메뉴 건너뛰기




Volumn 11, Issue 2, 2009, Pages 210-228

Multiple part-type production in robotic cells: equivalence of two real-world models

Author keywords

Computational complexity; Cyclic production; Dual gripper cells; Output buffers; Robotic cells

Indexed keywords

CONTROL MECHANISM; CYCLIC PRODUCTION; CYCLIC SCHEDULES; CYCLIC SOLUTIONS; DOMINATING CYCLES; DUAL GRIPPERS; DUAL-GRIPPER CELLS; MAXIMUM THROUGH-PUT; MULTIPLE PARTS; ONE-TO-ONE MAPPINGS; OPERATIONS MANAGERS; OUTPUT BUFFER; OUTPUT BUFFERS; REAL-WORLD; ROBOTIC CELL; ROBOTIC CELLS; THROUGHPUT MAXIMIZATION PROBLEM; TOTAL COSTS;

EID: 67649992224     PISSN: 15234614     EISSN: 15265498     Source Type: Journal    
DOI: 10.1287/msom.1070.0208     Document Type: Article
Times cited : (17)

References (51)
  • 1
    • 0033871635 scopus 로고    scopus 로고
    • Scheduling no-wait robotic cells with two and three machines
    • Agnetis, A. 2000. Scheduling no-wait robotic cells with two and three machines. Eur. J. Oper. Res. 123 303-314.
    • (2000) Eur. J. Oper. Res , vol.123 , pp. 303-314
    • Agnetis, A.1
  • 2
    • 0035248367 scopus 로고    scopus 로고
    • Cycle-time improvements for photolithography process in semiconductor manufacturing
    • Akçali, E., K. Nemoto, R. Uzsoy. 2001. Cycle-time improvements for photolithography process in semiconductor manufacturing. IEEE Trans. Semiconductor Manufacturing 14 48-56.
    • (2001) IEEE Trans. Semiconductor Manufacturing , vol.14 , pp. 48-56
    • Akçali, E.1    Nemoto, K.2    Uzsoy, R.3
  • 3
    • 0032791011 scopus 로고    scopus 로고
    • Scheduling of parts and robot activities in a two-machine robotic cell
    • Aneja, Y. P., H. Kamoun. 1999. Scheduling of parts and robot activities in a two-machine robotic cell. Comput. Oper. Res. 26 297-312.
    • (1999) Comput. Oper. Res , vol.26 , pp. 297-312
    • Aneja, Y.P.1    Kamoun, H.2
  • 5
    • 28244467803 scopus 로고    scopus 로고
    • Optimal cyclic production in robotic flow shops with buffer
    • Technical Report RR982-I, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France
    • Brauner, N., G. Finke, C. Gueguen. 1997. Optimal cyclic production in robotic flow shops with buffer. Technical Report RR982-I, Laboratoire LEIBNIZ, Institut IMAG, Grenoble, France.
    • (1997)
    • Brauner, N.1    Finke, G.2    Gueguen, C.3
  • 6
    • 0036476753 scopus 로고    scopus 로고
    • Multicyclic hoist scheduling with constant processing times
    • Che, A., C. Chu, F. Chu. 2002. Multicyclic hoist scheduling with constant processing times. IEEE Trans. Robotics Automation 18 69-80.
    • (2002) IEEE Trans. Robotics Automation , vol.18 , pp. 69-80
    • Che, A.1    Chu, C.2    Chu, F.3
  • 7
    • 0037448766 scopus 로고    scopus 로고
    • A polynomial algorithm for 2-degree cyclic robot scheduling
    • Che, A., C. Chu, E. Levner. 2003. A polynomial algorithm for 2-degree cyclic robot scheduling. Eur. J. Oper. Res. 145 31-44.
    • (2003) Eur. J. Oper. Res , vol.145 , pp. 31-44
    • Che, A.1    Chu, C.2    Levner, E.3
  • 9
    • 0031272146 scopus 로고    scopus 로고
    • Cyclic scheduling of identical parts in a robotic cell
    • Crama, Y., J. van de Klundert. 1997. Cyclic scheduling of identical parts in a robotic cell. Oper. Res. 45 952-965.
    • (1997) Oper. Res , vol.45 , pp. 952-965
    • Crama, Y.1    van de Klundert, J.2
  • 12
  • 15
    • 23944501918 scopus 로고    scopus 로고
