Volumn 36, Issue 5, 2009, Pages 777-790

Capital structure optimization for build-operate- transfer (BOT) projects using a stochastic and multi-objective approach

Author keywords

Capital structure; Financial risks; Multi objective optimization; Optimal equity ratio; Private financing

Indexed keywords

BALANCED STRUCTURES; BUILD-OPERATE-TRANSFER PROJECTS; CAPITAL STRUCTURE; FEASIBILITY STUDIES; FINANCIAL RISKS; GENERIC ALGORITHM; INFRASTRUCTURE PROJECT; MAINTENANCE COST; MONTE CARLO SIMULATION; MULTI OBJECTIVE; OPERATING INCOME; OPTIMAL EQUITY RATIO; OPTIMAL LEVEL; PRIVATE FINANCING; PRIVATE INVESTORS; PUBLIC INFRASTRUCTURES; RAILWAY PROJECT; RISK EXPOSURE; VARIABLE CONDITIONS;

EID: 67649786487     PISSN: 03151468     EISSN: None     Source Type: Journal    
DOI: 10.1139/L08-134     Document Type: Article
Times cited : (40)

References (35)
  • 1
    • 67649764823 scopus 로고    scopus 로고
    • Airport Railroad Co. Ltd. and Korea Railroad Network Agency. 2001. Execution contract document for Incheon International Airport railroad privately financed investment project. Airport Railroad Co. Ltd., and Korea Railroad Network Agency. Daejeon, Korea.
    • Airport Railroad Co. Ltd. and Korea Railroad Network Agency. 2001. Execution contract document for Incheon International Airport railroad privately financed investment project. Airport Railroad Co. Ltd., and Korea Railroad Network Agency. Daejeon, Korea.
  • 2
    • 34548663905 scopus 로고    scopus 로고
    • Algarni, A.M., Arditi, D., and Polat, G. 2007. Build-operate-transfer in the United States. Journal of Construction Management and Engineering, ASCE, 133(10): 728-735. doi:10.1061/(ASCE)0733-9364(2007)133:10(728).
    • Algarni, A.M., Arditi, D., and Polat, G. 2007. Build-operate-transfer in the United States. Journal of Construction Management and Engineering, ASCE, 133(10): 728-735. doi:10.1061/(ASCE)0733-9364(2007)133:10(728).
  • 3
    • 13944251011 scopus 로고    scopus 로고
    • Bakatjan, S., Arikan, M., and Tiong, R.K.L. 2003. Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Management and Engineering, ASCE, 129(1): 89- 97. doi:10.1061/(ASCE)0733- 9364(2003)129:1(89).
    • Bakatjan, S., Arikan, M., and Tiong, R.K.L. 2003. Optimal capital structure model for BOT power projects in Turkey. Journal of Construction Management and Engineering, ASCE, 129(1): 89- 97. doi:10.1061/(ASCE)0733- 9364(2003)129:1(89).
  • 4
    • 0031999506 scopus 로고    scopus 로고
    • The evaluation of risk management in public sector capital projects
    • doi:10.1016/S0263-7863(97)00015-X
    • Baldry, D. 1998. The evaluation of risk management in public sector capital projects. International Journal of Project Management, 16(1): 35-41. doi:10.1016/S0263-7863(97)00015-X.
    • (1998) International Journal of Project Management , vol.16 , Issue.1 , pp. 35-41
    • Baldry, D.1
  • 5
    • 12144255380 scopus 로고    scopus 로고
    • Bing, L., Akintoye, A., Edwards, P.J., and Hardcastle, C. 2005. The allocation of risk PPP/PFI construction projects in the UK. International Journal of Project Management, 23(1): 25-35. doi:10. 1016/j.ijproman. 2004.04.006.
    • Bing, L., Akintoye, A., Edwards, P.J., and Hardcastle, C. 2005. The allocation of risk PPP/PFI construction projects in the UK. International Journal of Project Management, 23(1): 25-35. doi:10. 1016/j.ijproman. 2004.04.006.
  • 7
    • 0035334486 scopus 로고    scopus 로고
