![]() |
Volumn 158, Issue 3, 2010, Pages 222-231
|
Solving symmetric mixed-model multi-level just-in-time scheduling problems
|
Author keywords
Dynamic programming; Level scheduling; Mixed model assembly lines; Output Rate Variation problem
|
Indexed keywords
COMPUTATIONAL STUDIES;
EXACT SOLUTION;
JUST IN TIME;
JUST-IN-TIME SCHEDULING;
MATHEMATICAL REPRESENTATIONS;
MIXED-MODEL ASSEMBLY LINES;
MULTI-LEVEL;
OUTPUT RATE;
OUTPUT RATE VARIATION PROBLEM;
PRODUCTION PROCESS;
PRODUCTION SCHEDULE;
SCHEDULING PROBLEM;
SOLUTION SEQUENCE;
ASSEMBLY;
ASSEMBLY MACHINES;
BIPED LOCOMOTION;
DYNAMIC PROGRAMMING;
SCHEDULING;
SYSTEMS ENGINEERING;
JUST IN TIME PRODUCTION;
|
EID: 71549134620
PISSN: 0166218X
EISSN: None
Source Type: Journal
DOI: 10.1016/j.dam.2009.09.013 Document Type: Article |
Times cited : (13)
|
References (10)
|