-
1
-
-
33748494355
-
Measuring and mitigating the cost of stockouts
-
Anderson, E., Fitzsimons, G. J. and Simester, D. (2006) Measuring and mitigating the cost of stockouts. Management Science, 52:11, pp. 1751-1763.
-
(2006)
Management Science
, vol.52
, Issue.11
, pp. 1751-1763
-
-
Anderson, E.1
Fitzsimons, G.J.2
Simester, D.3
-
2
-
-
0024037430
-
Optimality of zero-inventory policies for unreliable manufacturing systems
-
Bielecki, T. and Kumar, P. R. (1988) Optimality of zero-inventory policies for unreliable manufacturing systems. Operations Research, 36:4, pp. 532-541.
-
(1988)
Operations Research
, vol.36
, Issue.4
, pp. 532-541
-
-
Bielecki, T.1
Kumar, P.R.2
-
3
-
-
0002996266
-
Telephone circuit holding time distributions
-
The Netherlands, North-Holland, Amsterdam
-
Bolotin, V. (1994) Telephone circuit holding time distributions. Proceedings of the International Teletraffic Congress, ITC 14, pp. 125-134. The Netherlands, North-Holland, Amsterdam
-
(1994)
Proceedings of the International Teletraffic Congress, ITC
, vol.14
, pp. 125-134
-
-
Bolotin, V.1
-
4
-
-
14944380366
-
Statistical analysis of a telephone call center: A queueing-science perspective
-
Brown, L., Gans, N., Mandelbaum, A., Sakov, A., Shen, H., Zeltyn, S. and Zhao, L. (2005) Statistical analysis of a telephone call center: A queueing-science perspective. Journal of the American Statistical Association, 100:469, pp. 36-50.
-
(2005)
Journal of the American Statistical Association
, vol.100
, Issue.469
, pp. 36-50
-
-
Brown, L.1
Gans, N.2
Mandelbaum, A.3
Sakov, A.4
Shen, H.5
Zeltyn, S.6
Zhao, L.7
-
5
-
-
0023455979
-
An optimal stochastic production planning problem with randomly fluctuating demand
-
Fleming, W., Sethi, S. and Soner, H. (1987) An optimal stochastic production planning problem with randomly fluctuating demand. SIAM Journal of Control and Optimization, 25, pp. 1495-1502.
-
(1987)
SIAM Journal of Control and Optimization
, vol.25
, pp. 1495-1502
-
-
Fleming, W.1
Sethi, S.2
Soner, H.3
-
7
-
-
0029252650
-
Production rate control for failure prone production with no backlog permitted
-
Hu, J. (1995) Production rate control for failure prone production with no backlog permitted. IEEE Transactions on Automatic Control, 40:2, pp. 291-295.
-
(1995)
IEEE Transactions on Automatic Control
, vol.40
, Issue.2
, pp. 291-295
-
-
Hu, J.1
-
8
-
-
7244248999
-
Hedging point policies remain optimal under limited backlog and inventory space
-
Martinelli, F. and Valigi, P. (2004) Hedging point policies remain optimal under limited backlog and inventory space. IEEE Transactions on Automatic Control, 49:10, pp. 1863-1869.
-
(2004)
IEEE Transactions on Automatic Control
, vol.49
, Issue.10
, pp. 1863-1869
-
-
Martinelli, F.1
Valigi, P.2
-
10
-
-
3242663060
-
Production and subcontracting strategies for manufacturers with limited capacity and volatile demand
-
Tan, B. and Gershwin, S. B. (2004) Production and subcontracting strategies for manufacturers with limited capacity and volatile demand. Annals of Operations Research, 125, pp. 205-232.
-
(2004)
Annals of Operations Research
, vol.125
, pp. 205-232
-
-
Tan, B.1
Gershwin, S.B.2
-
11
-
-
0030181541
-
Scheduling a make-to-stock queue: Index policies and heading points
-
Veatch, M. and Wein, L. (1996) Scheduling a make-to-stock queue: Index policies and heading points. Operations Research, 44, pp. 634-647.
-
(1996)
Operations Research
, vol.44
, pp. 634-647
-
-
Veatch, M.1
Wein, L.2
-
12
-
-
0032656019
-
Improving service by informing customers about anticipated delays
-
Whitt, W. (1999) Improving service by informing customers about anticipated delays. Management Science, 45:2, pp. 192-207.
-
(1999)
Management Science
, vol.45
, Issue.2
, pp. 192-207
-
-
Whitt, W.1
-
13
-
-
14844304484
-
Engineering solution of a basic call-center model
-
Whitt, W. (2005) Engineering solution of a basic call-center model. Management Science, 51:2, pp. 221-235.
-
(2005)
Management Science
, vol.51
, Issue.2
, pp. 221-235
-
-
Whitt, W.1
|