Multi-criteria decision support model for selecting the appropriate construction management at risk firm

Author keywords

Bidding; Construction management at risk; Contracting; Decision support models; Selection factors

Indexed keywords

BIDDING; CONSTRUCTION MANAGEMENT AT RISK; CONTRACTING; DECISION SUPPORT MODELS; SELECTION FACTORS;

EID: 67650318519     PISSN: 01446193     EISSN: 1466433X     Source Type: Journal    
DOI: 10.1080/01446190902759009     Document Type: Article
Times cited : (35)

References (41)
  • 2
    • 29244459839 scopus 로고    scopus 로고
    • AIA/AGC American Institute of Architects/Associated General Contractors of America Joint Committee, Washington, DC
    • AIA/AGC (2004) Primer on Project Delivery, American Institute of Architects/Associated General Contractors of America Joint Committee, Washington, DC
    • (2004) Primer on Project Delivery
  • 3
    • 18144410511 scopus 로고    scopus 로고
    • Design-build pre-qualification and tendering approach for public projects
    • Al-Reshaid, K. and Kartam, N. (2005) Design-build pre-qualification and tendering approach for public projects. International Journal of Project Management, 23:4, pp. 309-320.
    • (2005) International Journal of Project Management , vol.23 , Issue.4 , pp. 309-320
    • Al-Reshaid, K.1    Kartam, N.2
  • 4
    • 0033101635 scopus 로고    scopus 로고
    • Framework for evaluating bids of construction contractors
    • Alsugair, A. M. (1999) Framework for evaluating bids of construction contractors. Journal of Management in Engineering, 15:2, pp. 72-78.
    • (1999) Journal of Management in Engineering , vol.15 , Issue.2 , pp. 72-78
    • Alsugair, A.M.1
  • 5
    • 67650320970 scopus 로고    scopus 로고
    • Integrating innovative project delivery methods into the construction curriculum
    • Bai, Y. and Hezam, A. (2003) Integrating innovative project delivery methods into the construction curriculum. ASC Proceedings of the 39th Annual Conference, pp. 119-128.
    • (2003) ASC Proceedings of the 39th Annual Conference , pp. 119-128
    • Bai, Y.1    Hezam, A.2
  • 8
    • 11944249373 scopus 로고    scopus 로고
    • Contractor selection using the analytic network process
    • Cheng, E. and Li, H. (2004) Contractor selection using the analytic network process. Construction Management and Economics, 22:10, pp. 1021-1032.
    • (2004) Construction Management and Economics , vol.22 , Issue.10 , pp. 1021-1032
    • Cheng, E.1    Li, H.2
  • 9
    • 0036812939 scopus 로고    scopus 로고
    • Multi-criteria evaluation model for the selection of architectural consultants
    • Cheung, F. K., Kuen, J. L. and Skitmore, M. (2002) Multi-criteria evaluation model for the selection of architectural consultants. Construction Management and Economics, 20:7, pp. 569-580.
    • (2002) Construction Management and Economics , vol.20 , Issue.7 , pp. 569-580
    • Cheung, F.K.1    Kuen, J.L.2    Skitmore, M.3
  • 12
    • 43949108520 scopus 로고    scopus 로고
    • Commissioning large public projects using construction manager at risk (CM®)
    • Cunningham, G. (2005) Commissioning large public projects using construction manager at risk (CM®). 13th National Conference on Building Commissioning, pp. 1-14.
    • (2005) 13th National Conference on Building Commissioning , pp. 1-14
    • Cunningham, G.1
  • 14
    • 0001119781 scopus 로고    scopus 로고
    • Final contractor selection using the analytical hierarchy process
    • Fong, P. S. and Choi, S. K. (2000) Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18:5, pp. 547-557.
    • (2000) Construction Management and Economics , vol.18 , Issue.5 , pp. 547-557
    • Fong, P.S.1    Choi, S.K.2
  • 20
    • 1342337557 scopus 로고    scopus 로고
    • Prequalification and multi-criteria selection: A measure of contractors' opinions
    • Jennings, P. and Holt, G. (1998) Prequalification and multi-criteria selection: A measure of contractors' opinions. Construction Management and Economics, 16:6, pp. 651-660.
