-
3
-
-
40749140333
-
The development of advanced methods for scheduling production processes
-
Tasic, T.; Buchmeister, B.; Acko, B. (2007). The development of advanced methods for scheduling production processes, Strojniski vestnik - Journal of Mechanical Engineering, Vol.53, No.12, 844-857
-
(2007)
Strojniski Vestnik - Journal of Mechanical Engineering
, vol.53
, Issue.12
, pp. 844-857
-
-
Tasic, T.1
Buchmeister, B.2
Acko, B.3
-
4
-
-
33746060679
-
Simulation study on the performance analysis of various sequencing rules
-
Buchmeister, B.; Kremljak, Z.; Pandza, K.; Polajnar, A. (2004). Simulation study on the performance analysis of various sequencing rules, International Journal of Simulation Modelling, Vol.3, No.2-3, 80-89
-
(2004)
International Journal of Simulation Modelling
, vol.3
, Issue.2-3
, pp. 80-89
-
-
Buchmeister, B.1
Kremljak, Z.2
Pandza, K.3
Polajnar, A.4
-
6
-
-
84902545125
-
Scheduling and simulation
-
Herrmann, J. W. (Editor), Springer Science+Business Media, New York
-
Fowler, J. W.; Mönch, L.; Rose, O. (2006). Scheduling and simulation, Herrmann, J. W. (Editor), Handbook of production scheduling, Springer Science+Business Media, New York, 109-133
-
(2006)
Handbook of Production Scheduling
, pp. 109-133
-
-
Fowler, J.W.1
Mönch, L.2
Rose, O.3
-
9
-
-
34250219585
-
A very fast TS/SA algorithm for the job shop scheduling problem
-
DOI 10.1016/j.cor.2006.02.024, PII S0305054806000670
-
Zhang, C. Y.; Li, P.-G.; Rao, Y.-Q.; Guan, Z.-L. (2008). A very fast TS/SA algorithm for the job shop scheduling problem, Computers and Operations Research, Vol.35, No.1, 282-294 (Pubitemid 46899361)
-
(2008)
Computers and Operations Research
, vol.35
, Issue.1
, pp. 282-294
-
-
Zhang, C.Y.1
Li, P.2
Rao, Y.3
Guan, Z.4
-
12
-
-
40649091006
-
A genetic algorithm to optimise signal phasing in area traffic control
-
Glasgow
-
Sung, K.; Anderson, J.; Bell, M. G. H. (1997). A genetic algorithm to optimise signal phasing in area traffic control, Second international conference on genetic algorithms in engineering systems, Glasgow, 404-408
-
(1997)
Second International Conference on Genetic Algorithms in Engineering Systems
, pp. 404-408
-
-
Sung, K.1
Anderson, J.2
Bell, M.G.H.3
-
13
-
-
33747203270
-
An analysis of the influence of pedestrians traffic flow on the capacity of a roundabout using the discrete simulation method
-
Tollazzi, T.; Lerher, T. (2008). An analysis of the influence of pedestrians traffic flow on the capacity of a roundabout using the discrete simulation method, Strojniski vestnik - Journal of Mechanical Engineering, Vol.52, No.6, 359-379
-
(2008)
Strojniski Vestnik - Journal of Mechanical Engineering
, vol.52
, Issue.6
, pp. 359-379
-
-
Tollazzi, T.1
Lerher, T.2
-
14
-
-
0030242695
-
A tutorial survey of job-shop scheduling problems using genetic algorithms -1: Representation
-
Cheng, R.; Gen, M.; Tsojimura, Y. (1996). A tutorial survey of job-shop scheduling problems using genetic algorithms -1: representation, Computers and Industrial Engineering, Vol.30, No.4, 983-997
-
(1996)
Computers and Industrial Engineering
, vol.30
, Issue.4
, pp. 983-997
-
-
Cheng, R.1
Gen, M.2
Tsojimura, Y.3
-
15
-
-
72449128395
-
-
Faculty of Electrical Engineering and Computer Science, University of Maribor, Maribor
-
Mernik, M.; Crepinsek, M.; Zumer, V. (2003). Evolutionary algorithms (in Slovene), Faculty of Electrical Engineering and Computer Science, University of Maribor, Maribor
-
(2003)
Evolutionary Algorithms (in Slovene)
-
-
Mernik, M.1
Crepinsek, M.2
Zumer, V.3
-
17
-
-
51849167828
-
-
Springer-Verlag, Berlin
-
Blazewicz, J.; Ecker, K. H.; Pesch, E.; Schmidt, G.; Weglarz, J. (2007). Handbook on scheduling, Springer-Verlag, Berlin
-
(2007)
Handbook on Scheduling
-
-
Blazewicz, J.1
Ecker, K.H.2
Pesch, E.3
Schmidt, G.4
Weglarz, J.5
|