메뉴 건너뛰기




Volumn 10, Issue 2, 2007, Pages 97-110

Response time variability

Author keywords

Combinatorial optimisation; Heuristics; Isochronous applications; Mixed model assembly lines; Response time variability

Indexed keywords

COMBINATORIAL OPTIMIZATION; ISOCHRONOUS APPLICATIONS; MIXED MODEL ASSEMBLY LINES; RESPONSE TIME VARIABILITY;

EID: 33847311436     PISSN: 10946136     EISSN: None     Source Type: Journal    
DOI: 10.1007/s10951-006-0002-8     Document Type: Article
Times cited : (33)

References (19)
  • 5
    • 0030290247 scopus 로고    scopus 로고
    • A note on the relation between the product rate variation (PRV) and the apportionment problem
    • Bautista, J., R. Companys, and A. Corominas, "A note on the relation between the product rate variation (PRV) and the apportionment problem," Journal of Operational Research Society, 47, 1410-1414 (1996).
    • (1996) Journal of Operational Research Society , vol.47 , pp. 1410-1414
    • Bautista, J.1    Companys, R.2    Corominas, A.3
  • 6
    • 27144541092 scopus 로고    scopus 로고
    • Modelling and solving the production rate variation problem
    • Bautista, J., R. Companys, and A. Corominas, "Modelling and solving the production rate variation problem," TOP, 5(2), 221-239 (1997).
    • (1997) TOP , vol.5 , Issue.2 , pp. 221-239
    • Bautista, J.1    Companys, R.2    Corominas, A.3
  • 9
    • 0024640804 scopus 로고
    • A probabilistic heuristic for a computationally difficult set covering problem
    • Feo, T. and M. Resende, "A probabilistic heuristic for a computationally difficult set covering problem," Operations Research Letters, 8, 6771 (1989).
    • (1989) Operations Research Letters , vol.8 , pp. 6771
    • Feo, T.1    Resende, M.2
  • 10
    • 22044443657 scopus 로고    scopus 로고
    • High Multiplicity Scheduling Problems,
    • Ph.D. Thesis, Maastricht University, Maastricht, Netherlands
    • Grigoriev, A., "High Multiplicity Scheduling Problems," Ph.D. Thesis, Maastricht University, Maastricht, Netherlands (2003).
    • (2003)
    • Grigoriev, A.1
  • 11
    • 0001307328 scopus 로고    scopus 로고
    • Distance-constrained scheduling and its applications in real-time systems
    • Han, C. C., K. J. Lin, and C. J. Hou, "Distance-constrained scheduling and its applications in real-time systems," IEEE Transactions on Computers, 45(7), 814-826 (1996).
    • (1996) IEEE Transactions on Computers , vol.45 , Issue.7 , pp. 814-826
    • Han, C.C.1    Lin, K.J.2    Hou, C.J.3
  • 12
    • 0025868004 scopus 로고
    • A note on level schedules for mixed-model assembly lines in just-in-time production systems
    • Kubiak, W. and S. P. Sethi, "A note on level schedules for mixed-model assembly lines in just-in-time production systems," Management Science, 37, 121-122(1991).
    • (1991) Management Science , vol.37 , pp. 121-122
    • Kubiak, W.1    Sethi, S.P.2
  • 13
    • 0027595182 scopus 로고
    • Minimizing variations of productions rates in just-in-time systems: A survey
    • Kubiak, W., "Minimizing variations of productions rates in just-in-time systems: A survey," European Journal of Operational Research, 66, 259-271 (1993).
    • (1993) European Journal of Operational Research , vol.66 , pp. 259-271
    • Kubiak, W.1
  • 16
    • 0003449926 scopus 로고
    • Industrial Engineering and Management Press, Norcross, GA
    • Monden, Y., Toyota Production Systems. Industrial Engineering and Management Press, Norcross, GA (1983).
    • (1983) Toyota Production Systems
    • Monden, Y.1
  • 17
    • 27144549096 scopus 로고    scopus 로고
    • Solving the product rate variation problem (PRVP) of large dimensions as an assignment problem,
    • Doctoral Thesis, DOE, UPC
    • Moreno, N., "Solving the product rate variation problem (PRVP) of large dimensions as an assignment problem," Doctoral Thesis, DOE, UPC (2002).
    • (2002)
    • Moreno, N.1
  • 18
    • 0027614669 scopus 로고
    • Level schedules for mixed-model, just-in-time processes
    • Steiner, G. and S. Yeomans, "Level schedules for mixed-model, just-in-time processes," Management Science, 39(6), 728-735 (1993).
    • (1993) Management Science , vol.39 , Issue.6 , pp. 728-735
    • Steiner, G.1    Yeomans, S.2
  • 19
    • 33847278970 scopus 로고    scopus 로고
    • Waldspurger, C. A. and W. E. Weihl, Stride scheduling: Deterministic proportional-share resource management. Technical Memorandum MIT/LCS/TM-528 MIT Laboratory for Computer Science Cambridge, MA 02139 (1995).
    • Waldspurger, C. A. and W. E. Weihl, Stride scheduling: Deterministic proportional-share resource management. Technical Memorandum MIT/LCS/TM-528 MIT Laboratory for Computer Science Cambridge, MA 02139 (1995).


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.