-
1
-
-
0025412981
-
"Least-squares parameter estimation for Muskingum routing"
-
JHEND80733-9429, 10.1061/(ASCE)0733-9429(1990)116:4(580)
-
Aldama, A. A. (1990). "Least-squares parameter estimation for Muskingum routing." J. Hydraul. Eng. JHEND80733-9429, 116, 580-586. 10.1061/(ASCE)0733-9429(1990)116:4(580)
-
(1990)
J. Hydraul. Eng.
, vol.116
, pp. 580-586
-
-
Aldama, A.A.1
-
2
-
-
77957597180
-
-
China WaterPower, Beijing (in Chinese)
-
Bao, W. M. (2006). Hydrological forecasting, China WaterPower, Beijing, 92-137 (in Chinese).
-
(2006)
Hydrological Forecasting
, pp. 92-137
-
-
Bao, W.M.1
-
3
-
-
38549128487
-
"Study on stage routing model of tidal reach"
-
JHEND80733-9429 (in Chinese)
-
Bao, W. M., and Bian, Y. M. (1997). "Study on stage routing model of tidal reach." J. Hydraul. Eng. JHEND80733-9429, 11, 34-38 (in Chinese).
-
(1997)
J. Hydraul. Eng.
, vol.11
, pp. 34-38
-
-
Bao, W.M.1
Bian, Y.M.2
-
4
-
-
38549181974
-
-
IAHS, Wallingford, U.K
-
Bao, W. M., Zhao, C., Wang, H., and Qu, S. M. (2007). Application of bi-directional stage routing model in a tidal reach, IAHS, Wallingford, U.K., 46-52.
-
(2007)
Application of Bi-directional Stage Routing Model in a Tidal Reach
, pp. 46-52
-
-
Bao, W.M.1
Zhao, C.2
Wang, H.3
Qu, S.M.4
-
5
-
-
0037199342
-
"Muskingum river routing with dynamic bank storage"
-
JHYDA70022-1694 10.1016/S0022-1694(02)00068-9
-
Birkhead, A. L., and James, C. S. (2002). "Muskingum river routing with dynamic bank storage." J. Hydrol. JHYDA70022-1694, 264, 113-132. 10.1016/S0022-1694(02)00068-9
-
(2002)
J. Hydrol.
, vol.264
, pp. 113-132
-
-
Birkhead, A.L.1
James, C.S.2
-
6
-
-
0032722662
-
"Forecasting river flow rate during low-flow periods using neural networks"
-
WRERAQ0043-1397 10.1029/1999WR900205
-
Campolo, M., Soldati, A., and Andreussi, P. (1999). "Forecasting river flow rate during low-flow periods using neural networks." Water Resour. Res. WRERAQ0043-1397, 35, 3547-3552. 10.1029/1999WR900205
-
(1999)
Water Resour. Res.
, vol.35
, pp. 47-52
-
-
Campolo, M.1
Soldati, A.2
Andreussi, P.3
-
7
-
-
0037428019
-
"Estuary water-stage forecasting by using radial basis function neural network"
-
JHYDA70022-1694, 10.1016/S0022-1694(02)00289-5
-
Chang, F. J., and Chen, Y. C. (2003). "Estuary water-stage forecasting by using radial basis function neural network." J. Hydrol. JHYDA70022-1694, 270, 158-166. 10.1016/S0022-1694(02)00289-5
-
(2003)
J. Hydrol.
, vol.270
, pp. 158-166
-
-
Chang, F.J.1
Chen, Y.C.2
-
8
-
-
33748929857
-
"Particle swarm optimization training algorithm for ANNs in stage prediction of Shing Mun River"
-
JHYDA70022-1694 10.1016/j.jhydrol.2006.02.025
-
Chau, K. W. (2006). "Particle swarm optimization training algorithm for ANNs in stage prediction of Shing Mun River." J. Hydrol. JHYDA70022-1694, 329, 363-367. 10.1016/j.jhydrol.2006.02.025
-
(2006)
J. Hydrol.
, vol.329
, pp. 363-367
-
-
Chau, K.W.1
-
9
-
-
27544472438
-
"Comparison of several flood forecasting models in Yangtze River"
-
JHYEFF1084-0699 10.1061/(ASCE)1084-0699(2005)10:6(485)
-
Chau, K. W., Wu, C. L., and Li, Y. S. (2001). "Comparison of several flood forecasting models in Yangtze River." J. Hydrol. Eng. JHYEFF1084-0699, 10(6), 485-491. 10.1061/(ASCE)1084-0699(2005)10:6(485)
-
(2001)
J. Hydrol. Eng.
, vol.10
, Issue.6
, pp. 485-491
-
-
Chau, K.W.1
Wu, C.L.2
Li, Y.S.3
-
10
-
-
70549100854
-
"Research on hydrodynamic influence to Jiaojiang River estuary for taking sand from Linhai-Jiaojiang Bridge reach"
-
(in Chinese)
-
Chen, P. Y., Huang, S. C., Hu, J. C., and Gao, H. C. (2007). "Research on hydrodynamic influence to Jiaojiang River estuary for taking sand from Linhai-Jiaojiang Bridge reach." Zhejiang Hydrotechnics., 4, 11-13 (in Chinese).
