-
2
-
-
29244459839
-
-
AIA/AGC American Institute of Architects/Associated General Contractors of America Joint Committee, Washington, DC
-
AIA/AGC (2004) Primer on Project Delivery, American Institute of Architects/Associated General Contractors of America Joint Committee, Washington, DC
-
(2004)
Primer on Project Delivery
-
-
-
3
-
-
18144410511
-
Design-build pre-qualification and tendering approach for public projects
-
Al-Reshaid, K. and Kartam, N. (2005) Design-build pre-qualification and tendering approach for public projects. International Journal of Project Management, 23:4, pp. 309-320.
-
(2005)
International Journal of Project Management
, vol.23
, Issue.4
, pp. 309-320
-
-
Al-Reshaid, K.1
Kartam, N.2
-
4
-
-
0033101635
-
Framework for evaluating bids of construction contractors
-
Alsugair, A. M. (1999) Framework for evaluating bids of construction contractors. Journal of Management in Engineering, 15:2, pp. 72-78.
-
(1999)
Journal of Management in Engineering
, vol.15
, Issue.2
, pp. 72-78
-
-
Alsugair, A.M.1
-
5
-
-
67650320970
-
Integrating innovative project delivery methods into the construction curriculum
-
Bai, Y. and Hezam, A. (2003) Integrating innovative project delivery methods into the construction curriculum. ASC Proceedings of the 39th Annual Conference, pp. 119-128.
-
(2003)
ASC Proceedings of the 39th Annual Conference
, pp. 119-128
-
-
Bai, Y.1
Hezam, A.2
-
8
-
-
11944249373
-
Contractor selection using the analytic network process
-
Cheng, E. and Li, H. (2004) Contractor selection using the analytic network process. Construction Management and Economics, 22:10, pp. 1021-1032.
-
(2004)
Construction Management and Economics
, vol.22
, Issue.10
, pp. 1021-1032
-
-
Cheng, E.1
Li, H.2
-
9
-
-
0036812939
-
Multi-criteria evaluation model for the selection of architectural consultants
-
Cheung, F. K., Kuen, J. L. and Skitmore, M. (2002) Multi-criteria evaluation model for the selection of architectural consultants. Construction Management and Economics, 20:7, pp. 569-580.
-
(2002)
Construction Management and Economics
, vol.20
, Issue.7
, pp. 569-580
-
-
Cheung, F.K.1
Kuen, J.L.2
Skitmore, M.3
-
12
-
-
43949108520
-
Commissioning large public projects using construction manager at risk (CM®)
-
Cunningham, G. (2005) Commissioning large public projects using construction manager at risk (CM®). 13th National Conference on Building Commissioning, pp. 1-14.
-
(2005)
13th National Conference on Building Commissioning
, pp. 1-14
-
-
Cunningham, G.1
-
14
-
-
0001119781
-
Final contractor selection using the analytical hierarchy process
-
Fong, P. S. and Choi, S. K. (2000) Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18:5, pp. 547-557.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.5
, pp. 547-557
-
-
Fong, P.S.1
Choi, S.K.2
-
18
-
-
67650333263
-
-
American Bar Association, Chicago, USA
-
Hess, S., Bales, J., Folk, D. and Holt, T. (2007) Design Professional and Construction Manager Law, American Bar Association, Chicago, USA
-
(2007)
Design Professional and Construction Manager Law
-
-
Hess, S.1
Bales, J.2
Folk, D.3
Holt, T.4
-
19
-
-
13944260870
-
Project delivery system and project change: Quantitative analysis
-
Ibbs, C. W., Kwak, Y. H., Ng, T. and Odabasi, M. (2003) Project delivery system and project change: Quantitative analysis. Journal of Construction Engineering and Management, 129:4, pp. 382-387.
-
(2003)
Journal of Construction Engineering and Management
, vol.129
, Issue.4
, pp. 382-387
-
-
Ibbs, C.W.1
Kwak, Y.H.2
Ng, T.3
Odabasi, M.4
-
20
-
-
1342337557
-
Prequalification and multi-criteria selection: A measure of contractors' opinions
-
Jennings, P. and Holt, G. (1998) Prequalification and multi-criteria selection: A measure of contractors' opinions. Construction Management and Economics, 16:6, pp. 651-660.
-
(1998)
Construction Management and Economics
, vol.16
, Issue.6
, pp. 651-660
-
-
Jennings, P.1
Holt, G.2
-
22
-
-
84860498580
-
A multi-criteria approach to contractor selection
-
Mahdi, I., Riley, M., Fereig, S. and Alex, A. (2002) A multi-criteria approach to contractor selection. Engineering, Construction and Architectural Management, 9:1, pp. 29-37.
