메뉴 건너뛰기




Volumn 52, Issue 3, 2009, Pages 307-320

Optimal policy for a simple supply chain system with defective items and returned cost under screening errors

Author keywords

Imperfect quality; Inventory; Screening error; Shipment; Supply chain

Indexed keywords


EID: 72549106926     PISSN: 04534514     EISSN: None     Source Type: Journal    
DOI: 10.15807/jorsj.52.307     Document Type: Article
Times cited : (26)

References (29)
  • 1
    • 84985846646 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor
    • A. Banerjee: A joint economic-lot-size model for purchaser and vendor. Decision Sciences, 17 (1986), 292-311.
    • (1986) Decision Sciences , vol.17 , pp. 292-311
    • Banerjee, A.1
  • 2
    • 0042418810 scopus 로고    scopus 로고
    • Optimizing multistage production with constant lot size and varying number of unequal sized batches
    • R.W. Bogaschewsky, W. Ronald, U.D. Buscher, and G. Lindner: Optimizing multistage production with constant lot size and varying number of unequal sized batches. Omega, 29 (2001), 183-191.
    • (2001) Omega , vol.29 , pp. 183-191
    • Bogaschewsky, R.W.1    Ronald, W.2    Buscher, U.D.3    Lindner, G.4
  • 3
    • 33747026665 scopus 로고    scopus 로고
    • Optimizing a production system with rework and equal sized batch shipments
    • U.D. Buscher and G. Lindner: Optimizing a production system with rework and equal sized batch shipments. Computers and Operations Research, 34 (2007), 515-535.
    • (2007) Computers and Operations Research , vol.34 , pp. 515-535
    • Buscher, U.D.1    Lindner, G.2
  • 4
    • 26844537321 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction
    • H.M. Chang, L.Y. Ouyang, K.S. Wu, and C.H. Ho: Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction. European Journal of Operational Research, 170 (2006), 481-495.
    • (2006) European Journal of Operational Research , vol.170 , pp. 481-495
    • Chang, H.M.1    Ouyang, L.Y.2    Wu, K.S.3    Ho, C.H.4
  • 5
    • 34250030046 scopus 로고    scopus 로고
    • Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments
    • L.H. Chen and F.S. Kang: Integrated vendor-buyer cooperative inventory models with variant permissible delay in payments. European Journal of Operational Research, 183 (2007), 658-673.
    • (2007) European Journal of Operational Research , vol.183 , pp. 658-673
    • Chen, L.H.1    Kang, F.S.2
  • 6
    • 0026116409 scopus 로고
    • An economic order quantity model with demand-dependent unit production cost and imperfect production processes
    • C.E. Cheng: An economic order quantity model with demand-dependent unit production cost and imperfect production processes. IIE Transactions, 23 (1991), 23-28.
    • (1991) IIE Transactions , vol.23 , pp. 23-28
    • Cheng, C.E.1
  • 7
    • 41549106741 scopus 로고    scopus 로고
    • A necessary and sufficient condition for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration
    • K.J. Chung: A necessary and sufficient condition for the existence of the optimal solution of a single-vendor single-buyer integrated production-inventory model with process unreliability consideration. International Journal of Production Economics, 113 (2008), 269-274.
    • (2008) International Journal of Production Economics , vol.113 , pp. 269-274
    • Chung, K.J.1
  • 8
    • 33749988426 scopus 로고    scopus 로고
    • Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost
    • K. Ertogral, M. Darwish, and M. Ben-Daya: Production and shipment lot sizing in a vendor-buyer supply chain with transportation cost. European Journal of Operational Research, 176 (2007), 1592-1606.
    • (2007) European Journal of Operational Research , vol.176 , pp. 1592-1606
    • Ertogral, K.1    Darwish, M.2    Ben-Daya, M.3
  • 9
    • 0017416997 scopus 로고
    • An integrated inventory model for a single supplier-single customer problem
    • S.K. Goyal: An integrated inventory model for a single supplier-single customer problem. International Journal of Production Research, 15 (1976), 107-111.
    • (1976) International Journal of Production Research , vol.15 , pp. 107-111
    • Goyal, S.K.1
  • 10
    • 84985781712 scopus 로고
    • A joint economic-lot-size model for purchaser and vendor: A comment
    • S.K. Goyal: A joint economic-lot-size model for purchaser and vendor: A comment. Decision Sciences, 19 (1988), 236-241.
    • (1988) Decision Sciences , vol.19 , pp. 236-241
    • Goyal, S.K.1
  • 11
    • 0001539415 scopus 로고
    • A one-vendor multi-buyer integrated inventory model: A comment
    • S.K. Goyal: A one-vendor multi-buyer integrated inventory model: A comment. European Journal of Operational Research, 82 (1995), 209-210.
    • (1995) European Journal of Operational Research , vol.82 , pp. 209-210
    • Goyal, S.K.1
  • 12
    • 0036568439 scopus 로고    scopus 로고
    • Note on: Economic production quantity model for items with imperfect quality-A practical approach
    • S.K Goyal and L.E Cardenas-Barron: Note on: Economic production quantity model for items with imperfect quality-A practical approach. International Journal of Production Economics, 77 (2002), 85-87.
    • (2002) International Journal of Production Economics , vol.77 , pp. 85-87
    • Goyal, S.K.1    Cardenas-Barron, L.E.2
  • 13
    • 0031103642 scopus 로고    scopus 로고
    • Implementation of JIT purchasing: An integrated approach