    • Chang, L.M., and Chen, P.H. 2001. BOT financial model: Taiwan high speed rail case. Journal of Construction Management and Engineering, ASCE, 127(3): 214-222. doi:10.1061/(ASCE) 0733-9364(2001)127:3(214).
    • Chang, L.M., and Chen, P.H. 2001. BOT financial model: Taiwan high speed rail case. Journal of Construction Management and Engineering, ASCE, 127(3): 214-222. doi:10.1061/(ASCE) 0733-9364(2001)127:3(214).
  • 10
    • 0029532895 scopus 로고    scopus 로고
    • Dias, A., Jr., and Ioannou, P.G. 1995. Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Management and Engineering, ASCE, 121(4): 404-414. doi:10.1061/(ASCE)0733-9364(1995)121:4(404).
    • Dias, A., Jr., and Ioannou, P.G. 1995. Debt capacity and optimal capital structure for privately financed infrastructure projects. Journal of Construction Management and Engineering, ASCE, 121(4): 404-414. doi:10.1061/(ASCE)0733-9364(1995)121:4(404).
  • 11
    • 0142184206 scopus 로고    scopus 로고
    • Principal-agency risk in project finance
    • doi:10.1016/S0263-7863(02)00086-8
    • Farrell, L.M. 2003. Principal-agency risk in project finance. International Journal of Project Management, 21(8): 547-561. doi:10.1016/S0263-7863(02)00086-8.
    • (2003) International Journal of Project Management , vol.21 , Issue.8 , pp. 547-561
    • Farrell, L.M.1
  • 12
    • 0001953837 scopus 로고
    • Genetic algorithms for multi-objective optimization: Formulation, discussion and generalization
    • July, Edited by S. Forrest, Morgan Kaufmann Publishers, San Mateo Calif. pp
    • Fonseca, C.M., and Fleming, P.J. 1993. Genetic algorithms for multi-objective optimization: Formulation, discussion and generalization. In Proceedings of the 5th International Conference on Genetic Algorithms. Ubana-Champaign, Ill. 17-22 July 1993. Edited by S. Forrest, Morgan Kaufmann Publishers, San Mateo Calif. pp. 416-423.
    • (1993) Proceedings of the 5th International Conference on Genetic Algorithms. Ubana-Champaign, Ill. 17-22 , pp. 416-423
    • Fonseca, C.M.1    Fleming, P.J.2
  • 13
    • 0036466940 scopus 로고    scopus 로고
    • Evaluating the risks of public private partnerships for infrastructure projects
    • doi:10.1016/S0263-7863(00)00040-5
    • Grimsey, D., and Lewis, M.K. 2002. Evaluating the risks of public private partnerships for infrastructure projects. International Journal of Project Management, 20(2): 107-118. doi:10.1016/S0263-7863(00)00040-5.
    • (2002) International Journal of Project Management , vol.20 , Issue.2 , pp. 107-118
    • Grimsey, D.1    Lewis, M.K.2
  • 14
    • 0032055682 scopus 로고    scopus 로고
    • Development and project financing of private power projects in developing countries: A case study of India
    • doi:10.1016/S0263-7863(97)00030-6
    • Gupta, J.P., and Sravat, A.K. 1998. Development and project financing of private power projects in developing countries: A case study of India. International Journal of Project Management, 16(2): 99-105. doi:10.1016/S0263-7863(97)00030-6.
    • (1998) International Journal of Project Management , vol.16 , Issue.2 , pp. 99-105
    • Gupta, J.P.1    Sravat, A.K.2
  • 15
    • 0036499550 scopus 로고    scopus 로고
    • An option pricing-based model for evaluating the financial viability of private infrastructure projects
    • doi:10.1080/ 01446190110110533
