메뉴 건너뛰기




Volumn 7, Issue 1, 2010, Pages 24-36

Managing supply uncertainties through Bayesian information update

Author keywords

Inventory control; Production control

Indexed keywords

BAYESIAN INFORMATION; BAYESIAN MODEL; BAYESIAN UPDATING; DIRICHLET PRIOR DISTRIBUTION; DUAL SOURCING; INFORMATION ASYMMETRY; INVENTORY MANAGEMENT; MATHEMATICAL TRACTABILITY; OPTIMAL ORDERING; SIMULATION RESULT; SOURCING STRATEGIES; SUPPLY DISRUPTION; SUPPLY RISK; SUPPLY UNCERTAINTY;

EID: 73849125668     PISSN: 15455955     EISSN: None     Source Type: Journal    
DOI: 10.1109/TASE.2009.2018466     Document Type: Article
Times cited : (32)

References (29)
  • 1
    • 0001001215 scopus 로고
    • Diversification under supply uncertainty
    • R. Anupindi and R. Akella, "Diversification under supply uncertainty," Manage. Sci., vol. 39, pp. 944-963, 1993.
    • (1993) Manage. Sci. , vol.39 , pp. 944-963
    • Anupindi, R.1    Akella, R.2
  • 2
    • 27544504473 scopus 로고    scopus 로고
    • The impact of duplicate orders on demand estimation and capacity investment
    • M. Armony and E. Plambeck, "The impact of duplicate orders on demand estimation and capacity investment," Manage. Sci., vol. 51, pp. 1505-1518, 2005.
    • (2005) Manage. Sci. , vol.51 , pp. 1505-1518
    • Armony, M.1    Plambeck, E.2
  • 3
    • 0032187128 scopus 로고    scopus 로고
    • Inventory management under random supply disruptions and partial backorders
    • A. Arreola-Risa and G. A. DeCroix, "Inventory management under random supply disruptions and partial backorders," Naval Res. Logist., vol. 45, pp. 687-703, 1998.
    • (1998) Naval Res. Logist. , vol.45 , pp. 687-703
    • Arreola-Risa, A.1    DeCroix, G.A.2
  • 4
    • 0022128608 scopus 로고
    • Bayes solution to dynamic inventory models under unknown demand distribution
    • K. S. Azoury, "Bayes solution to dynamic inventory models under unknown demand distribution," Manage. Sci., vol. 31, pp. 1150-1160, 1985.
    • (1985) Manage. Sci. , vol.31 , pp. 1150-1160
    • Azoury, K.S.1
  • 5
    • 38549156210 scopus 로고    scopus 로고
    • A multi-period newsvendor problem with partially observed demands
    • A. Bensoussan, M. Cakanyildirim, and S. P. Sethi, "A multi-period newsvendor problem with partially observed demands," Math. Oper. Res., vol. 32, pp. 322-344, 2007.
    • (2007) Math. Oper. Res. , vol.32 , pp. 322-344
    • Bensoussan, A.1    Cakanyildirim, M.2    Sethi, S.P.3
  • 7
    • 0035410521 scopus 로고    scopus 로고
    • Future capacity procurements under unknown demand and increasing costs
    • A. Burnetas and S. M. Gilbert, "Future capacity procurements under unknown demand and increasing costs," Manage. Sci., vol. 47, pp. 979-992, 2001.
    • (2001) Manage. Sci. , vol.47 , pp. 979-992
    • Burnetas, A.1    Gilbert, S.M.2
  • 8
    • 34547673287 scopus 로고    scopus 로고
    • The importance of decoupling recurrent and disruption risks in a supply chain
    • S. Chopra, G. Reinhardt, and U. Mohan, "The importance of decoupling recurrent and disruption risks in a supply chain," Naval Res. Logist., vol. 54, pp. 544-555, 2007.
    • (2007) Naval Res. Logist. , vol.54 , pp. 544-555
    • Chopra, S.1    Reinhardt, G.2    Mohan, U.3
  • 9
    • 0001110481 scopus 로고
    • A periodic review, production planning model with uncertain capacity and uncertain demand-optimality of extended myopic policies
    • F. Ciarallo, R. Akella, and T. Morton, "A periodic review, production planning model with uncertain capacity and uncertain demand-Optimality of extended myopic policies," Manage. Sci., vol. 40, pp. 320-332, 1994.
    • (1994) Manage. Sci. , vol.40 , pp. 320-332
    • Ciarallo, F.1    Akella, R.2    Morton, T.3
  • 11
    • 30544443871 scopus 로고    scopus 로고
    • Commitment decisions with partial information updating
    • M. E. Ferguson, G. A. Decroix, and P. H. Zipkin, "Commitment decisions with partial information updating," Naval Res. Logist., vol. 52, pp. 780-795, 2005.
    • (2005) Naval Res. Logist. , vol.52 , pp. 780-795
    • Ferguson, M.E.1    Decroix, G.A.2    Zipkin, P.H.3
  • 12
    • 0031273962 scopus 로고    scopus 로고
    • An inventory problem with two randomly available suppliers
    • U. Gurler and M. Parlar, "An inventory problem with two randomly available suppliers," Oper. Res., vol. 45, pp. 904-918, 1997.
    • (1997) Oper. Res. , vol.45 , pp. 904-918
    • Gurler, U.1    Parlar, M.2
  • 13
    • 33744799033 scopus 로고    scopus 로고
    • A bargaining model for a first-time interaction under asymmetric beliefs of supply reliability
    • H. Gurnani and M. Shi, "A bargaining model for a first-time interaction under asymmetric beliefs of supply reliability," Manage. Sci., vol. 52, pp. 865-880, 2006.
