1
-
-
0001386480
-
Modeling project performance for decision making
-
Alarcon, L. F., and Ashley, D. B. (1996). "Modeling project performance for decision making." J. Constr. Eng. Manage., 122(3), 265-273.
-
(1996)
J. Constr. Eng. Manage.
, vol.122
, Issue.3
, pp. 265-273
-
-
Alarcon, L.F.1
Ashley, D.B.2
-
3
-
-
0004146280
-
-
McGraw-Hill, New York.
-
Barrie, D. S., and Paulson, B. C. (1992). Professional construction management: Including CM, design-construct and general contracting, 3rd Ed., McGraw-Hill, New York.
-
(1992)
Professional Construction Management: Including CM, Design-construct and General Contracting, 3rd Ed.
-
-
Barrie, D.S.1
Paulson, B.C.2
-
4
-
-
18744406126
-
Productivity in engineering disciplines
-
Bolte, K. (1986). "Productivity in engineering disciplines." National Productivity Review, Spring, 134-141.
-
(1986)
National Productivity Review
, Issue.SPRING
, pp. 134-141
-
-
Bolte, K.1
-
5
-
-
0042960668
-
Costs of quality deviations in design and construction
-
Construction Industry Institute, Austin, Tex.
-
Burati, J. L., and Farrington, J. J. (1987). "Costs of quality deviations in design and construction." Research Rep. No. SD-29, Construction Industry Institute, Austin, Tex.
-
(1987)
Research Rep. No. SD-29
, vol.SD-29
-
-
Burati, J.L.1
Farrington, J.J.2
-
6
-
-
0004032390
-
Input variables impacting design effectiveness
-
Construction Industry Institute, Austin, Tex.
-
Chalabi, A. F., Beaudin, B. J., and Salazar, G. F. (1987). "Input Variables Impacting Design Effectiveness." Research Rep. No. SD-26, Construction Industry Institute, Austin, Tex.
-
(1987)
Research Rep. No. SD-26
, vol.SD-26
-
-
Chalabi, A.F.1
Beaudin, B.J.2
Salazar, G.F.3
-
7
-
-
15844399634
-
Engineering productivity measurement
-
Construction Industry Institute, Austin, Tex.
-
Chang, L. M., Georgy, M. E., and Zhang, L. (2001). "Engineering productivity measurement." Research Rep. No. RR156-11, Construction Industry Institute, Austin, Tex.
-
(2001)
Research Rep. No. RR156-11
, vol.RR156-11
-
-
Chang, L.M.1
Georgy, M.E.2
Zhang, L.3
-
9
-
-
0026131257
-
Management of engineering/design phase
-
Eldin, N. N. (1991). "Management of engineering/design phase." J. Constr. Eng. Manage., 117(1), 163-175.
-
(1991)
J. Constr. Eng. Manage.
, vol.117
, Issue.1
, pp. 163-175
-
-
Eldin, N.N.1
-
10
-
-
0029753326
-
Achieving industrial facility quality: Integration is key
-
Fergusson, K. J., and Teicholz, P. M. (1996). "Achieving industrial facility quality: Integration is key." J. Manage. Eng., 12(1), 49-56.
-
(1996)
J. Manage. Eng.
, vol.12
, Issue.1
, pp. 49-56
-
-
Fergusson, K.J.1
Teicholz, P.M.2
-
11
-
-
18744415235
-
Engineering performance in industrial construction
-
ASCE, Reston, Va.
-
Georgy, M. E., Chang, L. M., and Walsh, K. (2000). "Engineering performance in industrial construction." Proc., Construction Congress VI, ASCE, Reston, Va., 917-927.
-
(2000)
Proc., Construction Congress VI
, pp. 917-927
-
-
Georgy, M.E.1
Chang, L.M.2
Walsh, K.3
-
12
-
-
0004037526
-
Making multiple-objective decisions
-
IEEE Computer Society, IEEE Computer Society Press, Los Alamitos, Calif
-
Mollaghasemi, M., and Pet-Edwards, J. (1997). "Making multiple-objective decisions." Technical briefing, IEEE Computer Society, IEEE Computer Society Press, Los Alamitos, Calif.
-
(1997)
Technical Briefing
-
-
Mollaghasemi, M.1
Pet-Edwards, J.2
-
13
-
-
0010078608
-
Building teams get high marks
-
Post, N. M. (1998). "Building teams get high marks." ENR, 240(19), 32-39.
-
(1998)
ENR
, vol.240
, Issue.19
, pp. 32-39
-
-
Post, N.M.1
-
15
-
-
0008284319
-
Evaluation of design effectiveness
-
Construction Industry Institute, Austin, Tex.
-
Tucker, R. L., and Scarlett, B. R. (1986). "Evaluation of design effectiveness." Research Rep. No. SD-16, Construction Industry Institute, Austin, Tex.
-
(1986)
Research Rep. No. SD-16
, vol.SD-16
-
-
Tucker, R.L.1
Scarlett, B.R.2
-
16
-
-
0025462150
-
Project performance evaluation checklist for consulting engineers
-
Wuellner, W. W. (1990). "Project performance evaluation checklist for consulting engineers." J. Manage. Eng., 6(3), 270-281.
-
(1990)
J. Manage. Eng.
, vol.6
, Issue.3
, pp. 270-281
-
-
Wuellner, W.W.1
|