-
2
-
-
0034633396
-
Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy
-
Bonvik, A. M., Dallery, Y. and Gershwin, S. B. (2000) Approximate analysis of production systems operated by a CONWIP/finite buffer hybrid control policy. International Journal of Production Research, 38:13, pp. 2845-2869.
-
(2000)
International Journal of Production Research
, vol.38
, Issue.13
, pp. 2845-2869
-
-
Bonvik, A.M.1
Dallery, Y.2
Gershwin, S.B.3
-
3
-
-
0003681233
-
-
Department of Electrical Engineering and Computer Science, Massachusetts Institute of Technology, Cambridge, MA
-
Burman, M. H. (1995) New results in flow line analysis, Department of Electrical Engineering and Computer Science, Massachusetts Institute of Technology, Cambridge, MA
-
(1995)
New Results in Flow Line Analysis
-
-
Burman, M.H.1
-
4
-
-
0345854809
-
c-bottlenecks in serial production lines: Identification and application
-
Chiang, S. Y., Kuo, C. T. and Meerkov, S. M. (2001) c-bottlenecks in serial production lines: Identification and application. Mathematical Problems in Engineering, 7, pp. 547-578.
-
(2001)
Mathematical Problems in Engineering
, vol.7
, pp. 547-578
-
-
Chiang, S.Y.1
Kuo, C.T.2
Meerkov, S.M.3
-
5
-
-
0024732503
-
Approximate analysis of transfer lines with unreliable machines and finite buffers
-
Dallery, Y., David, R. and Xie, X. L. (1989) Approximate analysis of transfer lines with unreliable machines and finite buffers. IEEE Transactions on Automatic Control, 34:9, pp. 943-953.
-
(1989)
IEEE Transactions on Automatic Control
, vol.34
, Issue.9
, pp. 943-953
-
-
Dallery, Y.1
David, R.2
Xie, X.L.3
-
6
-
-
0033097497
-
An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers
-
Dallery, Y. and Le Bihan, H. (1999) An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers. International Journal of Production Research, 37:5, pp. 1093-1117.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.5
, pp. 1093-1117
-
-
Dallery, Y.1
Le Bihan, H.2
-
7
-
-
58249083315
-
How to design a production line that has a bottleneck
-
Gershwin, S. B. (1996) How to design a production line that has a bottleneck
-
(1996)
-
-
Gershwin, S.B.1
-
9
-
-
0034418438
-
Efficient algorithms for buffer space allocation
-
Gershwin, S. B. and Schor, J. E. (2000) Efficient algorithms for buffer space allocation. Annals of Operations Research, 93, pp. 117-144.
-
(2000)
Annals of Operations Research
, vol.93
, pp. 117-144
-
-
Gershwin, S.B.1
Schor, J.E.2
-
10
-
-
0033737583
-
Production and preventive maintenance rates control for a manufacturing system: An experimental design approach
-
Gharbi, A. and Kenne, J. P. (2000) Production and preventive maintenance rates control for a manufacturing system: An experimental design approach. International Journal of Production Economics, 65:3, pp. 275-287.
-
(2000)
International Journal of Production Economics
, vol.65
, Issue.3
, pp. 275-287
-
-
Gharbi, A.1
Kenne, J.P.2
-
11
-
-
0041417619
-
Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems
-
Gharbi, A. and Kenne, J. P. (2003) Optimal production control problem in stochastic multiple-product multiple-machine manufacturing systems. IIE Transactions, 35:10, pp. 941-952.
-
(2003)
IIE Transactions
, vol.35
, Issue.10
, pp. 941-952
-
-
Gharbi, A.1
Kenne, J.P.2
-
12
-
-
0027251210
-
Toward characterizing the optimal allocation of storage space in production line systems with variable processing times
-
Hillier, F. S., So, K. C. and Boling, R. W. (1993) Toward characterizing the optimal allocation of storage space in production line systems with variable processing times. Management Science, 39:1, pp. 126-133.
-
(1993)
Management Science
, vol.39
, Issue.1
, pp. 126-133
-
-
Hillier, F.S.1
So, K.C.2
Boling, R.W.3
-
13
-
-
0033640431
-
Characterizing the optimal allocation of storage space in production line systems with variable processing times
-
Hillier, M. S. (2000) Characterizing the optimal allocation of storage space in production line systems with variable processing times. IIE Transactions, 32:1, pp. 1-8.
