메뉴 건너뛰기




Volumn 47, Issue 22, 2009, Pages 6397-6416

Modelling and integration of customer flexibility in the order commitment process for high mix low volume production

Author keywords

Flexibility; Mass customisation; Order commitment

Indexed keywords

CUSTOMER FLEXIBILITY; CUSTOMER ORDERS; CUSTOMER REQUIREMENTS; DELIVERY LEAD TIME; DELIVERY SCHEDULES; DEMAND AND SUPPLY; DEMAND-SIDE; DYNAMIC DEMAND; FLEXIBILITY; HIGH MIX; INDIVIDUAL CUSTOMERS; LOW ORDER; LOW-VOLUME PRODUCTION; MANUFACTURING FIRMS; MANUFACTURING FLEXIBILITY; MANUFACTURING INDUSTRIES; MASS CUSTOMISATION; ORDER COMMITMENT; PRODUCT ATTRIBUTES; PRODUCT MIX; PRODUCT VARIETY; PROGRAMMING MODELS; SOLUTION SPACE;

EID: 70449597997     PISSN: 00207543     EISSN: 1366588X     Source Type: Journal    
DOI: 10.1080/00207540802266474     Document Type: Article
Times cited : (38)

References (42)
  • 2
    • 33748586784 scopus 로고    scopus 로고
    • Quality in electronic commerce B2C: Perceptions, expectations and importance
    • Alzola, L.M. and Robaina, V.P., 2006. Quality in electronic commerce B2C: perceptions, expectations and importance. The Service Industries Journal, 26 (6), 671-687.
    • (2006) The Service Industries Journal , vol.26 , Issue.6 , pp. 671-687
    • Alzola, L.M.1    Robaina, V.P.2
  • 3
    • 4344608140 scopus 로고    scopus 로고
    • Configurable offers and winner determination in multiattribute auctions
    • Bichler, M. and Kalagnanam, J., 2005. Configurable offers and winner determination in multiattribute auctions. European Journal of Operational Research, 160 (2), 380-394.
    • (2005) European Journal of Operational Research , vol.160 , Issue.2 , pp. 380-394
    • Bichler, M.1    Kalagnanam, J.2
  • 5
    • 0035730939 scopus 로고    scopus 로고
    • Quantity and due date quoting available to promise
    • Chen, C., Zhao, Z., and Ball, M.O., 2001. Quantity and due date quoting available to promise. Information Systems Frontiers, 3 (4), 477-488.
    • (2001) Information Systems Frontiers , vol.3 , Issue.4 , pp. 477-488
    • Chen, C.1    Zhao, Z.2    Ball, M.O.3
  • 6
    • 0033097505 scopus 로고    scopus 로고
    • A probabilistic design model for achieving flexibility in design
    • Chen, W. and Yuan, C., 1999. A probabilistic design model for achieving flexibility in design. Journal of Mechanical Design, 121 (1), 77-83.
    • (1999) Journal of Mechanical Design , vol.121 , Issue.1 , pp. 77-83
    • Chen, W.1    Yuan, C.2
  • 9
    • 0000048723 scopus 로고
    • Remarks on the analytic hierarchy process
    • Dyer, J.S., 1990. Remarks on the analytic hierarchy process. Management Science, 36 (3), 249-258.
    • (1990) Management Science , vol.36 , Issue.3 , pp. 249-258
    • Dyer, J.S.1
  • 10
    • 0037118177 scopus 로고    scopus 로고
    • A survey of the state-of-the-art of common due date assignment and scheduling research
    • DOI 10.1016/S0377-2217(01)00181-3, PII S0377221701001813
    • Gordon, V., Proth, J., and Chu, C., 2002. A survey of the state-of-the-art of common due date assignment and scheduling research. European Journal of Operational Research, 139 (1), 1-25. (Pubitemid 34153934)
    • (2002) European Journal of Operational Research , vol.139 , Issue.1 , pp. 1-25
    • Gordon, V.1    Proth, J.-M.2    Chu, C.3
  • 11
    • 0011143776 scopus 로고
    • Preference measurement of item collections
    • (Nov)
    • Green, P.E. and Jain, A.K., 1972. Preference measurement of item collections. Journal of Marketing Research, 9 (Nov), 371-377.
    • (1972) Journal of Marketing Research , vol.9 , pp. 371-377
    • Green, P.E.1    Jain, A.K.2
  • 12
    • 0030171787 scopus 로고    scopus 로고
    • Individualised hybrid models for conjoint analysis
    • Green, P.E. and Krieger, A.M., 1996. Individualised hybrid models for conjoint analysis. Management Science, 42 (6), 850-867.