-
(2007)
Zhejiang Hydrotechnics.
, vol.4
, pp. 11-13
-
-
Chen, P.Y.1
Huang, S.C.2
Hu, J.C.3
Gao, H.C.4
-
11
-
-
70549086576
-
"The application of upper reach discharge peak superposition method in multi-tributary river"
-
ZZZZZZ1000-0860
-
Chen, S. L. (2000). "The application of upper reach discharge peak superposition method in multi-tributary river." Water Resour. Hydropower Eng. (Beijing) ZZZZZZ1000-0860, 1, 6-9.
-
(2000)
Water Resour. Hydropower Eng. (Beijing)
, vol.1
, pp. 6-9
-
-
Chen, S.L.1
-
12
-
-
0037199737
-
"An efficient method of discharge measurement in tidal streams"
-
JHYDA70022-1694 10.1016/S0022-1694(02)00100-2
-
Chen, Y. C., and Chiu, C. L. (2002). "An efficient method of discharge measurement in tidal streams." J. Hydrol. JHYDA70022-1694, 265, 212-224. 10.1016/S0022-1694(02)00100-2
-
(2002)
J. Hydrol.
, vol.265
, pp. 212-224
-
-
Chen, Y.C.1
Chiu, C.L.2
-
13
-
-
0035664597
-
"Fuzzy iteration methodology for reservoir flood control operation"
-
JWRAF51093-474X 10.1111/j.1752-1688.2001.tb03646.x
-
Cheng, C. T., and Chau, K. W. (2001). "Fuzzy iteration methodology for reservoir flood control operation." J. Am. Water Resour. Assoc. JWRAF51093-474X, 37, 1381-1388. 10.1111/j.1752-1688.2001.tb03646.x
-
(2001)
J. Am. Water Resour. Assoc.
, vol.37
, pp. 1381-1388
-
-
Cheng, C.T.1
Chau, K.W.2
-
14
-
-
26844569500
-
"Long-term prediction of discharges in Manwan Hydropower using adaptive-network-based fuzzy inference systems models"
-
LNCSD90302-9743
-
Cheng, C. T., Lin, J. Y., Sun, Y. G., and Chau, K. W. (2005). "Long-term prediction of discharges in Manwan Hydropower using adaptive-network-based fuzzy inference systems models." Lect. Notes Comput. Sci. LNCSD90302-9743, 3612, 1152-1161.
-
(2005)
Lect. Notes Comput. Sci.
, vol.3612
, pp. 1152-1161
-
-
Cheng, C.T.1
Lin, J.Y.2
Sun, Y.G.3
Chau, K.W.4
-
15
-
-
70549088878
-
"Discussion on the application of combined-discharge forecasting method at Liujiahe gauging in Beiluo River"
-
Duan, Q. S. (2005). "Discussion on the application of combined-discharge forecasting method at Liujiahe gauging in Beiluo River." J. of Yanan University, 24, 75-78.
-
(2005)
J. of Yanan University
, vol.24
, pp. 75-78
-
-
Duan, Q.S.1
-
16
-
-
0028667768
-
"A flood routing Muskingum type simulation and forecasting model based on level data alone"
-
WRERAQ0043-1397 10.1029/94WR00536
-
Franchini, M., and Lamberti, P. (1994). "A flood routing Muskingum type simulation and forecasting model based on level data alone." Water Resour. Res. WRERAQ0043-1397, 30, 2183-2196. 10.1029/94WR00536
-
(1994)
Water Resour. Res.
, vol.30
, pp. 2183-2196
-
-
Franchini, M.1
Lamberti, P.2
-
17
-
-
0027062075
-
"Numerical solution of Muskingum equation"
-
JHEND80733-9429 10.1061/(ASCE)0733-9429(1992)118:5(804)
-
Gill, M. A. (1992). "Numerical solution of Muskingum equation." J. Hydraul. Eng. JHEND80733-9429, 118, 804-809. 10.1061/ (ASCE)0733-9429(1992)118:5(804)
-
(1992)
J. Hydraul. Eng.
, vol.118
, pp. 804-809
-
-
Gill, M.A.1
-
18
-
-
0029413797
-
"Artificial neural network modeling of the rainfall-runoff process"
-
WRERAQ0043-1397 10.1029/95WR01955
-
Hsu, K. L., Gupta, H. V., and Sorooshian, S. (1995). "Artificial neural network modeling of the rainfall-runoff process." Water Resour. Res. WRERAQ0043-1397, 31, 2517-2530. 10.1029/95WR01955
-
(1995)
Water Resour. Res.