    • (1998) Construction Management and Economics , vol.16 , Issue.6 , pp. 651-660
    • Jennings, P.1    Holt, G.2
  • 23
    • 67650293244 scopus 로고    scopus 로고
    • CM-at-Risk delivery system and the Miami intermodal center
    • Technical Research Centre of Finland (VTT), Espoo, Finland
    • Minchin, R. and Ellis, R. (2005) CM-at-Risk delivery system and the Miami intermodal center. Systemic Innovation in the Management of Construction Projects and Processes, pp. 339-351. Technical Research Centre of Finland (VTT), Espoo, Finland
    • (2005) Systemic Innovation in the Management of Construction Projects and Processes , pp. 339-351
    • Minchin, R.1    Ellis, R.2
  • 24
    • 12344265089 scopus 로고    scopus 로고
    • Quality-based contractor rating model for qualification and bidding purposes
    • Minchin, R. and Smith, G. (2005) Quality-based contractor rating model for qualification and bidding purposes. Journal of Management in Engineering, 21:1, pp. 38-43.
    • (2005) Journal of Management in Engineering , vol.21 , Issue.1 , pp. 38-43
    • Minchin, R.1    Smith, G.2
  • 29
    • 0344032254 scopus 로고    scopus 로고
    • TenSem: A multi criteria and multi decision makers' model in tender evaluation
    • Pongpeng, J. and Liston, J. (2003) TenSem: A multi criteria and multi decision makers' model in tender evaluation. Construction Management and Economics, 21:1, pp. 21-30.
    • (2003) Construction Management and Economics , vol.21 , Issue.1 , pp. 21-30
    • Pongpeng, J.1    Liston, J.2
  • 30
    • 67650333262 scopus 로고    scopus 로고
    • New AIA firm survey indicates that while business is good, the profession itself changes slowly
    • Pressman, A. (2007) New AIA firm survey indicates that while business is good, the profession itself changes slowly. Architectural Record
    • (2007) Architectural Record
    • Pressman, A.1
  • 31
    • 43949099303 scopus 로고    scopus 로고
    • Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools
    • Rojas, E. M. and Kell, I. (2008) Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. Journal of Construction Engineering and Management, 134:6, pp. 387-397.
    • (2008) Journal of Construction Engineering and Management , vol.134 , Issue.6 , pp. 387-397
    • Rojas, E.M.1    Kell, I.2
  • 38
    • 31844452225 scopus 로고    scopus 로고
    • The CM®isk contractor: In the driver's seat of the CM®isk team
    • Smith, R. (2005) The CM®isk contractor: In the driver's seat of the CM®isk team. AACE International Transactions
    • (2005) AACE International Transactions
    • Smith, R.1
  • 39
    • 61349147272 scopus 로고    scopus 로고
    • Identifying key factors in the evaluation of tenders for projects and services
    • Watt, D. J., Kayis, B. and Willey, K. (2009) Identifying key factors in the evaluation of tenders for projects and services. International Journal of Project Management, 27:3, pp. 250-260.
    • (2009) International Journal of Project Management , vol.27 , Issue.3 , pp. 250-260
    • Watt, D.J.1    Kayis, B.2    Willey, K.3
  • 40
    • 0344031908 scopus 로고    scopus 로고
    • Lowest price or value? Investigation of UK construction clients' tender selection process
    • Wong, C. H., Holt, G. D. and Cooper, P. A. (2000) Lowest price or value? Investigation of UK construction clients' tender selection process. Construction Management and Economics, 18:7, pp. 767-774.
    • (2000) Construction Management and Economics , vol.18 , Issue.7 , pp. 767-774
    • Wong, C.H.1    Holt, G.D.2    Cooper, P.A.3
  • 41
    • 34548400272 scopus 로고    scopus 로고
    • Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems
    • Wong, K. W. and Li, H. (2008) Application of the analytic hierarchy process (AHP) in multi-criteria analysis of the selection of intelligent building systems. Building and Environment, 43, pp. 108-125.
    • (2008) Building and Environment , vol.43 , pp. 108-125
    • Wong, K.W.1    Li, H.2


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.