-
1
-
-
0033871635
-
Scheduling no-wait robotic cells with two and three machines
-
Agnetis, A. 2000. Scheduling no-wait robotic cells with two and three machines. Eur. J. Oper. Res. 123 303-314.
-
(2000)
Eur. J. Oper. Res
, vol.123
, pp. 303-314
-
-
Agnetis, A.1
-
2
-
-
0035248367
-
Cycle-time improvements for photolithography process in semiconductor manufacturing
-
Akçali, E., K. Nemoto, R. Uzsoy. 2001. Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans. Semiconductor Manufacturing 14 48-56.
-
(2001)
IEEE Trans. Semiconductor Manufacturing
, vol.14
, pp. 48-56
-
-
Akçali, E.1
Nemoto, K.2
Uzsoy, R.3
-
3
-
-
0032791011
-
Scheduling of parts and robot activities in a two-machine robotic cell
-
Aneja, Y. P., H. Kamoun. 1999. Scheduling of parts and robot activities in a two-machine robotic cell. Comput. Oper. Res. 26 297-312.
-
(1999)
Comput. Oper. Res
, vol.26
, pp. 297-312
-
-
Aneja, Y.P.1
Kamoun, H.2
-
5
-
-
28244467803
-
Optimal cyclic production in robotic flow shops with buffer
-
Technical Report RR982-I, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France
-
Brauner, N., G. Finke, C. Gueguen. 1997. Optimal cyclic production in robotic flow shops with buffer. Technical Report RR982-I, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France.
-
(1997)
-
-
Brauner, N.1
Finke, G.2
Gueguen, C.3
-
6
-
-
0036476753
-
Multicyclic hoist scheduling with constant processing times
-
Che, A., C. Chu, F. Chu. 2002. Multicyclic hoist scheduling with constant processing times. IEEE Trans. Robotics Automation 18 69-80.
-
(2002)
IEEE Trans. Robotics Automation
, vol.18
, pp. 69-80
-
-
Che, A.1
Chu, C.2
Chu, F.3
-
7
-
-
0037448766
-
A polynomial algorithm for 2-degree cyclic robot scheduling
-
Che, A., C. Chu, E. Levner. 2003. A polynomial algorithm for 2-degree cyclic robot scheduling. Eur. J. Oper. Res. 145 31-44.
-
(2003)
Eur. J. Oper. Res
, vol.145
, pp. 31-44
-
-
Che, A.1
Chu, C.2
Levner, E.3
-
9
-
-
0031272146
-
Cyclic scheduling of identical parts in a robotic cell
-
Crama, Y., J. van de Klundert. 1997. Cyclic scheduling of identical parts in a robotic cell. Oper. Res. 45 952-965.
-
(1997)
Oper. Res
, vol.45
, pp. 952-965
-
-
Crama, Y.1
van de Klundert, J.2
-
10
-
-
0034367676
-
Cyclic scheduling in robotic flowshops
-
Crama, Y., V. Kats, J. van de Klundert, E. Levner. 2000. Cyclic scheduling in robotic flowshops. Ann. Oper. Res.: Math. Indust. Systems 96 97-124.
-
(2000)
Ann. Oper. Res.: Math. Indust. Systems
, vol.96
, pp. 97-124
-
-
Crama, Y.1
Kats, V.2
van de Klundert, J.3
Levner, E.4
-
12
-
-
23944522312
-
Sequencing and scheduling in robotic cells: Recent developments
-
Dawande, M., H. N. Geismar, S. P. Sethi, C. Sriskandarajah. 2005. Sequencing and scheduling in robotic cells: Recent developments. J. Scheduling 8 387-426.
-
(2005)
J. Scheduling
, vol.8
, pp. 387-426
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.P.3
Sriskandarajah, C.4
-
13
-
-
33645433061
-
-
Springer, New York
-
Dawande, M., H. N. Geismar, S. P. Sethi, C. Sriskandarajah. 2007. Throughput Optimization in Robotic Cells. Springer, New York.
-
(2007)
Throughput Optimization in Robotic Cells
-
-
Dawande, M.1
Geismar, H.N.2
Sethi, S.P.3
Sriskandarajah, C.4
-
15
-
-
23944501918
-
Scheduling multiple parts in two-machine dual gripper robot cells: Heuristic algorithm and performance guarantee
-
Drobouchevitch, I. G., S. P. Sethi, J. B. Sidney, C. Sriskandarajah. 2004. Scheduling multiple parts in two-machine dual gripper robot cells: Heuristic algorithm and performance guarantee. Internat. J. Oper. Quant. Management 10 297-314.