    • Ho, S.P., and Liu, L.Y. 2002. An option pricing-based model for evaluating the financial viability of private infrastructure projects. Construction Management and Economics, 20: 143-156. doi:10.1080/ 01446190110110533.
    • (2002) Construction Management and Economics , vol.20 , pp. 143-156
    • Ho, S.P.1    Liu, L.Y.2
  • 16
    • 67649758622 scopus 로고    scopus 로고
    • A study on the financial risk assessment of SOC private investment projects: Focused on light rail transit projects
    • Jung, D.W., Kim, H.J., Hyun, C.T., and Kim, I.H. 2001. A study on the financial risk assessment of SOC private investment projects: focused on light rail transit projects. Korean Journal of Architectural Engineering, 17(5): 109-116.
    • (2001) Korean Journal of Architectural Engineering , vol.17 , Issue.5 , pp. 109-116
    • Jung, D.W.1    Kim, H.J.2    Hyun, C.T.3    Kim, I.H.4
  • 17
    • 0000125532 scopus 로고
    • Prospect theory: An analysis of decision under risk
    • doi:10. 2307/1914185
    • Kahneman, D., and Tversky, A. 1979. Prospect theory: An analysis of decision under risk. Econometrica, 47(2): 263-291. doi:10. 2307/1914185.
    • (1979) Econometrica , vol.47 , Issue.2 , pp. 263-291
    • Kahneman, D.1    Tversky, A.2
  • 18
    • 4444379773 scopus 로고    scopus 로고
    • KRIHS, Korean Research Institute for Human Settlement KRIHS, Anyang, Korea
    • KRIHS. 2001. Rate of return of PPI projects. Korean Research Institute for Human Settlement (KRIHS), Anyang, Korea.
    • (2001) Rate of return of PPI projects
  • 19
    • 0346034988 scopus 로고
    • The IRR, NPV and the fallacy of the reinvestment rate assumptions
    • doi:10.1080/00137918808966959
    • Lohmann, J.R. 1988. The IRR, NPV and the fallacy of the reinvestment rate assumptions. The Engineering Economist, 33(4): 303- 330. doi:10.1080/00137918808966959.
    • (1988) The Engineering Economist , vol.33 , Issue.4 , pp. 303-330
    • Lohmann, J.R.1
  • 23
    • 0031121951 scopus 로고    scopus 로고
    • Ngee, L., Tiong, R.L.K., and Alum, J. 1997. Automated approach to negotiation of BOT contractors. Journal of Computing in Civil Engineering, 11(2): 121-128. doi:10.1061/(ASCE)0887- 3801(1997)11:2(121).
    • Ngee, L., Tiong, R.L.K., and Alum, J. 1997. Automated approach to negotiation of BOT contractors. Journal of Computing in Civil Engineering, 11(2): 121-128. doi:10.1061/(ASCE)0887- 3801(1997)11:2(121).
  • 24
    • 23944461579 scopus 로고    scopus 로고
    • Improving decision quality: A risk-based go/no-go decision for BOT projects
    • doi:10.1139/l05-002
    • Ock, J.H., Han, S.H., Park, H.K., and Diekmann, J.E. 2005. Improving decision quality: a risk-based go/no-go decision for BOT projects. Canadian Journal of Civil Engineering, 32: 517- 532. doi:10.1139/l05-002.
    • (2005) Canadian Journal of Civil Engineering , vol.32 , pp. 517-532
    • Ock, J.H.1    Han, S.H.2    Park, H.K.3    Diekmann, J.E.4
  • 25
    • 67649758500 scopus 로고    scopus 로고
    • Concept and practice of project financing
    • 2nd ed, Seoul, Korea
    • Park, D.K. 2003. Concept and practice of project financing. 2nd ed. Myungkyunga, Seoul, Korea.
    • (2003) Myungkyunga
    • Park, D.K.1
  • 26
    • 2142689698 scopus 로고    scopus 로고
    • Total project cost: A simplified model for decision makers
    • doi:10.1080/014461996373205
    • Ranasinghe, M. 1996. Total project cost: A simplified model for decision makers. Construction Management and Economics, 14: 497-505. doi:10.1080/014461996373205.