-
(2002)
Engineering, Construction and Architectural Management
, vol.9
, Issue.1
, pp. 29-37
-
-
Mahdi, I.1
Riley, M.2
Fereig, S.3
Alex, A.4
-
23
-
-
67650293244
-
CM-at-Risk delivery system and the Miami intermodal center
-
Technical Research Centre of Finland (VTT), Espoo, Finland
-
Minchin, R. and Ellis, R. (2005) CM-at-Risk delivery system and the Miami intermodal center. Systemic Innovation in the Management of Construction Projects and Processes, pp. 339-351. Technical Research Centre of Finland (VTT), Espoo, Finland
-
(2005)
Systemic Innovation in the Management of Construction Projects and Processes
, pp. 339-351
-
-
Minchin, R.1
Ellis, R.2
-
24
-
-
12344265089
-
Quality-based contractor rating model for qualification and bidding purposes
-
Minchin, R. and Smith, G. (2005) Quality-based contractor rating model for qualification and bidding purposes. Journal of Management in Engineering, 21:1, pp. 38-43.
-
(2005)
Journal of Management in Engineering
, vol.21
, Issue.1
, pp. 38-43
-
-
Minchin, R.1
Smith, G.2
-
29
-
-
0344032254
-
TenSem: A multi criteria and multi decision makers' model in tender evaluation
-
Pongpeng, J. and Liston, J. (2003) TenSem: A multi criteria and multi decision makers' model in tender evaluation. Construction Management and Economics, 21:1, pp. 21-30.
-
(2003)
Construction Management and Economics
, vol.21
, Issue.1
, pp. 21-30
-
-
Pongpeng, J.1
Liston, J.2
-
30
-
-
67650333262
-
New AIA firm survey indicates that while business is good, the profession itself changes slowly
-
Pressman, A. (2007) New AIA firm survey indicates that while business is good, the profession itself changes slowly. Architectural Record
-
(2007)
Architectural Record
-
-
Pressman, A.1
-
31
-
-
43949099303
-
Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools
-
Rojas, E. M. and Kell, I. (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134:6, pp. 387-397.
-
(2008)
Journal of Construction Engineering and Management
, vol.134
, Issue.6
, pp. 387-397
-
-
Rojas, E.M.1
Kell, I.2
-
37
-
-
13944271037
-
Awarding construction contracts on multi criteria basis in China
-
Shen, L., Li, Q., Drew, D. and Shen, Q. (2004) Awarding construction contracts on multi criteria basis in China. Journal of Construction Engineering and Management, 130:3, pp. 385-393.
-
(2004)
Journal of Construction Engineering and Management
, vol.130
, Issue.3
, pp. 385-393
-
-
Shen, L.1
Li, Q.2
Drew, D.3
Shen, Q.4
-
38
-
-
31844452225
-
The CM®isk contractor: In the driver's seat of the CM®isk team
-
Smith, R. (2005) The CM®isk contractor: In the driver's seat of the CM®isk team. AACE International Transactions
-
(2005)
AACE International Transactions
-
-
Smith, R.1
-
39
-
-
61349147272
-
Identifying key factors in the evaluation of tenders for projects and services
-
Watt, D. J., Kayis, B. and Willey, K. (2009) Identifying key factors in the evaluation of tenders for projects and services. International Journal of Project Management, 27:3, pp. 250-260.
-
(2009)
International Journal of Project Management
, vol.27
, Issue.3
, pp. 250-260
-
-
Watt, D.J.1
Kayis, B.2
Willey, K.3
-
40
-
-
0344031908
-
Lowest price or value? Investigation of UK construction clients' tender selection process
-
Wong, C. H., Holt, G. D. and Cooper, P. A. (2000) Lowest price or value? Investigation of UK construction clients' tender selection process. Construction Management and Economics, 18:7, pp. 767-774.
-
(2000)
Construction Management and Economics
, vol.18
, Issue.7
, pp. 767-774
-
-
Wong, C.H.1
Holt, G.D.2
Cooper, P.A.3
-
41
-
-
34548400272
-
Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems
-
Wong, K. W. and Li, H. (2008) Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems. Building and Environment, 43, pp. 108-125.
-
(2008)
Building and Environment
, vol.43
, pp. 108-125
-
-
Wong, K.W.1
Li, H.2
|