-
(2004)
Internat. J. Oper. Quant. Management
, vol.10
, pp. 297-314
-
-
Drobouchevitch, I.G.1
Sethi, S.P.2
Sidney, J.B.3
Sriskandarajah, C.4
-
17
-
-
33746120814
-
Throughput optimization in constant travel-time dual gripper robotic cells with parallel machines
-
Geismar, H. N., M. Dawande, C. Sriskandarajah. 2006. Throughput optimization in constant travel-time dual gripper robotic cells with parallel machines. Production Oper. Management 15 311-328.
-
(2006)
Production Oper. Management
, vol.15
, pp. 311-328
-
-
Geismar, H.N.1
Dawande, M.2
Sriskandarajah, C.3
-
19
-
-
54349090109
-
Approximations to optimal k-unit cycles for singlegripper and dual-gripper robotic cells
-
Geismar, H. N., L. M. A. Chan, M. Dawande, C. Sriskandarajah. 2008. Approximations to optimal k-unit cycles for singlegripper and dual-gripper robotic cells. Production Oper. Management. 17 (5) 551-563.
-
(2008)
Production Oper. Management
, vol.17
, Issue.5
, pp. 551-563
-
-
Geismar, H.N.1
Chan, L.M.A.2
Dawande, M.3
Sriskandarajah, C.4
-
20
-
-
0001068310
-
Sequencing a one state-variable machine: A solvable case of the traveling salesman problem
-
Gilmore, P. C., R. E. Gomory. 1964. Sequencing a one state-variable machine: A solvable case of the traveling salesman problem. Oper. Res. 12 655-679.
-
(1964)
Oper. Res
, vol.12
, pp. 655-679
-
-
Gilmore, P.C.1
Gomory, R.E.2
-
21
-
-
74849101820
-
Optimization and approximation in deterministic sequencing and scheduling: A survey
-
Graham, R. L., E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan. 1979. Optimization and approximation in deterministic sequencing and scheduling: A survey. Ann. Discrete Math. 5 287-326.
-
(1979)
Ann. Discrete Math
, vol.5
, pp. 287-326
-
-
Graham, R.L.1
Lawler, E.L.2
Lenstra, J.K.3
Rinnooy Kan, A.H.G.4
-
22
-
-
85215356632
-
Operations research techniques for robotic systems
-
S. Y. Nof, ed, John Wiley, New York
-
Hall, N. G. 1999. Operations research techniques for robotic systems. S. Y. Nof, ed. Operations Research Techniques for Robotic Systems. Handbookof Industrial Robotics, Vol. II. John Wiley, New York, 543-577.
-
(1999)
Operations Research Techniques for Robotic Systems. Handbookof Industrial Robotics
, vol.2
, pp. 543-577
-
-
Hall, N.G.1
-
23
-
-
0031142587
-
Scheduling in robotic cells: Classification, two and three machine cells
-
Hall, N. G., H. Kamoun, C. Sriskandarajah. 1997. Scheduling in robotic cells: Classification, two and three machine cells. Oper. Res. 45 421-439.
-
(1997)
Oper. Res
, vol.45
, pp. 421-439
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
24
-
-
0002868454
-
Scheduling in robotic cells: Complexity and steady state analysis
-
Hall, N. G., H. Kamoun, C. Sriskandarajah. 1998. Scheduling in robotic cells: Complexity and steady state analysis. Eur. J. Oper. Res. 109 43-63.
-
(1998)
Eur. J. Oper. Res
, vol.109
, pp. 43-63
-
-
Hall, N.G.1
Kamoun, H.2
Sriskandarajah, C.3
-
25
-
-
0033312656
-
Scheduling in robotic cells: Heuristics and cell design
-
Kamoun, H., N. G. Hall, C. Sriskandarajah. 1999. Scheduling in robotic cells: Heuristics and cell design. Oper. Res. 47 821-835.
