메뉴 건너뛰기




Volumn 51, Issue 3, 2010, Pages 524-530

Scheduling of head-dependent cascaded hydro systems: Mixed-integer quadratic programming approach

Author keywords

Head dependency; Hydro scheduling; Mixed integer quadratic programming

Indexed keywords

HYDRO SCHEDULING; HYDRO-SYSTEM; MIXED INTEGER QUADRATIC PROGRAMMING; NUMERICAL RESULTS; OPERATING REGIONS; RAMPING CONSTRAINT; REALISTIC MODELING;

EID: 72149121555     PISSN: 01968904     EISSN: None     Source Type: Journal    
DOI: 10.1016/j.enconman.2009.10.017     Document Type: Article
Times cited : (72)

References (27)
  • 1
    • 0029404086 scopus 로고
    • Hydro-dominated short-term hydrothermal scheduling via a hybrid simulation-optimisation approach: a case study
    • Soares S., and Ohishi T. Hydro-dominated short-term hydrothermal scheduling via a hybrid simulation-optimisation approach: a case study. IEE Proc-Gener Transm Distrib 142 6 (1995) 569-575
    • (1995) IEE Proc-Gener Transm Distrib , vol.142 , Issue.6 , pp. 569-575
    • Soares, S.1    Ohishi, T.2
  • 2
    • 33244473987 scopus 로고    scopus 로고
    • Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model
    • Catalão J.P.S., Mariano S.J.P.S., Mendes V.M.F., and Ferreira L.A.F.M. Parameterisation effect on the behaviour of a head-dependent hydro chain using a nonlinear model. Electr Power Syst Res 76 6-7 (2006) 404-412
    • (2006) Electr Power Syst Res , vol.76 , Issue.6-7 , pp. 404-412
    • Catalão, J.P.S.1    Mariano, S.J.P.S.2    Mendes, V.M.F.3    Ferreira, L.A.F.M.4
  • 5
    • 41749083510 scopus 로고    scopus 로고
    • A review on risk-constrained hydropower scheduling in deregulated power market
    • Hongling L., Chuanwen J., and Yan Z. A review on risk-constrained hydropower scheduling in deregulated power market. Renew Sust Energy Rev 12 5 (2008) 1465-1475
    • (2008) Renew Sust Energy Rev , vol.12 , Issue.5 , pp. 1465-1475
    • Hongling, L.1    Chuanwen, J.2    Yan, Z.3
  • 6
    • 38849083917 scopus 로고    scopus 로고
    • Optimising power generation efficiency for head-sensitive cascaded reservoirs in a competitive electricity market
    • Mariano S.J.P.S., Catalão J.P.S., Mendes V.M.F., and Ferreira L.A.F.M. Optimising power generation efficiency for head-sensitive cascaded reservoirs in a competitive electricity market. Int J Electr Power Energy Syst 30 2 (2008) 125-133
    • (2008) Int J Electr Power Energy Syst , vol.30 , Issue.2 , pp. 125-133
    • Mariano, S.J.P.S.1    Catalão, J.P.S.2    Mendes, V.M.F.3    Ferreira, L.A.F.M.4
  • 9
    • 0023399620 scopus 로고
    • Short-term generation scheduling of hydraulic multi-reservoir multi-area interconnected systems
    • Amado S.M., and Ribeiro C.C. Short-term generation scheduling of hydraulic multi-reservoir multi-area interconnected systems. IEEE Trans Power Syst PWRS-2 3 (1987) 758-763
    • (1987) IEEE Trans Power Syst , vol.PWRS-2 , Issue.3 , pp. 758-763
    • Amado, S.M.1    Ribeiro, C.C.2
  • 10
    • 0036474056 scopus 로고    scopus 로고
    • Optimal dispatch of generating units of the Itaipú hydroelectric plant
    • Arce A., Ohishi T., and Soares S. Optimal dispatch of generating units of the Itaipú hydroelectric plant. IEEE Trans Power Syst 17 1 (2002) 154-158
    • (2002) IEEE Trans Power Syst , vol.17 , Issue.1 , pp. 154-158
    • Arce, A.1    Ohishi, T.2    Soares, S.3
  • 12
    • 49849084222 scopus 로고    scopus 로고
    • Differential evolution technique-based short-term economic generation scheduling of hydrothermal systems
    • Mandal K.K., and Chakraborty N. Differential evolution technique-based short-term economic generation scheduling of hydrothermal systems. Electr Power Syst Res 78 11 (2008) 1972-1979
    • (2008) Electr Power Syst Res , vol.78 , Issue.11 , pp. 1972-1979
    • Mandal, K.K.1    Chakraborty, N.2
  • 13
    • 70350475533 scopus 로고    scopus 로고
    • A hybrid method for optimal scheduling of short-term electric power generation of cascaded hydroelectric plants based on particle swarm optimization and chance-constrained programming
    • Wu J.K., Zhu J.Q., Chen G.T., and Zhang H.L. A hybrid method for optimal scheduling of short-term electric power generation of cascaded hydroelectric plants based on particle swarm optimization and chance-constrained programming. IEEE Trans Power Syst 23 4 (2008) 1570-1579
    • (2008) IEEE Trans Power Syst , vol.23 , Issue.4 , pp. 1570-1579
    • Wu, J.K.1    Zhu, J.Q.2    Chen, G.T.3    Zhang, H.L.4
  • 14
    • 52949085448 scopus 로고    scopus 로고
    • Application of enhanced PSO approach to optimal scheduling of hydro system
