-
1
-
-
40749145089
-
Problèmes d'ordonnancement: Modelisation / complexité / algorithmes
-
Paris
-
Carlier, J. and P. Chrétienne (1988) Problèmes d'ordonnancement: modelisation / complexité / algorithmes. Masson, Paris.
-
(1988)
Masson
-
-
Carlier, J.1
Chrétienne, P.2
-
2
-
-
0003075019
-
Optimal two and three stage production schedules with set-up time included
-
Johnson, S. M. (1954) Optimal two and three stage production schedules with set-up time included, Naval Research Logistics Quarterly, Vol. 1, pp. 61-68.
-
(1954)
Naval Research Logistics Quarterly
, vol.1
, pp. 61-68
-
-
Johnson, S.M.1
-
4
-
-
0016556637
-
Minimizing total costs in one-machine scheduling
-
Lawler, E. L., A. H. G. Rinnooy Kan and B. Lageweg (1975) Minimizing total costs in one-machine scheduling, Operations Research, Vol. 23, pp. 908-927.
-
(1975)
Operations Research
, vol.23
, pp. 908-927
-
-
Lawler, E.L.1
Rinnooy Kan, A.H.G.2
Lageweg, B.3
-
5
-
-
0008264656
-
Comparison of scheduling rules in a flow shop with multiple processors: A simulation
-
Brah, S. A. and G. E. Wheeler (1998) Comparison of scheduling rules in a flow shop with multiple processors: A simulation, Simulation, Vol. 71, No. 5, pp. 302-311.
-
(1998)
Simulation
, vol.71
, Issue.5
, pp. 302-311
-
-
Brah, S.A.1
Wheeler, G.E.2
-
6
-
-
40749116729
-
-
Polajnar, A., B. Buchmeister, M. Leber, K. Pandža, B. Kalpič, T. Rojs, N. Vujica-Herzog, I. Palčič, T. Fulder and P. Meža (2004) Menedžment proizvodnih sistemov (sodobni pristopi). Fakulteta za strojništvo, Maribor.
-
Polajnar, A., B. Buchmeister, M. Leber, K. Pandža, B. Kalpič, T. Rojs, N. Vujica-Herzog, I. Palčič, T. Fulder and P. Meža (2004) Menedžment proizvodnih sistemov (sodobni pristopi). Fakulteta za strojništvo, Maribor.
-
-
-
-
7
-
-
84891459569
-
Scheduling algorithms
-
Berlin
-
Brucker, P. (1998) Scheduling algorithms. Springer-Verlag, Berlin.
-
(1998)
Springer-Verlag
-
-
Brucker, P.1
-
8
-
-
33746060679
-
Simulation study on the performance analysis of various sequencing rules
-
Buchmeister, B., Z. Kremljak, K. Pandža, A. Polajnar (2004) Simulation study on the performance analysis of various sequencing rules, International Journal of Simulation Modelling (Int J Simul Model), Vol. 3, No. 2-3, pp. 80-89.
-
(2004)
International Journal of Simulation Modelling (Int J Simul Model)
, vol.3
, Issue.2-3
, pp. 80-89
-
-
Buchmeister, B.1
Kremljak, Z.2
Pandža, K.3
Polajnar, A.4
-
9
-
-
0036014183
-
Leveraging the potential of process technology through workflow scheduling
-
Gomes, P. J. and L. C. Meile (2002) Leveraging the potential of process technology through workflow scheduling, International Journal of Service Industry Management, Vol. 13, No. 1, pp. 7-28.
-
(2002)
International Journal of Service Industry Management
, vol.13
, Issue.1
, pp. 7-28
-
-
Gomes, P.J.1
Meile, L.C.2
-
10
-
-
40749114996
-
Scheduling computer and manufacturing processes
-
Berlin
-
Blažewicz, J., K. H. Ecker, E. Pesch, G. Schmidt and J. Weglarz (2001) Scheduling computer and manufacturing processes, Springer-Verlag, Berlin.
-
(2001)
Springer-Verlag
-
-
Blažewicz, J.1
Ecker, K.H.2
Pesch, E.3
Schmidt, G.4
Weglarz, J.5
-
11
-
-
40749139690
-
The problem of JIT dynamic scheduling. A model and a parametric procedure
-
Paris, September
-
Garcia-Sabater, J. P. (2001) The problem of JIT dynamic scheduling. A model and a parametric procedure. Proceedings of the ORP3 conference, Paris, September 2001.
-
(2001)
Proceedings of the ORP3 conference
-
-
Garcia-Sabater, J.P.1
-
12
-
-
11244326464
-
Maintenance planning, scheduling and coordination
-
New York
-
Nyman, D. and J. Levitt (2001) Maintenance planning, scheduling and coordination. Industrial Press, New York.
-
(2001)
Industrial Press
-
-
Nyman, D.1
Levitt, J.2
-
13
-
-
85055840680
-
Handbook of scheduling: Algorithms, models and performance analysis
-
Boca Raton
-
Leung, J. Y.-T. (2004) Handbook of scheduling: algorithms, models and performance analysis. Chapman & Hall/CRC, Boca Raton.
-
(2004)
Chapman & Hall/CRC
-
-
Leung, J.Y.-T.1
-
14
-
-
0006449722
-
Maintenance planning and scheduling handbook
-
New York
-
Palmer, D. (2006) Maintenance planning and scheduling handbook. McGraw-Hill, New York.
-
(2006)
McGraw-Hill
-
-
Palmer, D.1
-
15
-
-
0036640167
-
Vehicle travel time models for AGV systems under various dispatching rules
-
Koo, R-H. and J. Jang (2002) Vehicle travel time models for AGV systems under various dispatching rules, International Journal of Flexible Manufacturing Systems, Vol. 14, pp. 249-261.
-
(2002)
International Journal of Flexible Manufacturing Systems
, vol.14
, pp. 249-261
-
-
Koo, R.-H.1
Jang, J.2
-
18
-
-
40749146611
-
Operativni management proizvodnje
-
Moderna organizacija, Kranj
-
Ljubič, T. (2006) Operativni management proizvodnje. Založba Moderna organizacija, Kranj.
-
(2006)
Založba
-
-
Ljubič, T.1
-
19
-
-
85098047684
-
Planning and scheduling in manufacturing and services
-
New York
-
Pinedo, M. L. (2005) Planning and scheduling in manufacturing and services, Springer Science+Business Media, New York.
-
(2005)
Springer Science+Business Media
-
-
Pinedo, M.L.1
-
20
-
-
28744450315
-
A heuristic model for the development of production capabilities
-
Kremljak, Z., A. Polajnar and B. Buchmeister (2005) A heuristic model for the development of production capabilities, Journal of Mechanical Engineering, Vol. 51, No. 11, pp. 674-691.
-
(2005)
Journal of Mechanical Engineering
, vol.51
, Issue.11
, pp. 674-691
-
-
Kremljak, Z.1
Polajnar, A.2
Buchmeister, B.3
-
21
-
-
34047227799
-
Bottleneck analysis in MDF-production by means of discrete event simulation
-
doi:10.2507/IJSIMM06(1)5.084
-
Penker, A., M. C. Barbu and M. Gronalt (2007) Bottleneck analysis in MDF-production by means of discrete event simulation, International Journal of Simulation Modelling (Int J Simul Model), Vol. 6, No. 1, pp. 49-57, doi:10.2507/IJSIMM06(1)5.084.
-
(2007)
International Journal of Simulation Modelling (Int J Simul Model)
, vol.6
, Issue.1
, pp. 49-57
-
-
Penker, A.1
Barbu, M.C.2
Gronalt, M.3
|