-
1
-
-
0034187336
-
Multimodularity, convexity and optimization properties
-
Altman, E., B. Gaujal, and A. Hordijk, "Multimodularity, convexity and optimization properties," Mathematics of Operations Research, 25, 324-347 (2000).
-
(2000)
Mathematics of Operations Research
, vol.25
, pp. 324-347
-
-
Altman, E.1
Gaujal, B.2
Hordijk, A.3
-
2
-
-
0001807517
-
The scheduling of maintenance service
-
Anily, S., C. A. Glass, and R. Hassin, "The scheduling of maintenance service," Discrete Applied Mathematics, 82, 27-42 (1998).
-
(1998)
Discrete Applied Mathematics
, vol.82
, pp. 27-42
-
-
Anily, S.1
Glass, C.A.2
Hassin, R.3
-
4
-
-
0036670971
-
Minimizing service and operation costs of periodic scheduling
-
Bar-Noy, A., R. Bhatia, J. Naor, and B. Schieber, "Minimizing service and operation costs of periodic scheduling," Mathematics of Operations Research, 27, 518-544 (2002).
-
(2002)
Mathematics of Operations Research
, vol.27
, pp. 518-544
-
-
Bar-Noy, A.1
Bhatia, R.2
Naor, J.3
Schieber, B.4
-
5
-
-
0030290247
-
A note on the relation between the product rate variation (PRV) and the apportionment problem
-
Bautista, J., R. Companys, and A. Corominas, "A note on the relation between the product rate variation (PRV) and the apportionment problem," Journal of Operational Research Society, 47, 1410-1414 (1996).
-
(1996)
Journal of Operational Research Society
, vol.47
, pp. 1410-1414
-
-
Bautista, J.1
Companys, R.2
Corominas, A.3
-
6
-
-
27144541092
-
Modelling and solving the production rate variation problem
-
Bautista, J., R. Companys, and A. Corominas, "Modelling and solving the production rate variation problem," TOP, 5(2), 221-239 (1997).
-
(1997)
TOP
, vol.5
, Issue.2
, pp. 221-239
-
-
Bautista, J.1
Companys, R.2
Corominas, A.3
-
7
-
-
22044439833
-
On the complexity of high-multiplicity scheduling problems
-
Brauner, N., Y. Crama, A. Grigoriev, and J. Van de Klundert, "On the complexity of high-multiplicity scheduling problems," Journal of Combinatorial Optimization, 9(3), 313-323 (2005).
-
(2005)
Journal of Combinatorial Optimization
, vol.9
, Issue.3
, pp. 313-323
-
-
Brauner, N.1
Crama, Y.2
Grigoriev, A.3
Van de Klundert, J.4
-
8
-
-
0031623982
-
Time slot allocation for real-time messages with negotiable distance constrains requirements
-
RTAS, Denver, CO 1998
-
Dong, L., R. Melhem, and D. Mosse, "Time slot allocation for real-time messages with negotiable distance constrains requirements," in: Proceedings of The Real-Time Technology and Application Symposium, RTAS, Denver, CO (1998).
-
Proceedings of The Real-Time Technology and Application Symposium
-
-
Dong, L.1
Melhem, R.2
Mosse, D.3
-
9
-
-
0024640804
-
A probabilistic heuristic for a computationally difficult set covering problem
-
Feo, T. and M. Resende, "A probabilistic heuristic for a computationally difficult set covering problem," Operations Research Letters, 8, 6771 (1989).
-
(1989)
Operations Research Letters
, vol.8
, pp. 6771
-
-
Feo, T.1
Resende, M.2
-
10
-
-
22044443657
-
High Multiplicity Scheduling Problems,
-
Ph.D. Thesis, Maastricht University, Maastricht, Netherlands
-
Grigoriev, A., "High Multiplicity Scheduling Problems," Ph.D. Thesis, Maastricht University, Maastricht, Netherlands (2003).
-
(2003)
-
-
Grigoriev, A.1
-
11
-
-
0001307328
-
Distance-constrained scheduling and its applications in real-time systems
-
Han, C. C., K. J. Lin, and C. J. Hou, "Distance-constrained scheduling and its applications in real-time systems," IEEE Transactions on Computers, 45(7), 814-826 (1996).
-
(1996)
IEEE Transactions on Computers
, vol.45
, Issue.7
, pp. 814-826
-
-
Han, C.C.1
Lin, K.J.2
Hou, C.J.3
-
12
-
-
0025868004
-
A note on level schedules for mixed-model assembly lines in just-in-time production systems
-
Kubiak, W. and S. P. Sethi, "A note on level schedules for mixed-model assembly lines in just-in-time production systems," Management Science, 37, 121-122(1991).
-
(1991)
Management Science
, vol.37
, pp. 121-122
-
-
Kubiak, W.1
Sethi, S.P.2
-
13
-
-
0027595182
-
Minimizing variations of productions rates in just-in-time systems: A survey
-
Kubiak, W., "Minimizing variations of productions rates in just-in-time systems: A survey," European Journal of Operational Research, 66, 259-271 (1993).
-
(1993)
European Journal of Operational Research
, vol.66
, pp. 259-271
-
-
Kubiak, W.1
-
15
-
-
33847266884
-
Fair sequences
-
Joseph Y.-T. Leung ed, Chapman and Hall/CRC
-
Kubiak, W. "Fair sequences," in: Joseph Y.-T. Leung (ed.), Handbook of Scheduling: Algorithms, Models, and Performance Analysis, Chapman and Hall/CRC (2004).
-
(2004)
Handbook of Scheduling: Algorithms, Models, and Performance Analysis
-
-
Kubiak, W.1
-
16
-
-
0003449926
-
-
Industrial Engineering and Management Press, Norcross, GA
-
Monden, Y., Toyota Production Systems. Industrial Engineering and Management Press, Norcross, GA (1983).
-
(1983)
Toyota Production Systems
-
-
Monden, Y.1
-
17
-
-
27144549096
-
Solving the product rate variation problem (PRVP) of large dimensions as an assignment problem,
-
Doctoral Thesis, DOE, UPC
-
Moreno, N., "Solving the product rate variation problem (PRVP) of large dimensions as an assignment problem," Doctoral Thesis, DOE, UPC (2002).
-
(2002)
-
-
Moreno, N.1
-
18
-
-
0027614669
-
Level schedules for mixed-model, just-in-time processes
-
Steiner, G. and S. Yeomans, "Level schedules for mixed-model, just-in-time processes," Management Science, 39(6), 728-735 (1993).
-
(1993)
Management Science
, vol.39
, Issue.6
, pp. 728-735
-
-
Steiner, G.1
Yeomans, S.2
-
19
-
-
33847278970
-
-
Waldspurger, C. A. and W. E. Weihl, Stride scheduling: Deterministic proportional-share resource management. Technical Memorandum MIT/LCS/TM-528 MIT Laboratory for Computer Science Cambridge, MA 02139 (1995).
-
Waldspurger, C. A. and W. E. Weihl, Stride scheduling: Deterministic proportional-share resource management. Technical Memorandum MIT/LCS/TM-528 MIT Laboratory for Computer Science Cambridge, MA 02139 (1995).
-
-
-
|