-
(1999)
Oper. Res
, vol.47
, pp. 821-835
-
-
Kamoun, H.1
Hall, N.G.2
Sriskandarajah, C.3
-
26
-
-
0345757595
-
Cycle scheduling in a robotic production line
-
Kats, V., E. Levner. 2002. Cycle scheduling in a robotic production line. J. Scheduling 5 23-41.
-
(2002)
J. Scheduling
, vol.5
, pp. 23-41
-
-
Kats, V.1
Levner, E.2
-
28
-
-
11844251167
-
Minimizing cycle time in large robotic cells
-
Kumar, S., N. Ramanan, C. Sriskandarajah. 2005. Minimizing cycle time in large robotic cells. IIE Trans. 37 123-136.
-
(2005)
IIE Trans
, vol.37
, pp. 123-136
-
-
Kumar, S.1
Ramanan, N.2
Sriskandarajah, C.3
-
29
-
-
0003408279
-
-
Lawler, E. L, J. K. Lenstra, A. H. G. Rinnooy Kan, D. B. Shmoys, eds, John Wiley & Sons, Chichester
-
Lawler, E. L., J. K. Lenstra, A. H. G. Rinnooy Kan, D. B. Shmoys, eds. 1985. The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization. John Wiley & Sons, Chichester.
-
(1985)
The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization
-
-
-
30
-
-
0028396353
-
Determining optimal cyclic hoist schedules in a single-hoist electroplating line
-
Lei, L., T.-J. Wang. 1994. Determining optimal cyclic hoist schedules in a single-hoist electroplating line. IIE Trans. 26 25-33.
-
(1994)
IIE Trans
, vol.26
, pp. 25-33
-
-
Lei, L.1
Wang, T.-J.2
-
31
-
-
12344318544
-
Optimal cyclic multi-hoist scheduling: A mixed integer programming approach
-
Leung, J. M. Y., G. Zhang, X. Yang, R. Mak, K. Lam. 2004. Optimal cyclic multi-hoist scheduling: A mixed integer programming approach. Oper. Res. 52 965-976.
-
(2004)
Oper. Res
, vol.52
, pp. 965-976
-
-
Leung, J.M.Y.1
Zhang, G.2
Yang, X.3
Mak, R.4
Lam, K.5
-
32
-
-
0031095268
-
An improved algorithm for cyclic robotic flowshop scheduling in a robotic cell
-
Levner, E., V. Kats, V. E. Levit. 1997. An improved algorithm for cyclic robotic flowshop scheduling in a robotic cell. Eur. J. Oper. Res. 97 500-508.
-
(1997)
Eur. J. Oper. Res
, vol.97
, pp. 500-508
-
-
Levner, E.1
Kats, V.2
Levit, V.E.3
-
33
-
-
0036778727
-
Cyclic scheduling of a single hoist in extended electroplating lines: A comprehensive integer programming solution
-
Liu, J., J. Jiang, Z. Zhou. 2002. Cyclic scheduling of a single hoist in extended electroplating lines: A comprehensive integer programming solution. IIE Trans. 34 905-914.
-
(2002)
IIE Trans
, vol.34
, pp. 905-914
-
-
Liu, J.1
Jiang, J.2
Zhou, Z.3
-
35
-
-
0030214772
-
Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput
-
Perkinson, T., R. Gyurcsik, P. McLarty. 1996. Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput. IEEE Trans. Semiconductor Manufacturing 9 384-400.
-
(1996)
IEEE Trans. Semiconductor Manufacturing
, vol.9
, pp. 384-400
-
-
Perkinson, T.1
Gyurcsik, R.2
McLarty, P.3
-
36
-
-
0028481573
-
Single-wafer cluster tool performance: An analysis of throughput
-
Perkinson, T., P. McLarty, R. Gyurcsik, R. Cavin. 1994. Single-wafer cluster tool performance: An analysis of throughput. IEEE Trans. Semiconductor Manufacturing 7 369-373.
-
(1994)
IEEE Trans. Semiconductor Manufacturing
, vol.7
, pp. 369-373
-
-
Perkinson, T.1
McLarty, P.2
Gyurcsik, R.3
Cavin, R.4
-
37
-
-
0016962332
-
Mathematical programming solution of hoist scheduling problem
-
Phillips, L. W., P. S. Unger. 1976. Mathematical programming solution of hoist scheduling problem. AIIE Trans. 8 219-225.
