-
1
-
-
38749150380
-
A zero-inventory production and distribution problem with a fixed customer sequence
-
Armstrong, R., S. Gao, L. Lei. 2008. A zero-inventory production and distribution problem with a fixed customer sequence. Ann. Oper. Res. 159(1) 395-414.
-
(2008)
Ann. Oper. Res.
, vol.159
, Issue.1
, pp. 395-414
-
-
Armstrong, R.1
Gao, S.2
Lei, L.3
-
2
-
-
33748499031
-
Optimizing production, inventory, and distribution for General Chemical Group
-
Bloomquist, D., D. Graziosi, L. Lei, A. Ruszczynski, S. Liu, H. Zhong. 2002. Optimizing production, inventory, and distribution for General Chemical Group. Interfaces 32(4) 67-68.
-
(2002)
Interfaces
, vol.32
, Issue.4
, pp. 67-68
-
-
Bloomquist, D.1
Graziosi, D.2
Lei, L.3
Ruszczynski, A.4
Liu, S.5
Zhong, H.6
-
4
-
-
0035566749
-
The Kellogg company optimizes production, inventory, and distribution
-
Brown, G., J. Keegan, B. Vigus, K. Wood. 2001. The Kellogg company optimizes production, inventory, and distribution. Interfaces 31(6) 1-15.
-
(2001)
Interfaces
, vol.31
, Issue.6
, pp. 1-15
-
-
Brown, G.1
Keegan, J.2
Vigus, B.3
Wood, K.4
-
5
-
-
0028371172
-
Coordination of production and distribution planning
-
Chandra, P., M. L. Fisher. 1994. Coordination of production and distribution planning. Eur. J. Oper. Res. 72(3) 503-517.
-
(1994)
Eur. J. Oper. Res.
, vol.72
, Issue.3
, pp. 503-517
-
-
Chandra, P.1
Fisher, M.L.2
-
6
-
-
22544468772
-
Integrated production and distribution operations: Taxonomy, models, and review
-
D. Simchi-Levi, S. D. Wu, Z.-J. Shen, eds, Kluwer Academic Publishers, Dordrecht, The Netherlands
-
Chen, Z.-L. 2004. Integrated production and distribution operations: Taxonomy, models, and review. D. Simchi-Levi, S. D. Wu, Z.-J. Shen, eds. Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era. Kluwer Academic Publishers, Dordrecht, The Netherlands, 711-746.
-
(2004)
Handbook of Quantitative Supply Chain Analysis: Modeling in the E-Business Era
, pp. 711-746
-
-
Chen, Z.-L.1
-
7
-
-
0029394414
-
Error bound for the dynamic lot size model allowing speculative motive
-
Chen, C.-D., C.-Y. Lee. 1995. Error bound for the dynamic lot size model allowing speculative motive. IIE Trans. 27 683-688.
-
(1995)
IIE Trans.
, vol.27
, pp. 683-688
-
-
Chen, C.-D.1
Lee, C.-Y.2
-
8
-
-
22544461035
-
Integrated scheduling of production and distribution operations
-
Chen, Z.-L., G. L. Vairaktarakis. 2005. Integrated scheduling of production and distribution operations. Management Sci. 51(4) 614-628.
-
(2005)
Management Sci.
, vol.51
, Issue.4
, pp. 614-628
-
-
Chen, Z.-L.1
Vairaktarakis, G.L.2
-
9
-
-
70449504189
-
-
Working paper, Rutgers Business School, Rutgers University, New Brunswick, NJ
-
Chen, Z.-L., L. Lei, H. Zhong. 2004. On lot-sizing with bidirectional flows. Working paper, Rutgers Business School, Rutgers University, New Brunswick, NJ.
-
(2004)
On Lot-sizing with Bidirectional Flows
-
-
Chen, Z.-L.1
Lei, L.2
Zhong, H.3
-
10
-
-
33847047450
-
Container vessel scheduling with bidirectional flows
-
Chen, Z.-L., L. Lei, H. Zhong. 2007. Container vessel scheduling with bidirectional flows. Oper. Res. Lett. 35 186-194.