    • (1996) Management Science , vol.42 , Issue.6 , pp. 850-867
    • Green, P.E.1    Krieger, A.M.2
  • 16
    • 0034275944 scopus 로고    scopus 로고
    • Quoting manufacturing due dates subject to a service level constraint
    • Hopp, W.J. and Sturgis, M.L.R., 2000. Quoting manufacturing due dates subject to a service level constraint. IIE Transactions, 32 (9), 771-784.
    • (2000) IIE Transactions , vol.32 , Issue.9 , pp. 771-784
    • Hopp, W.J.1    Sturgis, M.L.R.2
  • 17
    • 14944368645 scopus 로고    scopus 로고
    • Structural flexibility: A new perspective on the design of manufacturing and service operations
    • Iravani, S.M., Oyen, M.P.V., and Sims, K.T., 2005. Structural flexibility: a new perspective on the design of manufacturing and service operations. Management Science, 51 (2), 151-166.
    • (2005) Management Science , vol.51 , Issue.2 , pp. 151-166
    • Iravani, S.M.1    Oyen, M.P.V.2    Sims, K.T.3
  • 18
    • 0036642989 scopus 로고    scopus 로고
    • An available-to-promise system for TFT LCD manufacturing in supply chain
    • Jeong, B. et al., 2002. An available-to-promise system for TFT LCD manufacturing in supply chain. Computers and Industrial Engineering, 43 (1), 191-212.
    • (2002) Computers and Industrial Engineering , vol.43 , Issue.1 , pp. 191-212
    • Jeong, B.1
  • 19
    • 0034467625 scopus 로고    scopus 로고
    • Generic bill-of-materials-and-operations for high-variety production management
    • Jiao, J. et al., 2000. Generic bill-of-materials-and-operations for high-variety production management. Concurrent Engineering-Research & Applications, 8 (4), 297-321.
    • (2000) Concurrent Engineering-Research & Applications , vol.8 , Issue.4 , pp. 297-321
    • Jiao, J.1
  • 20
    • 3543130038 scopus 로고
    • The zone of tolerance: Exploring the relationship between service transactions and satisfaction with the overall service
    • Johnston, R., 1995. The zone of tolerance: exploring the relationship between service transactions and satisfaction with the overall service. International Journal of Service Industry Management, 6 (2), 46-61.
    • (1995) International Journal of Service Industry Management , vol.6 , Issue.2 , pp. 46-61
    • Johnston, R.1
  • 21
    • 1942453927 scopus 로고    scopus 로고
    • An optimised ATP (available-to-promise) system for make-to-order company in supply chain environment
    • Jung, H. et al., 2003. An optimised ATP (available-to-promise) system for make-to-order company in supply chain environment. International Journal of Industrial Engineering, 10 (4), 367-374.
    • (2003) International Journal of Industrial Engineering , vol.10 , Issue.4 , pp. 367-374
    • Jung, H.1
  • 23
    • 0001389628 scopus 로고
    • The economics of product variety: A survey
    • Lancaster, K., 1990. The economics of product variety: a survey. Marketing Science, 9 (3), 189-206.
    • (1990) Marketing Science , vol.9 , Issue.3 , pp. 189-206
    • Lancaster, K.1
  • 24
    • 0029393210 scopus 로고
    • Estimating flowtimes and setting due-dates in complex production systems
    • Lawrence, S.R., 1995. Estimating flowtimes and setting due-dates in complex production systems. IIE Transactions, 27 (5), 657-668.
    • (1995) IIE Transactions , vol.27 , Issue.5 , pp. 657-668
    • Lawrence, S.R.1
  • 26
    • 1542389306 scopus 로고
    • Simultaneous conjoint measurement: A new type of fundamental measurement
    • Luce, R.D. and Tukey, J.W., 1964. Simultaneous conjoint measurement: a new type of fundamental measurement. Journal of Mathematical Psychology, 1 (1), 1-27.
    • (1964) Journal of Mathematical Psychology , vol.1 , Issue.1 , pp. 1-27
    • Luce, R.D.1    Tukey, J.W.2
  • 27
    • 0033096959 scopus 로고    scopus 로고
    • Due date demand management: Negotiating the trade-off between price and delivery