    • Yuan X.H., Wang L., and Yuan Y.B. Application of enhanced PSO approach to optimal scheduling of hydro system. Energy Convers Manage 49 11 (2008) 2966-2972
    • (2008) Energy Convers Manage , vol.49 , Issue.11 , pp. 2966-2972
    • Yuan, X.H.1    Wang, L.2    Yuan, Y.B.3
  • 15
    • 54049151913 scopus 로고    scopus 로고
    • Hydrothermal scheduling using chaotic hybrid differential evolution
    • Yuan X.H., Cab B., Yang B., and Yuan Y.B. Hydrothermal scheduling using chaotic hybrid differential evolution. Energy Convers Manage 49 12 (2008) 3627-3633
    • (2008) Energy Convers Manage , vol.49 , Issue.12 , pp. 3627-3633
    • Yuan, X.H.1    Cab, B.2    Yang, B.3    Yuan, Y.B.4
  • 16
    • 11344285550 scopus 로고    scopus 로고
    • Short term hydroelectric scheduling combining network flow and interior point approaches
    • Oliveira A.R.L., Soares S., and Nepomuceno L. Short term hydroelectric scheduling combining network flow and interior point approaches. Int J Electr Power Energy Syst 27 2 (2005) 91-99
    • (2005) Int J Electr Power Energy Syst , vol.27 , Issue.2 , pp. 91-99
    • Oliveira, A.R.L.1    Soares, S.2    Nepomuceno, L.3
  • 18
    • 49249094152 scopus 로고    scopus 로고
    • An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir
    • Borghetti A., D'Ambrosio C., Lodi A., and Martello S. An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir. IEEE Trans Power Syst 23 3 (2008) 1115-1124
    • (2008) IEEE Trans Power Syst , vol.23 , Issue.3 , pp. 1115-1124
    • Borghetti, A.1    D'Ambrosio, C.2    Lodi, A.3    Martello, S.4
  • 19
    • 0036872146 scopus 로고    scopus 로고
    • Self-scheduling of a hydro producer in a pool-based electricity market
    • Conejo A.J., Arroyo J.M., Contreras J., and Villamor F.A. Self-scheduling of a hydro producer in a pool-based electricity market. IEEE Trans Power Syst 17 4 (2002) 1265-1272
    • (2002) IEEE Trans Power Syst , vol.17 , Issue.4 , pp. 1265-1272
    • Conejo, A.J.1    Arroyo, J.M.2    Contreras, J.3    Villamor, F.A.4
  • 20
    • 36849045754 scopus 로고    scopus 로고
    • Short-term hydropower production planning by stochastic programming
    • Fleten S.-E., and Kristoffersenb T.K. Short-term hydropower production planning by stochastic programming. Comput Operat Res 35 8 (2008) 2656-2671
    • (2008) Comput Operat Res , vol.35 , Issue.8 , pp. 2656-2671
    • Fleten, S.-E.1    Kristoffersenb, T.K.2
  • 21
    • 33947674280 scopus 로고    scopus 로고
    • Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market
    • García-González J., Parrilla E., and Mateo A. Risk-averse profit-based optimal scheduling of a hydro-chain in the day-ahead electricity market. Eur J Operat Res 181 3 (2007) 1354-1369
    • (2007) Eur J Operat Res , vol.181 , Issue.3 , pp. 1354-1369
    • García-González, J.1    Parrilla, E.2    Mateo, A.3
  • 23
    • 34248231120 scopus 로고    scopus 로고
    • Dynamic optimal power flow approach to account for consumer response in short term hydrothermal coordination studies
    • Uturbey W., and Simões Costa A. Dynamic optimal power flow approach to account for consumer response in short term hydrothermal coordination studies. IET Gener Transm Distrib 1 3 (2007) 414-421
    • (2007) IET Gener Transm Distrib , vol.1 , Issue.3 , pp. 414-421
    • Uturbey, W.1    Simões Costa, A.2
  • 24
    • 0033080313 scopus 로고    scopus 로고
    • Scheduling hydro power systems with restricted operating zones and discharge ramping constraints
    • Guan X., Svoboda A., and Li C.-A. Scheduling hydro power systems with restricted operating zones and discharge ramping constraints. IEEE Trans Power Syst 14 1 (1999) 126-131
    • (1999) IEEE Trans Power Syst , vol.14 , Issue.1 , pp. 126-131
    • Guan, X.1    Svoboda, A.2    Li, C.-A.3
  • 26
    • 34249299065 scopus 로고    scopus 로고
    • Short-term electricity prices forecasting in a competitive market: a neural network approach
    • Catalão J.P.S., Mariano S.J.P.S., Mendes V.M.F., and Ferreira L.A.F.M. Short-term electricity prices forecasting in a competitive market: a neural network approach. Electr Power Syst Res 77 10 (2007) 1297-1304
    • (2007) Electr Power Syst Res , vol.77 , Issue.10 , pp. 1297-1304
    • Catalão, J.P.S.1    Mariano, S.J.P.S.2    Mendes, V.M.F.3    Ferreira, L.A.F.M.4
  • 27
    • 33846266227 scopus 로고    scopus 로고
    • Forecasting electricity market pricing using artificial neural networks
    • Pao H.-T. Forecasting electricity market pricing using artificial neural networks. Energy Convers Manage 48 3 (2007) 907-912
    • (2007) Energy Convers Manage , vol.48 , Issue.3 , pp. 907-912
    • Pao, H.-T.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.