-
(2007)
Oper. Res. Lett.
, vol.35
, pp. 186-194
-
-
Chen, Z.-L.1
Lei, L.2
Zhong, H.3
-
11
-
-
0023984228
-
Strategic analysis of integrated production-distribution systems: Models and methods
-
Cohen, M. A., H. L. Lee. 1988. Strategic analysis of integrated production-distribution systems: Models and methods. Oper. Res. 36(2) 216-228.
-
(1988)
Oper. Res.
, vol.36
, Issue.2
, pp. 216-228
-
-
Cohen, M.A.1
Lee, H.L.2
-
12
-
-
0002893158
-
Resource deployment analysis of global manufacturing and distribution networks
-
Cohen, M. A., H. L. Lee. 1989. Resource deployment analysis of global manufacturing and distribution networks. J. Manufacturing Oper. Management 2 81-104.
-
(1989)
J. Manufacturing Oper. Management
, vol.2
, pp. 81-104
-
-
Cohen, M.A.1
Lee, H.L.2
-
13
-
-
0029775542
-
Optimal short horizon distribution operations in reusable container systems
-
Del Castillo, E., J. K. Cochran. 1996. Optimal short horizon distribution operations in reusable container systems. J. Oper. Res. Soc. 47 48-60.
-
(1996)
J. Oper. Res. Soc.
, vol.47
, pp. 48-60
-
-
Del Castillo, E.1
Cochran, J.K.2
-
14
-
-
0023563839
-
Inventory/routing: Reduction from an annual to a short period
-
Dror, M., M. Ball. 1987. Inventory/routing: Reduction from an annual to a short period. Naval Res. Logist. 34 891-905.
-
(1987)
Naval Res. Logist.
, vol.34
, pp. 891-905
-
-
Dror, M.1
Ball, M.2
-
15
-
-
0343867255
-
Inventory routing: Operational design
-
Dror, M., P. Trudeau. 1988. Inventory routing: Operational design. J. Bus. Logist. 9 165-183.
-
(1988)
J. Bus. Logist.
, vol.9
, pp. 165-183
-
-
Dror, M.1
Trudeau, P.2
-
16
-
-
0032661559
-
Integrated production/distribution planning in supply chains: An invited review
-
Erengüç, S. S., N. C. Simpson, A. J. Vakharia. 1999. Integrated production/distribution planning in supply chains: An invited review. Eur. J. Oper. Res. 115(2) 219-236.
-
(1999)
Eur. J. Oper. Res.
, vol.115
, Issue.2
, pp. 219-236
-
-
Erengüç, S.S.1
Simpson, N.C.2
Vakharia, A.J.3
-
17
-
-
0031095818
-
Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation
-
Fumero, F., C. Vercellis. 1997. Integrating distribution, machine assignment and lot-sizing via Lagrangean relaxation. Internat. J. Production Econom. 49 45-54.
-
(1997)
Internat. J. Production Econom.
, vol.49
, pp. 45-54
-
-
Fumero, F.1
Vercellis, C.2
-
18
-
-
0033339421
-
Synchronized development of production, inventory, and distribution schedules
-
Fumero, F., C. Vercellis. 1999. Synchronized development of production, inventory, and distribution schedules. Transportation Sci. 33(3) 330-340.
-
(1999)
Transportation Sci.
, vol.33
, Issue.3
, pp. 330-340
-
-
Fumero, F.1
Vercellis, C.2
-
19
-
-
61349164254
-
The integrated production and transportation scheduling problem for a product with a short lifespan
-
Geismar, N., G. Laporte, L. Lei, C. Sriskandarajah. 2008. The integrated production and transportation scheduling problem for a product with a short lifespan. INFORMS J. Comput. 20(1)21-33.
-
(2008)
INFORMS J. Comput.
