메뉴 건너뛰기




Volumn 41, Issue 2, 2009, Pages 95-102

The impact of customer impatience on production control

Author keywords

Balking; Consumer impatience; Flow control; Make to stock; Manufacturing systems; Production control

Indexed keywords

CONTROL SYSTEMS; PROCESS CONTROL; PRODUCTION CONTROL; SALES;

EID: 56749158995     PISSN: 0740817X     EISSN: 15458830     Source Type: Journal    
DOI: 10.1080/07408170801958913     Document Type: Article
Times cited : (6)

References (13)
  • 1
    • 33748494355 scopus 로고    scopus 로고
    • Measuring and mitigating the cost of stockouts
    • Anderson, E., Fitzsimons, G. J. and Simester, D. (2006) Measuring and mitigating the cost of stockouts. Management Science, 52:11, pp. 1751-1763.
    • (2006) Management Science , vol.52 , Issue.11 , pp. 1751-1763
    • Anderson, E.1    Fitzsimons, G.J.2    Simester, D.3
  • 2
    • 0024037430 scopus 로고
    • Optimality of zero-inventory policies for unreliable manufacturing systems
    • Bielecki, T. and Kumar, P. R. (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 36:4, pp. 532-541.
    • (1988) Operations Research , vol.36 , Issue.4 , pp. 532-541
    • Bielecki, T.1    Kumar, P.R.2
  • 3
    • 0002996266 scopus 로고
    • Telephone circuit holding time distributions
    • The Netherlands, North-Holland, Amsterdam
    • Bolotin, V. (1994) Telephone circuit holding time distributions. Proceedings of the International Teletraffic Congress, ITC 14, pp. 125-134. The Netherlands, North-Holland, Amsterdam
    • (1994) Proceedings of the International Teletraffic Congress, ITC , vol.14 , pp. 125-134
    • Bolotin, V.1
  • 5
    • 0023455979 scopus 로고
    • An optimal stochastic production planning problem with randomly fluctuating demand
    • Fleming, W., Sethi, S. and Soner, H. (1987) An optimal stochastic production planning problem with randomly fluctuating demand. SIAM Journal of Control and Optimization, 25, pp. 1495-1502.
    • (1987) SIAM Journal of Control and Optimization , vol.25 , pp. 1495-1502
    • Fleming, W.1    Sethi, S.2    Soner, H.3
  • 7
    • 0029252650 scopus 로고
    • Production rate control for failure prone production with no backlog permitted
    • Hu, J. (1995) Production rate control for failure prone production with no backlog permitted. IEEE Transactions on Automatic Control, 40:2, pp. 291-295.
    • (1995) IEEE Transactions on Automatic Control , vol.40 , Issue.2 , pp. 291-295
    • Hu, J.1
  • 8
    • 7244248999 scopus 로고    scopus 로고
    • Hedging point policies remain optimal under limited backlog and inventory space
    • Martinelli, F. and Valigi, P. (2004) Hedging point policies remain optimal under limited backlog and inventory space. IEEE Transactions on Automatic Control, 49:10, pp. 1863-1869.
    • (2004) IEEE Transactions on Automatic Control , vol.49 , Issue.10 , pp. 1863-1869
    • Martinelli, F.1    Valigi, P.2
  • 9
    • 0035279831 scopus 로고    scopus 로고
    • Failure-prone production systems with uncertain demand
    • Perkins, J. and Srikant, R. (2001) Failure-prone production systems with uncertain demand. IEEE Transactions on Automatic Control, 46, pp. 441-449.
    • (2001) IEEE Transactions on Automatic Control , vol.46 , pp. 441-449
    • Perkins, J.1    Srikant, R.2
  • 10
    • 3242663060 scopus 로고    scopus 로고
    • Production and subcontracting strategies for manufacturers with limited capacity and volatile demand
    • Tan, B. and Gershwin, S. B. (2004) Production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Annals of Operations Research, 125, pp. 205-232.
    • (2004) Annals of Operations Research , vol.125 , pp. 205-232
    • Tan, B.1    Gershwin, S.B.2
  • 11
    • 0030181541 scopus 로고    scopus 로고
    • Scheduling a make-to-stock queue: Index policies and heading points
    • Veatch, M. and Wein, L. (1996) Scheduling a make-to-stock queue: Index policies and heading points. Operations Research, 44, pp. 634-647.
    • (1996) Operations Research , vol.44 , pp. 634-647
    • Veatch, M.1    Wein, L.2
  • 12
    • 0032656019 scopus 로고    scopus 로고
    • Improving service by informing customers about anticipated delays
    • Whitt, W. (1999) Improving service by informing customers about anticipated delays. Management Science, 45:2, pp. 192-207.
    • (1999) Management Science , vol.45 , Issue.2 , pp. 192-207
    • Whitt, W.1
  • 13
    • 14844304484 scopus 로고    scopus 로고
    • Engineering solution of a basic call-center model
    • Whitt, W. (2005) Engineering solution of a basic call-center model. Management Science, 51:2, pp. 221-235.
    • (2005) Management Science , vol.51 , Issue.2 , pp. 221-235
    • Whitt, W.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.