메뉴 건너뛰기




Volumn 53, Issue 12, 2007, Pages 844-857

The development of advanced methods for scheduling production processes;Razvoj naprednih metod za vodenje proizvodnih postopkov

Author keywords

Deterministic sequencing; Priority rules; Production process planning; Scheduling

Indexed keywords

DETERMINISTIC SEQUENCING; OPERATIONAL EFFECTIVENESS; PRIORITY RULES;

EID: 40749140333     PISSN: 00392480     EISSN: None     Source Type: Journal    
DOI: None     Document Type: Article
Times cited : (15)

References (21)
  • 1
    • 40749145089 scopus 로고
    • Problèmes d'ordonnancement: Modelisation / complexité / algorithmes
    • Paris
    • Carlier, J. and P. Chrétienne (1988) Problèmes d'ordonnancement: modelisation / complexité / algorithmes. Masson, Paris.
    • (1988) Masson
    • Carlier, J.1    Chrétienne, P.2
  • 2
    • 0003075019 scopus 로고
    • Optimal two and three stage production schedules with set-up time included
    • Johnson, S. M. (1954) Optimal two and three stage production schedules with set-up time included, Naval Research Logistics Quarterly, Vol. 1, pp. 61-68.
    • (1954) Naval Research Logistics Quarterly , vol.1 , pp. 61-68
    • Johnson, S.M.1
  • 5
    • 0008264656 scopus 로고    scopus 로고
    • Comparison of scheduling rules in a flow shop with multiple processors: A simulation
    • Brah, S. A. and G. E. Wheeler (1998) Comparison of scheduling rules in a flow shop with multiple processors: A simulation, Simulation, Vol. 71, No. 5, pp. 302-311.
    • (1998) Simulation , vol.71 , Issue.5 , pp. 302-311
    • Brah, S.A.1    Wheeler, G.E.2
  • 6
    • 40749116729 scopus 로고    scopus 로고
    • Polajnar, A., B. Buchmeister, M. Leber, K. Pandža, B. Kalpič, T. Rojs, N. Vujica-Herzog, I. Palčič, T. Fulder and P. Meža (2004) Menedžment proizvodnih sistemov (sodobni pristopi). Fakulteta za strojništvo, Maribor.
    • Polajnar, A., B. Buchmeister, M. Leber, K. Pandža, B. Kalpič, T. Rojs, N. Vujica-Herzog, I. Palčič, T. Fulder and P. Meža (2004) Menedžment proizvodnih sistemov (sodobni pristopi). Fakulteta za strojništvo, Maribor.
  • 7
    • 84891459569 scopus 로고    scopus 로고
    • Scheduling algorithms
    • Berlin
    • Brucker, P. (1998) Scheduling algorithms. Springer-Verlag, Berlin.
    • (1998) Springer-Verlag
    • Brucker, P.1
  • 9
    • 0036014183 scopus 로고    scopus 로고
    • Leveraging the potential of process technology through workflow scheduling
    • Gomes, P. J. and L. C. Meile (2002) Leveraging the potential of process technology through workflow scheduling, International Journal of Service Industry Management, Vol. 13, No. 1, pp. 7-28.
    • (2002) International Journal of Service Industry Management , vol.13 , Issue.1 , pp. 7-28
    • Gomes, P.J.1    Meile, L.C.2
  • 11
    • 40749139690 scopus 로고    scopus 로고
    • The problem of JIT dynamic scheduling. A model and a parametric procedure
    • Paris, September
    • Garcia-Sabater, J. P. (2001) The problem of JIT dynamic scheduling. A model and a parametric procedure. Proceedings of the ORP3 conference, Paris, September 2001.
    • (2001) Proceedings of the ORP3 conference
    • Garcia-Sabater, J.P.1
  • 12
    • 11244326464 scopus 로고    scopus 로고
    • Maintenance planning, scheduling and coordination
    • New York
    • Nyman, D. and J. Levitt (2001) Maintenance planning, scheduling and coordination. Industrial Press, New York.
    • (2001) Industrial Press
    • Nyman, D.1    Levitt, J.2
  • 13
    • 85055840680 scopus 로고    scopus 로고
    • Handbook of scheduling: Algorithms, models and performance analysis
    • Boca Raton
    • Leung, J. Y.-T. (2004) Handbook of scheduling: algorithms, models and performance analysis. Chapman & Hall/CRC, Boca Raton.
    • (2004) Chapman & Hall/CRC
    • Leung, J.Y.-T.1
  • 14
    • 0006449722 scopus 로고    scopus 로고
    • Maintenance planning and scheduling handbook
    • New York
    • Palmer, D. (2006) Maintenance planning and scheduling handbook. McGraw-Hill, New York.
    • (2006) McGraw-Hill
    • Palmer, D.1
  • 15
    • 0036640167 scopus 로고    scopus 로고
    • Vehicle travel time models for AGV systems under various dispatching rules
    • Koo, R-H. and J. Jang (2002) Vehicle travel time models for AGV systems under various dispatching rules, International Journal of Flexible Manufacturing Systems, Vol. 14, pp. 249-261.
    • (2002) International Journal of Flexible Manufacturing Systems , vol.14 , pp. 249-261
    • Koo, R.-H.1    Jang, J.2
  • 17
  • 18
    • 40749146611 scopus 로고    scopus 로고
    • Operativni management proizvodnje
    • Moderna organizacija, Kranj
    • Ljubič, T. (2006) Operativni management proizvodnje. Založba Moderna organizacija, Kranj.
    • (2006) Založba
    • Ljubič, T.1
  • 19
    • 85098047684 scopus 로고    scopus 로고
    • Planning and scheduling in manufacturing and services
    • New York
    • Pinedo, M. L. (2005) Planning and scheduling in manufacturing and services, Springer Science+Business Media, New York.
    • (2005) Springer Science+Business Media
    • Pinedo, M.L.1
  • 20
    • 28744450315 scopus 로고    scopus 로고
    • A heuristic model for the development of production capabilities
    • Kremljak, Z., A. Polajnar and B. Buchmeister (2005) A heuristic model for the development of production capabilities, Journal of Mechanical Engineering, Vol. 51, No. 11, pp. 674-691.
    • (2005) Journal of Mechanical Engineering , vol.51 , Issue.11 , pp. 674-691
    • Kremljak, Z.1    Polajnar, A.2    Buchmeister, B.3
  • 21
    • 34047227799 scopus 로고    scopus 로고
    • Bottleneck analysis in MDF-production by means of discrete event simulation
    • doi:10.2507/IJSIMM06(1)5.084
    • Penker, A., M. C. Barbu and M. Gronalt (2007) Bottleneck analysis in MDF-production by means of discrete event simulation, International Journal of Simulation Modelling (Int J Simul Model), Vol. 6, No. 1, pp. 49-57, doi:10.2507/IJSIMM06(1)5.084.
    • (2007) International Journal of Simulation Modelling (Int J Simul Model) , vol.6 , Issue.1 , pp. 49-57
    • Penker, A.1    Barbu, M.C.2    Gronalt, M.3


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.