-
1
-
-
0024053852
-
Questionnaire survey on bidding in construction
-
Ahmad, I., and Minkarah, I. A. (1988). " Questionnaire survey on bidding in construction." J. Manage. Eng., 4 (3), 229-243.
-
(1988)
J. Manage. Eng.
, vol.4
, Issue.3
, pp. 229-243
-
-
Ahmad, I.1
Minkarah, I.A.2
-
2
-
-
2242459831
-
Analysis of factors influencing project cost estimating practice
-
Akintoye, A. (2000). " Analysis of factors influencing project cost estimating practice. " Constr. Manage. Econom., 18, 77-89.
-
(2000)
Constr. Manage. Econom.
, vol.18
, pp. 77-89
-
-
Akintoye, A.1
-
3
-
-
0034269643
-
Key factors in bid reasoning model
-
Chua, D. K. H., and Li, D. (2000). " Key factors in bid reasoning model. " J. Constr. Eng. Manage., 126 (5), 349-357.
-
(2000)
J. Constr. Eng. Manage.
, vol.126
, Issue.5
, pp. 349-357
-
-
Chua, D.K.H.1
Li, D.2
-
4
-
-
85001837235
-
Utility-theory model for bid mark-up decisions
-
".
-
Dozzi, S. P., AbouRizk, S. M., and Schroeder, S. L. (1996). " Utility-theory model for bid mark-up decisions." J. Constr. Eng. Manage., 122 (2), 119-124.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.2
, pp. 119-124
-
-
Dozzi, S.P.1
Abourizk, S.M.2
Schroeder, S.L.3
-
5
-
-
0001072506
-
The effect of contract type and size on competitiveness in bidding
-
Drew, D. S., and Skitmore, R. M. (1997). " The effect of contract type and size on competitiveness in bidding." Constr. Manage. Econom., 15, 469-489.
-
(1997)
Constr. Manage. Econom.
, vol.15
, pp. 469-489
-
-
Drew, D.S.1
Skitmore, R.M.2
-
6
-
-
0036813520
-
The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore
-
Dulaimi, M. F., and Shan, H. G. (2002). " The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore." Constr. Manage. Econom., 20, 601-610.
-
(2002)
Constr. Manage. Econom.
, vol.20
, pp. 601-610
-
-
Dulaimi, M.F.1
Shan, H.G.2
-
7
-
-
0002861004
-
Competitive bidding strategy model and software system for bid preparation
-
Fayek, A. (1998). " Competitive bidding strategy model and software system for bid preparation." J. Constr. Eng. Manage., 124 (1), 1-10.
-
(1998)
J. Constr. Eng. Manage.
, vol.124
, Issue.1
, pp. 1-10
-
-
Fayek, A.1
-
8
-
-
0004202330
-
-
Wiley, New York.
-
Kish, L. (1965). Survey sampling, Wiley, New York, 45-53.
-
(1965)
Survey Sampling
, pp. 45-53
-
-
Kish, L.1
-
9
-
-
84991380457
-
Combining rule-based expert systems and artificial neural networks for mark-up estimation
-
Li, H., and Love, P. (1999). " Combining rule-based expert systems and artificial neural networks for mark-up estimation." Constr. Manage. Econom., 17, 169-176.
-
(1999)
Constr. Manage. Econom.
, vol.17
, pp. 169-176
-
-
Li, H.1
Love, P.2
-
10
-
-
0000643379
-
Factors considered in tendering decisions by top UK contractors
-
Shash, A. A. (1993). " Factors considered in tendering decisions by top UK contractors." Constr. Manage. Econom., 11, 111-118.
-
(1993)
Constr. Manage. Econom.
, vol.11
, pp. 111-118
-
-
Shash, A.A.1
-
11
-
-
84950234637
-
Factors affecting a contractor's mark-up size decision in Saudi Arabia
-
Shash, A. A., and Abdul-Hadi, N. H. (1992). " Factors affecting a contractor's mark-up size decision in Saudi Arabia." Constr. Manage. Econom., 10, 415-429.
-
(1992)
Constr. Manage. Econom.
, vol.10
, pp. 415-429
-
-
Shash, A.A.1
Abdul-Hadi, N.H.2
-
12
-
-
0011739273
-
The effect of contractor size on mark-up size decision in Saudi Arabia
-
Shash, A. A., and Abdul-Hadi, N. H. (1993). " The effect of contractor size on mark-up size decision in Saudi Arabia.." Constr. Manage. Econom., 11, 421-429.
-
(1993)
Constr. Manage. Econom.
, vol.11
, pp. 421-429
-
-
Shash, A.A.1
Abdul-Hadi, N.H.2
-
13
-
-
0000885441
-
The construction contract bidder homogeneity assumption: An empirical test
-
Skitmore, R. M. (1991). " The construction contract bidder homogeneity assumption: An empirical test.." Constr. Manage. Econom., 9 (5), 403-429.
-
(1991)
Constr. Manage. Econom.
, vol.9
, Issue.5
, pp. 403-429
-
-
Skitmore, R.M.1
-
14
-
-
0033099726
-
Small to medium contractor contingency and assumption of risk
-
Smith, G. R., and Bohn, C. M. (1999). " Small to medium contractor contingency and assumption of risk.." J. Constr. Eng. Manage., 125 (2), 101-108.
-
(1999)
J. Constr. Eng. Manage.
, vol.125
, Issue.2
, pp. 101-108
-
-
Smith, G.R.1
Bohn, C.M.2
-
15
-
-
33646409001
-
Is there a right price in construction bids
-
Wallwork, J. W. (1999). " Is there a right price in construction bids. ?" Cost Eng., 40 (2), 41-43.
-
(1999)
Cost Eng.
, vol.40
, Issue.2
, pp. 41-43
-
-
Wallwork, J.W.1
-
16
-
-
0038279079
-
To bid or not to bid: A parametric solution
-
Wanous, M., Boussabaine, A. H., and Lewis, J. (2000). "To bid or not to bid: A parametric solution.." Constr. Manage. Econom., 18, 457-466.
-
(2000)
Constr. Manage. Econom.
, vol.18
, pp. 457-466
-
-
Wanous, M.1
Boussabaine, A.H.2
Lewis, J.3
-
17
-
-
0344121699
-
A neural network bid/no bid model: The case for contractors in Syria
-
Wanous, M., Boussabaine, A. H., and Lewis, J. (2003). " A neural network bid/no bid model: The case for contractors in Syria.." Constr. Manage. Econom., 21, 737-744.
-
(2003)
Constr. Manage. Econom.
, vol.21
, pp. 737-744
-
-
Wanous, M.1
Boussabaine, A.H.2
Lewis, J.3
-
18
-
-
0011740101
-
Risk assessment on contractors' pricing strategies
-
Xu, T., and Tiong, R. (2001). " Risk assessment on contractors' pricing strategies.." Constr. Manage. Econom., 19, 77-84.
-
(2001)
Constr. Manage. Econom.
, vol.19
, pp. 77-84
-
-
Xu, T.1
Tiong, R.2
|