, vol.31
, pp. 2517-2530
-
-
Hsu, K.L.1
Gupta, H.V.2
Sorooshian, S.3
-
19
-
-
70549086575
-
"The application of water-stage routing model in water-stage routing"
-
(in Chinese)
-
Huang, G. R., Zhu, Q. P., Ma, J., and Rui, X. F. (1999). "The application of water-stage routing model in water-stage routing." Hydrology in China., 2, 1-5 (in Chinese).
-
(1999)
Hydrology in China
, vol.2
, pp. 1-5
-
-
Huang, G.R.1
Zhu, Q.P.2
Ma, J.3
Rui, X.F.4
-
20
-
-
33746830757
-
"Using support vector machines for long-term discharge prediction"
-
HSJODN0262-6667 10.1623/hysj.51.4.599
-
Lin, J. Y., Cheng, C. T., and Chau, K. W. (2006). "Using support vector machines for long-term discharge prediction." Hydrol. Sci. J. HSJODN0262-6667, 51, 599-612. 10.1623/hysj.51.4.599
-
(2006)
Hydrol. Sci. J.
, vol.51
, pp. 599-612
-
-
Lin, J.Y.1
Cheng, C.T.2
Chau, K.W.3
-
21
-
-
0019227937
-
"Some notes of Muskingum method of flood routing"
-
JHYDA70022-1694 10.1016/0022-1694(80)90125-0
-
Singh, V. P., and Mccann, R. C. (1980). "Some notes of Muskingum method of flood routing." J. Hydrol. JHYDA70022-1694, 48, 343-361. 10.1016/0022-1694(80)90125-0
-
(1980)
J. Hydrol.
, vol.48
, pp. 343-361
-
-
Singh, V.P.1
Mccann, R.C.2
-
22
-
-
70549088876
-
"Comparison of runoff forecasting methods in multi-tributary river"
-
(in Chinese)
-
Wang, R., Xia, J., Zhang, X., Liu, X., Li, L., and Tang, R. L. (2007a). "Comparison of runoff forecasting methods in multi-tributary river." Yellow River., 29, 29-32 (in Chinese).
-
(2007)
Yellow River.
, vol.29
, pp. 29-32
-
-
Wang, R.1
Xia, J.2
Zhang, X.3
Liu, X.4
Li, L.5
Tang, R.L.6
-
23
-
-
70549096821
-
"Comments on sensitivity analysis, calibration of distributed hydrological model"
-
NRJOAB0028-0739 (in Chinese)
-
Wang, Z. G., Xia, J., Liu, C. M., Ou, C. P., and Zhang, Y. Y. (2007b). "Comments on sensitivity analysis, calibration of distributed hydrological model." Nat. Resour. J. NRJOAB0028-0739, 22, 649-655 (in Chinese).
-
(2007)
Nat. Resour. J.
, vol.22
, pp. 649-655
-
-
Wang, Z.G.1
Xia, J.2
Liu, C.M.3
Ou, C.P.4
Zhang, Y.Y.5
-
24
-
-
70549093894
-
"Discussion on some problems of combined-discharge flood forecasting scheme"
-
(in Chinese)
-
Wu, C. Z., Zhang, S. G., and Zhou, Y. H. (1996). "Discussion on some problems of combined-discharge flood forecasting scheme." Hydrology in China., 2, 33-37 (in Chinese).
-
(1996)
Hydrology in China.
, vol.2
, pp. 33-37
-
-
Wu, C.Z.1
Zhang, S.G.2
Zhou, Y.H.3
-
25
-
-
70549112878
-
"Application of generic threshold auto-regressive model to water-stage forecasting for tidal river section"
-
(in Chinese)
-
Wu, L. L., and Zhang, W. (2005). "Application of generic threshold auto-regressive model to water-stage forecasting for tidal river section." Advances in Science and Technology of Water Resources., 25, 20-23 (in Chinese).
-
(2005)
Advances in Science and Technology of Water Resources.
, vol.25
, pp. 20-23
-
-
Wu, L.L.1
Zhang, W.2
-
26
-
-
70549090893
-
"Flood forecasting using multiple sources regression corresponding water stage method based on virtual stage-discharge curve"
-
ZZZZZZ1000-0860 (in Chinese)
-
Zhang, D. W., and Li, S. Q. (1993). "Flood forecasting using multiple sources regression corresponding water stage method based on virtual stage-discharge curve." Water Resour. Hydropower Eng. (Beijing) ZZZZZZ1000-0860, 5, 13-16 (in Chinese).
-
(1993)
Water Resour. Hydropower Eng. (Beijing)
, vol.5
, pp. 13-16
-
-
Zhang, D.W.1
Li, S.Q.2
-
27
-
-
34248647927
-
"Real-time forecasting method based on 1D unsteady channel flow"
-
ZZZZZZ1001-6058 (in Chinese)
-
Zhang, X. F., and Mu, J. B. (2005). "Real-time forecasting method based on 1D unsteady channel flow." J. Hydrodynam. ZZZZZZ1001-6058, 20, 400-404 (in Chinese).
-
(2005)
J. Hydrodynam.
, vol.20
, pp. 400-404
-
-
Zhang, X.F.1
Mu, J.B.2
|