    • D. Ha and S.L. Kim: Implementation of JIT purchasing: An integrated approach. Production Planning & Control, 8 (1997), 152-157.
    • (1997) Production Planning & Control , vol.8 , pp. 152-157
    • Ha, D.1    Kim, S.L.2
  • 14
    • 0031101243 scopus 로고    scopus 로고
    • The single-vendor single-buyer integrated production-inventory model with a generalized policy
    • R.M. Hill: The single-vendor single-buyer integrated production-inventory model with a generalized policy. European Journal of Operational Research, 97 (1997), 493-499.
    • (1997) European Journal of Operational Research , vol.97 , pp. 493-499
    • Hill, R.M.1
  • 15
    • 0032632360 scopus 로고    scopus 로고
    • The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory model
    • R.M. Hill: The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory model. International Journal Production Research, 37 (1999), 2463-2475.
    • (1999) International Journal Production Research , vol.37 , pp. 2463-2475
    • Hill, R.M.1
  • 16
    • 0033747626 scopus 로고    scopus 로고
    • An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment
    • M.A. Hoque and S.K. Goyal: An optimal policy for a single-vendor single-buyer integrated production-inventory system with capacity constraint of the transport equipment. International Journal of Production Economics, 65 (2000), 305-315.
    • (2000) International Journal of Production Economics , vol.65 , pp. 305-315
    • Hoque, M.A.1    Goyal, S.K.2
  • 17
    • 33646107382 scopus 로고    scopus 로고
    • A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer
    • M.A. Hoque and S.K. Goyal: A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer. International Journal of Production Economics, 102 (2006), 217-225.
    • (2006) International Journal of Production Economics , vol.102 , pp. 217-225
    • Hoque, M.A.1    Goyal, S.K.2
  • 18
    • 34248361085 scopus 로고    scopus 로고
    • Optimal ordering decision for deteriorating items with expiration date and uncertain lead time
    • P.H. Hsu, H.M. Wee, and H.M. Teng: Optimal ordering decision for deteriorating items with expiration date and uncertain lead time. Computers & Industrial Engineering, 52 (2007), 448-458.
    • (2007) Computers & Industrial Engineering , vol.52 , pp. 448-458
    • Hsu, P.H.1    Wee, H.M.2    Teng, H.M.3
  • 19
    • 3242717595 scopus 로고    scopus 로고
    • An optimal policy for a single-vendor single buyer integrated production-inventory problem with process unreliability consideration
    • C.K. Huang: An optimal policy for a single-vendor single buyer integrated production-inventory problem with process unreliability consideration. International Journal of Production Economics, 91 (2004), 91-98.
    • (2004) International Journal of Production Economics , vol.91 , pp. 91-98
    • Huang, C.K.1
  • 20
    • 39649124927 scopus 로고    scopus 로고
    • Economic order quantity for items with imperfect quality: Revisited
    • B. Maddah and M.Y. Jaber: Economic order quantity for items with imperfect quality: Revisited. International Journal of Production Economics, 112 (2008), 808-815.
    • (2008) International Journal of Production Economics , vol.112 , pp. 808-815
    • Maddah, B.1    Jaber, M.Y.2
  • 21
    • 0037139670 scopus 로고    scopus 로고
    • A study of an integrated inventory with controllable lead time
    • J.C.H. Pan and J.S. Yang: A study of an integrated inventory with controllable lead time. International Journal of Production Research, 40 (2002), 1263-1273.
    • (2002) International Journal of Production Research , vol.40 , pp. 1263-1273
    • Pan, J.C.H.1    Yang, J.S.2
  • 23
    • 0022613610 scopus 로고
    • Optimal lot sizing, process quality improvement and setup cost reduction
    • E.L. Porteus: Optimal lot sizing, process quality improvement and setup cost reduction. Operations Research, 34 (1986), 137-144.
    • (1986) Operations Research , vol.34 , pp. 137-144
    • Porteus, E.L.1
  • 24
    • 0022676316 scopus 로고
    • Economic production cycles with imperfect production processes
    • M.J. Rosenblat and H.L. Lee: Economic production cycles with imperfect production processes. IIE Transactions, 18 (1986), 48-55.
    • (1986) IIE Transactions , vol.18 , pp. 48-55
    • Rosenblat, M.J.1    Lee, H.L.2
  • 27
    • 0032002459 scopus 로고    scopus 로고
    • Optimal strategy for the integrated vendor-buyer inventory model
    • S. Viswanathan: Optimal strategy for the integrated vendor-buyer inventory model. European Journal of Operational Research, 105 (1998), 38-42.
    • (1998) European Journal of Operational Research , vol.105 , pp. 38-42
    • Viswanathan, S.1
  • 28
    • 0034236847 scopus 로고    scopus 로고
    • Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach
    • P.C. Yang and H.M. Wee: Economic ordering policy of deteriorated item for vendor and buyer: An integrated approach. Production Planning & Control, 11 (2000), 41-47.
    • (2000) Production Planning & Control , vol.11 , pp. 41-47
    • Yang, P.C.1    Wee, H.M.2
  • 29
    • 0025399639 scopus 로고
    • Joint lot sizing and inspection policy in an EOQ model with random yield
    • X. Zhang and Y. Gerchak: Joint lot sizing and inspection policy in an EOQ model with random yield. IIE Transaction, 22 (1990), 41-47.
    • (1990) IIE Transaction , vol.22 , pp. 41-47
    • Zhang, X.1    Gerchak, Y.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.