-
(2000)
IIE Transactions
, vol.32
, Issue.1
, pp. 1-8
-
-
Hillier, M.S.1
-
14
-
-
0030684287
-
Production rate control and corrective maintenance planning problem of a failure prone manufacturing system
-
Presented at the Albuquerque, NM
-
Kenne, J. P. and Boukas, E. K. (1997) Production rate control and corrective maintenance planning problem of a failure prone manufacturing system. Presented at the ACC Conference Albuquerque, NM
-
(1997)
ACC Conference
-
-
Kenne, J.P.1
Boukas, E.K.2
-
15
-
-
0033079907
-
Experimental design in production and maintenance control problem of a single machine, single product manufacturing system
-
Kenne, J. P. and Gharbi, A. (1999) Experimental design in production and maintenance control problem of a single machine, single product manufacturing system. International Journal of Production Research, 37:3, pp. 621-637.
-
(1999)
International Journal of Production Research
, vol.37
, Issue.3
, pp. 621-637
-
-
Kenne, J.P.1
Gharbi, A.2
-
16
-
-
2042541402
-
A simulation optimization based control policy for failure prone one-machine, two-product manufacturing systems
-
Kenne, J. P. and Gharbi, A. (2004) A simulation optimization based control policy for failure prone one-machine, two-product manufacturing systems. Computers &Industrial Engineering, 46:2, pp. 285-292.
-
(2004)
Computers & Industrial Engineering
, vol.46
, Issue.2
, pp. 285-292
-
-
Kenne, J.P.1
Gharbi, A.2
-
18
-
-
0028392099
-
Optimal feedback production planning in a stochastic two-machine flowshop
-
Lou, S., Sethi, S. P. and Zhang, Q. (1994) Optimal feedback production planning in a stochastic two-machine flowshop. European Journal of Operations Research, 73:2, pp. 331-345.
-
(1994)
European Journal of Operations Research
, vol.73
, Issue.2
, pp. 331-345
-
-
Lou, S.1
Sethi, S.P.2
Zhang, Q.3
-
20
-
-
0029378614
-
Optimal feedback production planning in a stochastic n-machine flowshop
-
Presman, E., Sethi, S. and Zhang, Q. (1995) Optimal feedback production planning in a stochastic n-machine flowshop. Automatica, 31:9, pp. 1325-1332.
-
(1995)
Automatica
, vol.31
, Issue.9
, pp. 1325-1332
-
-
Presman, E.1
Sethi, S.2
Zhang, Q.3
-
21
-
-
0003850656
-
-
Wiley, West Lafayette, IN
-
Pritsker, A. A. B. and O'Reilly, J. J. (1999) Simulation with Visual SLAM and AweSim,, Wiley, West Lafayette, IN
-
(1999)
Simulation With Visual SLAM and AweSim
-
-
Pritsker, A.A.B.1
O'Reilly, J.J.2
-
22
-
-
0031099719
-
Computational evaluation of hierarchical production control policies for stochastic manufacturing systems
-
Samaratunga, C., Sethi, S. P. and Zhou, X. (1997) Computational evaluation of hierarchical production control policies for stochastic manufacturing systems. Operations Research, 45:2, pp. 258-274.
-
(1997)
Operations Research
, vol.42
, Issue.2
, pp. 258-274
-
-
Samaratunga, C.1
Sethi, S.P.2
Zhou, X.3
-
24
-
-
0010355050
-
Optimal feedback control in deterministic dynamic two-machine flowshops
-
Sethi, S. P. and Zhou, X. Y. (1996) Optimal feedback control in deterministic dynamic two-machine flowshops. Operations Research Letters, 19, pp. 225-235.
-
(1996)
Operations Research Letters
, vol.19
, pp. 225-235
-
-
Sethi, S.P.1
Zhou, X.Y.2
-
25
-
-
0027666614
-
Production control for a tandem two-machine system
-
Van Ryzin, G., Lou, S. X. C. and Gershwin, S. B. (1993) Production control for a tandem two-machine system. IIE Transactions, 25:5, pp. 5-20.
-
(1993)
IIE Transactions
, vol.25
, Issue.5
, pp. 5-20
-
-
Van Ryzin, G.1
Lou, S.X.C.2
Gershwin, S.B.3
|