    • Scheduling multiple parts in two-machine dual gripper robot cells: Heuristic algorithm and performance guarantee
    • Drobouchevitch, I. G., S. P. Sethi, J. B. Sidney, C. Sriskandarajah. 2004. Scheduling multiple parts in two-machine dual gripper robot cells: Heuristic algorithm and performance guarantee. Internat. J. Oper. Quant. Management 10 297-314.
    • (2004) Internat. J. Oper. Quant. Management , vol.10 , pp. 297-314
    • Drobouchevitch, I.G.1    Sethi, S.P.2    Sidney, J.B.3    Sriskandarajah, C.4
  • 17
    • 33746120814 scopus 로고    scopus 로고
    • Throughput optimization in constant travel-time dual gripper robotic cells with parallel machines
    • Geismar, H. N., M. Dawande, C. Sriskandarajah. 2006. Throughput optimization in constant travel-time dual gripper robotic cells with parallel machines. Production Oper. Management 15 311-328.
    • (2006) Production Oper. Management , vol.15 , pp. 311-328
    • Geismar, H.N.1    Dawande, M.2    Sriskandarajah, C.3
  • 18
    • 3242715937 scopus 로고    scopus 로고
    • Increasing throughput for robotic cells with parallel machines and multiple robots
    • Geismar, H. N., C. Sriskandarajah, N. Ramanan. 2004. Increasing throughput for robotic cells with parallel machines and multiple robots. IEEE Trans. Automation Sci. Engrg. 1 84-89.
    • (2004) IEEE Trans. Automation Sci. Engrg , vol.1 , pp. 84-89
    • Geismar, H.N.1    Sriskandarajah, C.2    Ramanan, N.3
  • 19
    • 54349090109 scopus 로고    scopus 로고
    • Approximations to optimal k-unit cycles for singlegripper and dual-gripper robotic cells
    • Geismar, H. N., L. M. A. Chan, M. Dawande, C. Sriskandarajah. 2008. Approximations to optimal k-unit cycles for singlegripper and dual-gripper robotic cells. Production Oper. Management. 17 (5) 551-563.
    • (2008) Production Oper. Management , vol.17 , Issue.5 , pp. 551-563
    • Geismar, H.N.1    Chan, L.M.A.2    Dawande, M.3    Sriskandarajah, C.4
  • 20
    • 0001068310 scopus 로고
    • Sequencing a one state-variable machine: A solvable case of the traveling salesman problem
    • Gilmore, P. C., R. E. Gomory. 1964. Sequencing a one state-variable machine: A solvable case of the traveling salesman problem. Oper. Res. 12 655-679.
    • (1964) Oper. Res , vol.12 , pp. 655-679
    • Gilmore, P.C.1    Gomory, R.E.2
  • 21
    • 74849101820 scopus 로고
    • Optimization and approximation in deterministic sequencing and scheduling: A survey
    • Graham, R. L., E. L. Lawler, J. K. Lenstra, A. H. G. Rinnooy Kan. 1979. Optimization and approximation in deterministic sequencing and scheduling: A survey. Ann. Discrete Math. 5 287-326.
    • (1979) Ann. Discrete Math , vol.5 , pp. 287-326
    • Graham, R.L.1    Lawler, E.L.2    Lenstra, J.K.3    Rinnooy Kan, A.H.G.4
  • 23
    • 0031142587 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Classification, two and three machine cells
    • Hall, N. G., H. Kamoun, C. Sriskandarajah. 1997. Scheduling in robotic cells: Classification, two and three machine cells. Oper. Res. 45 421-439.
    • (1997) Oper. Res , vol.45 , pp. 421-439
    • Hall, N.G.1    Kamoun, H.2    Sriskandarajah, C.3
  • 24
    • 0002868454 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Complexity and steady state analysis
    • Hall, N. G., H. Kamoun, C. Sriskandarajah. 1998. Scheduling in robotic cells: Complexity and steady state analysis. Eur. J. Oper. Res. 109 43-63.
    • (1998) Eur. J. Oper. Res , vol.109 , pp. 43-63