-
(1976)
AIIE Trans
, vol.8
, pp. 219-225
-
-
Phillips, L.W.1
Unger, P.S.2
-
38
-
-
0003438602
-
-
Prentice Hall, Englewood Cliffs, NJ
-
Pinedo, M. 2002. Scheduling: Theory, Algorithms, and Systems. Prentice Hall, Englewood Cliffs, NJ.
-
(2002)
Scheduling: Theory, Algorithms, and Systems
-
-
Pinedo, M.1
-
39
-
-
67649935516
-
-
Personal communication. 2007
-
Ramanan, N. 2002, 2004, 2007. Personal communication.
-
(2002)
-
-
Ramanan, N.1
-
40
-
-
67649991338
-
-
Robotic Industries Association. 2006. http://www.roboticsonline.com.
-
Robotic Industries Association. 2006. http://www.roboticsonline.com.
-
-
-
-
42
-
-
0000222016
-
Sequencing of parts and robot moves in a robotic cell
-
Sethi, S. P., C. Sriskandarajah, G. Sorger, J. Blazewicz, W. Kubiak. 1992. Sequencing of parts and robot moves in a robotic cell. Internat. J. Flexible Manufacturing Systems 4 331-358.
-
(1992)
Internat. J. Flexible Manufacturing Systems
, vol.4
, pp. 331-358
-
-
Sethi, S.P.1
Sriskandarajah, C.2
Sorger, G.3
Blazewicz, J.4
Kubiak, W.5
-
43
-
-
0024029390
-
Hoist scheduling for a PCB electroplating facility
-
Shapiro, G. W., H. W. Nuttle. 1988. Hoist scheduling for a PCB electroplating facility. IIE Trans. 20 157-167.
-
(1988)
IIE Trans
, vol.20
, pp. 157-167
-
-
Shapiro, G.W.1
Nuttle, H.W.2
-
46
-
-
9644286254
-
Scheduling multiple parts in a robotic cell served by a dual gripper robot
-
Sriskandarajah, C., I. G. Drobouchevitch, S. P. Sethi, R. Chandrasekaran. 2004. Scheduling multiple parts in a robotic cell served by a dual gripper robot. Oper. Res. 52 65-82.
-
(2004)
Oper. Res
, vol.52
, pp. 65-82
-
-
Sriskandarajah, C.1
Drobouchevitch, I.G.2
Sethi, S.P.3
Chandrasekaran, R.4
-
47
-
-
0030086424
-
Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems
-
Su, Q., F. F. Chen. 1996. Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems. IEEE Trans. Robotics Automation 12 22-30.
-
(1996)
IEEE Trans. Robotics Automation
, vol.12
, pp. 22-30
-
-
Su, Q.1
Chen, F.F.2
-
48
-
-
0141704761
-
Simple algorithms for Gilmore-Gomory's traveling salesman and related problems
-
Vairaktarakis, G. L. 2003. Simple algorithms for Gilmore-Gomory's traveling salesman and related problems. J. Scheduling 6 499-520.
-
(2003)
J. Scheduling
, vol.6
, pp. 499-520
-
-
Vairaktarakis, G.L.1
-
49
-
-
0031276238
-
A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots
-
Venkatesh, S., R. Davenport, P. Foxhoven, J. Nulman. 1997. A steady-state throughput analysis of cluster tools: Dual-blade versus single-blade robots. IEEE Trans. Semiconductor Manufacturing 10 418-424.
-
(1997)
IEEE Trans. Semiconductor Manufacturing
, vol.10
, pp. 418-424
-
-
Venkatesh, S.1
Davenport, R.2
Foxhoven, P.3
Nulman, J.4
-
50
-
-
0022093184
-
Scheduling algorithms for flexible flow lines
-
Wittrock, R. J. 1985. Scheduling algorithms for flexible flow lines. IBM J. Res. Development 29 401-412.
-
(1985)
IBM J. Res. Development
, vol.29
, pp. 401-412
-
-
Wittrock, R.J.1
-
51
-
-
0030212052
-
Simple performance models for integrated processing tools
-
Wood, S. 1996. Simple performance models for integrated processing tools. IEEE Trans. Semiconductor Manufacturing 9 320-328.
-
(1996)
IEEE Trans. Semiconductor Manufacturing
, vol.9
, pp. 320-328
-
-
Wood, S.1
|