Veatch, M. (2009) The impact of customer impatience on production control. IIE Transactions, 41(2), 95-102.
    • (2009) IIE Transactions , vol.41 , Issue.2 , pp. 95-102
    • Veatch, M.1
  • 25
    • 0038760508 scopus 로고    scopus 로고
    • Don't keep your internet customers waiting too long at the (virtual) front door
    • Weinberg, B.D. (2000) Don't keep your internet customers waiting too long at the (virtual) front door. Journal of Interactive Marketing, 14(1), 30-39.
    • (2000) Journal of Interactive Marketing , vol.14 , Issue.1 , pp. 30-39
    • Weinberg, B.D.1
  • 26
    • 0031237423 scopus 로고    scopus 로고
    • A station model for continuous materials flow production
    • Yeralan, S. and Tan, B. (1997) A station model for continuous materials flow production. International Journal of Production Research, 35(9), 2525-2541.
    • (1997) International Journal of Production Research , vol.35 , Issue.9 , pp. 2525-2541
    • Yeralan, S.1    Tan, B.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.