    • Hall, N.G.1    Kamoun, H.2    Sriskandarajah, C.3
  • 25
    • 0033312656 scopus 로고    scopus 로고
    • Scheduling in robotic cells: Heuristics and cell design
    • Kamoun, H., N. G. Hall, C. Sriskandarajah. 1999. Scheduling in robotic cells: Heuristics and cell design. Oper. Res. 47 821-835.
    • (1999) Oper. Res , vol.47 , pp. 821-835
    • Kamoun, H.1    Hall, N.G.2    Sriskandarajah, C.3
  • 26
    • 0345757595 scopus 로고    scopus 로고
    • Cycle scheduling in a robotic production line
    • Kats, V., E. Levner. 2002. Cycle scheduling in a robotic production line. J. Scheduling 5 23-41.
    • (2002) J. Scheduling , vol.5 , pp. 23-41
    • Kats, V.1    Levner, E.2
  • 27
    • 0032646146 scopus 로고    scopus 로고
    • Multiple-part cyclic hoist scheduling using a sieve method
    • Kats, V., E. Levner, L. Meyzin. 1999. Multiple-part cyclic hoist scheduling using a sieve method. IEEE Trans. Robotics Automation 15 704-713.
    • (1999) IEEE Trans. Robotics Automation , vol.15 , pp. 704-713
    • Kats, V.1    Levner, E.2    Meyzin, L.3
  • 28
    • 11844251167 scopus 로고    scopus 로고
    • Minimizing cycle time in large robotic cells
    • Kumar, S., N. Ramanan, C. Sriskandarajah. 2005. Minimizing cycle time in large robotic cells. IIE Trans. 37 123-136.
    • (2005) IIE Trans , vol.37 , pp. 123-136
    • Kumar, S.1    Ramanan, N.2    Sriskandarajah, C.3
  • 29
    • 0003408279 scopus 로고
    • Lawler, E. L, J. K. Lenstra, A. H. G. Rinnooy Kan, D. B. Shmoys, eds, John Wiley & Sons, Chichester
    • Lawler, E. L., J. K. Lenstra, A. H. G. Rinnooy Kan, D. B. Shmoys, eds. 1985. The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization. John Wiley & Sons, Chichester.
    • (1985) The Traveling Salesman Problem: A Guided Tour of Combinatorial Optimization
  • 30
    • 0028396353 scopus 로고
    • Determining optimal cyclic hoist schedules in a single-hoist electroplating line
    • Lei, L., T.-J. Wang. 1994. Determining optimal cyclic hoist schedules in a single-hoist electroplating line. IIE Trans. 26 25-33.
    • (1994) IIE Trans , vol.26 , pp. 25-33
    • Lei, L.1    Wang, T.-J.2
  • 31
    • 12344318544 scopus 로고    scopus 로고
    • Optimal cyclic multi-hoist scheduling: A mixed integer programming approach
    • Leung, J. M. Y., G. Zhang, X. Yang, R. Mak, K. Lam. 2004. Optimal cyclic multi-hoist scheduling: A mixed integer programming approach. Oper. Res. 52 965-976.
    • (2004) Oper. Res , vol.52 , pp. 965-976
    • Leung, J.M.Y.1    Zhang, G.2    Yang, X.3    Mak, R.4    Lam, K.5
  • 32
    • 0031095268 scopus 로고    scopus 로고
    • An improved algorithm for cyclic robotic flowshop scheduling in a robotic cell
    • Levner, E., V. Kats, V. E. Levit. 1997. An improved algorithm for cyclic robotic flowshop scheduling in a robotic cell. Eur. J. Oper. Res. 97 500-508.
    • (1997) Eur. J. Oper. Res , vol.97 , pp. 500-508
    • Levner, E.1    Kats, V.2    Levit, V.E.3
  • 33
    • 0036778727 scopus 로고    scopus 로고
    • Cyclic scheduling of a single hoist in extended electroplating lines: A comprehensive integer programming solution
    • Liu, J., J. Jiang, Z. Zhou. 2002. Cyclic scheduling of a single hoist in extended electroplating lines: A comprehensive integer programming solution. IIE Trans. 34 905-914.
    • (2002) IIE Trans , vol.34 , pp. 905-914
    • Liu, J.1    Jiang, J.2    Zhou, Z.3
  • 35
    • 0030214772 scopus 로고    scopus 로고
    • Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput
    • Perkinson, T., R. Gyurcsik, P. McLarty. 1996. Single-wafer cluster tool performance: An analysis of the effects of redundant chambers and revisitation sequences on throughput. IEEE Trans. Semiconductor Manufacturing 9 384-400.
    • (1996) IEEE Trans. Semiconductor Manufacturing , vol.9 , pp. 384-400
    • Perkinson, T.1    Gyurcsik, R.2    McLarty, P.3
  • 37
    • 0016962332 scopus 로고
    • Mathematical programming solution of hoist scheduling problem
    • Phillips, L. W., P. S. Unger. 1976. Mathematical programming solution of hoist scheduling problem. AIIE Trans. 8 219-225.
    • (1976) AIIE Trans , vol.8 , pp. 219-225
    • Phillips, L.W.1    Unger, P.S.2
  • 39
    • 67649935516 scopus 로고    scopus 로고
    • Personal communication. 2007
    • Ramanan, N. 2002, 2004, 2007. Personal communication.
    • (2002)
    • Ramanan, N.1
  • 40
    • 67649991338 scopus 로고    scopus 로고
    • Robotic Industries Association. 2006. http://www.roboticsonline.com.
    • Robotic Industries Association. 2006. http://www.roboticsonline.com.
  • 43
    • 0024029390 scopus 로고
    • Hoist scheduling for a PCB electroplating facility
    • Shapiro, G. W., H. W. Nuttle. 1988. Hoist scheduling for a PCB electroplating facility. IIE Trans. 20 157-167.
    • (1988) IIE Trans , vol.20 , pp. 157-167
    • Shapiro, G.W.1    Nuttle, H.W.2
  • 44
    • 84877343203 scopus 로고
    • An algorithm for scheduling a chemical processing tank line
    • Song, W., Z. B. Zabinsky, R. L. Storch. 1993. An algorithm for scheduling a chemical processing tank line. Production Planning Control 4 323-332.
    • (1993) Production Planning Control , vol.4 , pp. 323-332
    • Song, W.1    Zabinsky, Z.B.2    Storch, R.L.3
  • 45
    • 0032391968 scopus 로고    scopus 로고
    • Scheduling large robotic cells without buffers
    • Sriskandarajah, C., N. G. Hall, H. Kamoun. 1998. Scheduling large robotic cells without buffers. Ann. Oper. Res. 76 287-321.
    • (1998) Ann. Oper. Res , vol.76 , pp. 287-321
    • Sriskandarajah, C.1    Hall, N.G.2    Kamoun, H.3
  • 47
    • 0030086424 scopus 로고    scopus 로고
    • Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems
    • Su, Q., F. F. Chen. 1996. Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systems. IEEE Trans. Robotics Automation 12 22-30.
    • (1996) IEEE Trans. Robotics Automation , vol.12 , pp. 22-30
    • Su, Q.1    Chen, F.F.2
  • 48
    • 0141704761 scopus 로고    scopus 로고
    • Simple algorithms for Gilmore-Gomory's traveling salesman and related problems
    • Vairaktarakis, G. L. 2003. Simple algorithms for Gilmore-Gomory's traveling salesman and related problems. J. Scheduling 6 499-520.
    • (2003) J. Scheduling , vol.6 , pp. 499-520
    • Vairaktarakis, G.L.1
  • 50
    • 0022093184 scopus 로고
    • Scheduling algorithms for flexible flow lines
    • Wittrock, R. J. 1985. Scheduling algorithms for flexible flow lines. IBM J. Res. Development 29 401-412.
    • (1985) IBM J. Res. Development , vol.29 , pp. 401-412
    • Wittrock, R.J.1
  • 51
    • 0030212052 scopus 로고    scopus 로고
    • Simple performance models for integrated processing tools
    • Wood, S. 1996. Simple performance models for integrated processing tools. IEEE Trans. Semiconductor Manufacturing 9 320-328.
    • (1996) IEEE Trans. Semiconductor Manufacturing , vol.9 , pp. 320-328
    • Wood, S.1


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.