    • Moodie, D.R. and Bobrowski, P.M., 1999. Due date demand management: negotiating the trade-off between price and delivery. International Journal of Production Research, 37 (5), 997-1021.
    • (1999) International Journal of Production Research , vol.37 , Issue.5 , pp. 997-1021
    • Moodie, D.R.1    Bobrowski, P.M.2
  • 28
    • 0031102504 scopus 로고    scopus 로고
    • Capacity driven due date settings in make-to-order production systems
    • Özdamar, L. and Yazgaç, T., 1997. Capacity driven due date settings in make-to-order production systems. International Journal of Production Economics, 49 (1), 29-44.
    • (1997) International Journal of Production Economics , vol.49 , Issue.1 , pp. 29-44
    • Özdamar, L.1    Yazgaç, T.2
  • 29
    • 9544231676 scopus 로고    scopus 로고
    • Advanced available-to-promise: Classification, selected methods and requirements for operations and inventory management
    • Pibernik, R., 2005. Advanced available-to-promise: classification, selected methods and requirements for operations and inventory management. International Journal of Production Economics, 93-94 (1), 239-252.
    • (2005) International Journal of Production Economics , vol.93-94 , Issue.1 , pp. 239-252
    • Pibernik, R.1
  • 30
    • 0026108291 scopus 로고
    • Relation between MILP modelling and logical inference for process synthesis
    • Raman, R. and Grossmann, I.E., 1991. Relation between MILP modelling and logical inference for process synthesis. Computers and Chemical Engineering, 15 (2), 73-84.
    • (1991) Computers and Chemical Engineering , vol.15 , Issue.2 , pp. 73-84
    • Raman, R.1    Grossmann, I.E.2
  • 35
    • 0000381501 scopus 로고
    • A formal method for subjective design evaluation with multiple attributes
    • Thurston, D., 1991. A formal method for subjective design evaluation with multiple attributes. Research in Engineering Design, 3 (2), 105-122.
    • (1991) Research in Engineering Design , vol.3 , Issue.2 , pp. 105-122
    • Thurston, D.1
  • 37
    • 84968118669 scopus 로고
    • The management of manufacturing flexibility
    • Upton, D.M., 1994. The management of manufacturing flexibility. California Management Review, 36 (2), 72-89.
    • (1994) California Management Review , vol.36 , Issue.2 , pp. 72-89
    • Upton, D.M.1
  • 38
    • 0031197670 scopus 로고    scopus 로고
    • Process Range in manufacturing: An empirical study of flexibility
    • Upton, D.M., 1997. Process Range in manufacturing: an empirical study of flexibility. Management Science, 43 (8), 1079-1092.
    • (1997) Management Science , vol.43 , Issue.8 , pp. 1079-1092
    • Upton, D.M.1
  • 39
    • 3142757956 scopus 로고    scopus 로고
    • Aggregation - The key to integrated production planning and scheduling
    • Vá ncza, J. and Kis, T., 2004. Aggregation - the key to integrated production planning and scheduling. CIRP Annuals, 53 (1), 377-379.
    • (2004) CIRP Annuals , vol.53 , Issue.1 , pp. 377-379
    • Váncza, J.1    Kis, T.2
  • 41
    • 0346503086 scopus 로고    scopus 로고
    • WebATP: A web-based flexible available-to-promise computation system
    • Xiong, M.H., Tor, S.B., and Khoo, L.P., 2003. WebATP: a web-based flexible available-to-promise computation system. Production Planning and Control, 14 (7), 662-672.
    • (2003) Production Planning and Control , vol.14 , Issue.7 , pp. 662-672
    • Xiong, M.H.1    Tor, S.B.2    Khoo, L.P.3
  • 42
    • 24144445337 scopus 로고    scopus 로고
    • Optimization-based available-to-promise with multi-stage resource availability
    • Zhao, Z. and Ball, M.O., 2005. Optimization-based available-to-promise with multi-stage resource availability. Annals of Operations Research, 135 (1), 65-85.
    • (2005) Annals of Operations Research , vol.135 , Issue.1 , pp. 65-85
    • Zhao, Z.1    Ball, M.O.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.