    • (2006) Manage. Sci. , vol.52 , pp. 865-880
    • Gurnani, H.1    Shi, M.2
  • 14
    • 73849092756 scopus 로고    scopus 로고
    • Critical U.S. supply line is disrupted
    • Sep.
    • N. Irwin, "Critical U.S. supply line is disrupted," Washington Post, Sep. 2005.
    • (2005) Washington Post
    • Irwin, N.1
  • 15
    • 0031109379 scopus 로고    scopus 로고
    • Quick response in manufacturer-retailer channels
    • A. Iyer and M. Bergen, "Quick response in manufacturer-retailer channels," Manage. Sci., vol. 43, pp. 559-570, 1997.
    • (1997) Manage. Sci. , vol.43 , pp. 559-570
    • Iyer, A.1    Bergen, M.2
  • 16
    • 24144467380 scopus 로고    scopus 로고
    • Contingency management under asymmetric information
    • A. Iyer, V. Deshpande, and Z. Wu, "Contingency management under asymmetric information," Oper. Res. Lett., vol. 33, pp. 572-580, 2005.
    • (2005) Oper. Res. Lett. , vol.33 , pp. 572-580
    • Iyer, A.1    Deshpande, V.2    Wu, Z.3
  • 17
    • 20944440587 scopus 로고    scopus 로고
    • A trial by fire: A blaze in Albuquerque bets-off major crisis for cell phone giants-Nokia handles supply shock with aplomb as Ericsson gets burned
    • Jan. 29
    • A. Latour, "A trial by fire: A blaze in Albuquerque bets-off major crisis for cell phone giants-Nokia handles supply shock with aplomb as Ericsson gets burned," Wall Street J., Jan. 29, 2001.
    • (2001) Wall Street J.
    • Latour, A.1
  • 20
    • 0033137504 scopus 로고    scopus 로고
    • Supplier diversification: Effect of discrete demand
    • J. M. Swaminathan and J. G. Shanthikumar, "Supplier diversification: Effect of discrete demand," Oper. Res. Lett., vol. 24, pp. 213-221, 1999.
    • (1999) Oper. Res. Lett. , vol.24 , pp. 213-221
    • Swaminathan, J.M.1    Shanthikumar, J.G.2
  • 21
    • 85132615183 scopus 로고    scopus 로고
    • Robust strategies for mitigating supply chain disruptions
    • C. S. Tang, "Robust strategies for mitigating supply chain disruptions," Int. J. Logist.: Res. Applicat., vol. 9, pp. 33-45, 2006.
    • (2006) Int. J. Logist.: Res. Applicat. , vol.9 , pp. 33-45
    • Tang, C.S.1
  • 22
    • 25144444083 scopus 로고    scopus 로고
    • On the value of mix flexibility and dual sourcing in unreliable news vendor networks
    • B. Tomlin and Y. Wang, "On the value of mix flexibility and dual sourcing in unreliable news vendor networks," Manuf. Service Oper. Manage., vol. 7, pp. 37-57, 2005.
    • (2005) Manuf. Service Oper. Manage. , vol.7 , pp. 37-57
    • Tomlin, B.1    Wang, Y.2
  • 23
    • 67649998398 scopus 로고    scopus 로고
    • The impact of supply learning when suppliers are unreliable
    • to be published
    • B. Tomlin, "The impact of supply learning when suppliers are unreliable," Manuf. Service Oper. Manage., to be published.
    • Manuf. Service Oper. Manage.
    • Tomlin, B.1
  • 24
    • 0000455414 scopus 로고    scopus 로고
    • Variable capacity, random yield, and uncertain demand
    • Y.Wang and Y. Gerchak, "Variable capacity, random yield, and uncertain demand," Manage. Sci., vol. 42, pp. 130-137, 1996.
    • (1996) Manage. Sci. , vol.42 , pp. 130-137
    • Wang, Y.1    Gerchak, Y.2
  • 26
    • 73849100216 scopus 로고    scopus 로고
    • A global journal report: SARS alters face of China business-Travel restraints fuel use of technology, innovation; jitters diminish euphoria
    • May 23
    • P. Wonacott, N. Shirouzu, and J. E. Hilsenrath, "A global journal report: SARS alters face of China business-Travel restraints fuel use of technology, innovation; jitters diminish euphoria," Asian Wall Street J., May 23, 2003.
    • (2003) Asian Wall Street J.
    • Wonacott, P.1    Shirouzu, N.2    Hilsenrath, J.E.3
  • 27
    • 1642502335 scopus 로고    scopus 로고
    • Real-time disruption management in a two-stage production and inventory system
    • Y. Xia, M. Yang, B. Golany, S. Gilbert, and G. Yu, "Real-time disruption management in a two-stage production and inventory system," IIE Trans., vol. 36, pp. 111-125, 2004.
    • (2004) IIE Trans. , vol.36 , pp. 111-125
    • Xia, Y.1    Yang, M.2    Golany, B.3    Gilbert, S.4    Yu, G.5
  • 28
    • 24144493803 scopus 로고    scopus 로고
    • The convex-cost production planning disruption recovery problem and the steepest descent method
    • J. Yang, X. Qi, and G. Yu, "The convex-cost production planning disruption recovery problem and the steepest descent method," Naval Res. Logist., vol. 52, pp. 420-442, 2005.
    • (2005) Naval Res. Logist. , vol.52 , pp. 420-442
    • Yang, J.1    Qi, X.2    Yu, G.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.