, vol.20
, Issue.1
, pp. 21-33
-
-
Geismar, N.1
Laporte, G.2
Lei, L.3
Sriskandarajah, C.4
-
20
-
-
0036660574
-
Implementing a distribution- network decision-support system at Pfizer/Warner-Lambert
-
Gupta, V., E. Peters, T. Miller. 2002. Implementing a distribution- network decision-support system at Pfizer/Warner-Lambert. Interfaces 32(4) 28-45.
-
(2002)
Interfaces
, vol.32
, Issue.4
, pp. 28-45
-
-
Gupta, V.1
Peters, E.2
Miller, T.3
-
21
-
-
84991887895
-
Rolling planning horizon: Error bounds for the dynamic lot size model
-
Lee, C.-Y., E. V. Denardo. 1986. Rolling planning horizon: Error bounds for the dynamic lot size model. Math. Oper. Res. 11 423-432.
-
(1986)
Math. Oper. Res.
, vol.11
, pp. 423-432
-
-
Lee, C.-Y.1
Denardo, E.V.2
-
22
-
-
33748518397
-
On the integrated production, inventory, and distribution routing problem
-
Lei, L., A. Ruszczynski, S. Liu, S. Park. 2006. On the integrated production, inventory, and distribution routing problem. IIE Trans. 38(11) 955-970.
-
(2006)
IIE Trans.
, vol.38
, Issue.11
, pp. 955-970
-
-
Lei, L.1
Ruszczynski, A.2
Liu, S.3
Park, S.4
-
23
-
-
27744566926
-
Machine scheduling with pickup and delivery
-
Li, C.-L., J. Ou. 2005. Machine scheduling with pickup and delivery. Naval Res. Logist. 52(7) 617-630.
-
(2005)
Naval Res. Logist.
, vol.52
, Issue.7
, pp. 617-630
-
-
Li, C.-L.1
Ou., J.2
-
24
-
-
10444261222
-
Machine scheduling with deliveries to multiple customer locations
-
Li, C.-L., G. Vairaktarakis, C.-Y. Lee. 2005. Machine scheduling with deliveries to multiple customer locations. Eur. J. Oper. Res. 164 39-51.
-
(2005)
Eur. J. Oper. Res.
, vol.164
, pp. 39-51
-
-
Li, C.-L.1
Vairaktarakis, G.2
Lee, C.-Y.3
-
25
-
-
70449512713
-
Production and distribution planning with many practical constraints
-
Liu, S., L. Lei, A. Ruszczynski. 2007. Production and distribution planning with many practical constraints. Internat. J. Oper. Quant. Management. 13(2) 129-144.
-
(2007)
Internat. J. Oper. Quant. Management.
, vol.13
, Issue.2
, pp. 129-144
-
-
Liu, S.1
Lei, L.2
Ruszczynski, A.3
-
26
-
-
21144476120
-
Integrated production, distribution, and inventory planning at libbey-owens-ford
-
Martin, C. H., D. C. Dent, J. C. Eckhart. 1993. Integrated production, distribution, and inventory planning at Libbey-Owens-Ford. Interfaces 23(3) 68-78.
-
(1993)
Interfaces
, vol.23
, Issue.3
, pp. 68-78
-
-
Martin, C.H.1
Dent, D.C.2
Eckhart, J.C.3
-
27
-
-
0032596132
-
A hierarchical planning approach for a production-distribution system
-
Ozdamar, L., T. Yazgac. 1999. A hierarchical planning approach for a production-distribution system. Internat. J. Production Res. 37 3759-3772.
-
(1999)
Internat. J. Production Res.
, vol.37
, pp. 3759-3772
-
-
Ozdamar, L.1
Yazgac, T.2
-
28
-
-
70449512723
-
-
Ph.D. dissertation, Rutgers Business School, Rutgers University, New Brunswick, NJ
-
Zhong, H. 2006. Models and algorithms for supply chain network operations planning and scheduling with bidirectional flows. Ph.D. dissertation, Rutgers Business School, Rutgers University, New Brunswick, NJ.
-
(2006)
Models and Algorithms for Supply Chain Network Operations Planning and Scheduling with Bidirectional Flows
-
-
Zhong, H.1
|