    • (1996) Construction Management and Economics , vol.14 , pp. 497-505
    • Ranasinghe, M.1
  • 27
    • 13944254022 scopus 로고    scopus 로고
    • Schaufelberger, J.E., and Wipadapisut, I. 2003. Alternate financing strategies for build-operate-transfer projects. Journal of Construction Management and Engineering, ASCE, 129(2): 205- 213. doi:10.1061/(ASCE) 0733-9364(2003)129:2(205).
    • Schaufelberger, J.E., and Wipadapisut, I. 2003. Alternate financing strategies for build-operate-transfer projects. Journal of Construction Management and Engineering, ASCE, 129(2): 205- 213. doi:10.1061/(ASCE) 0733-9364(2003)129:2(205).
  • 28
    • 0029361064 scopus 로고    scopus 로고
    • Tiong, R.L.K. 1995. Competitive advantage of equity in BOT tender. Journal of Construction Management and Engineering, ASCE, 121(3): 282-289. doi:10.1061/(ASCE)0733-9364(1995) 121:3(282).
    • Tiong, R.L.K. 1995. Competitive advantage of equity in BOT tender. Journal of Construction Management and Engineering, ASCE, 121(3): 282-289. doi:10.1061/(ASCE)0733-9364(1995) 121:3(282).
  • 29
    • 0031126476 scopus 로고    scopus 로고
    • Financial commitment for BOT projects
    • doi:10.1016/S0263-7863(96)00033-6
    • Tiong, R.L.K., and Alum, J. 1997. Financial commitment for BOT projects. International Journal of Project Management, 15(2): 73-78. doi:10.1016/S0263-7863(96)00033-6.
    • (1997) International Journal of Project Management , vol.15 , Issue.2 , pp. 73-78
    • Tiong, R.L.K.1    Alum, J.2
  • 30
    • 24944490978 scopus 로고    scopus 로고
    • Wibowo, A., and Kochendörfer, B. 2005. Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Management and Engineering, ASCE, 131(9): 963-972. doi:10. 1061/(ASCE)0733-9364(2005) 131:9(963).
    • Wibowo, A., and Kochendörfer, B. 2005. Financial risk analysis of project finance in Indonesian toll roads. Journal of Construction Management and Engineering, ASCE, 131(9): 963-972. doi:10. 1061/(ASCE)0733-9364(2005) 131:9(963).
  • 31
    • 0035279491 scopus 로고    scopus 로고
    • Wooldridge, S.C., Garvin, M.J., and Miller, J.B. 2001. Effects of accounting and budgeting on capital allocation for infrastructure projects. Journal of Management Engineering, 17(2): 86-94. doi:10.1061/(ASCE)0742- 597X(2001)17:2(86).
    • Wooldridge, S.C., Garvin, M.J., and Miller, J.B. 2001. Effects of accounting and budgeting on capital allocation for infrastructure projects. Journal of Management Engineering, 17(2): 86-94. doi:10.1061/(ASCE)0742- 597X(2001)17:2(86).
  • 32
    • 0008563034 scopus 로고    scopus 로고
    • Ye, S., and Tiong, R.L.K. 2000. NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Management and Engineering, ASCE, 126(3): 227-233. doi:10.1061/(ASCE)0733-9364(2000)126: 3(227).
    • Ye, S., and Tiong, R.L.K. 2000. NPV-at-risk method in infrastructure project investment evaluation. Journal of Construction Management and Engineering, ASCE, 126(3): 227-233. doi:10.1061/(ASCE)0733-9364(2000)126: 3(227).
  • 33
    • 12344321226 scopus 로고    scopus 로고
    • Zhang, X. 2004. Improving concessionaire selection protocols in public/private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5): 670-679. doi:10.1061/(ASCE)0733- 9364(2004)130:5(670).
    • Zhang, X. 2004. Improving concessionaire selection protocols in public/private partnered infrastructure projects. Journal of Construction Engineering and Management, 130(5): 670-679. doi:10.1061/(ASCE)0733- 9364(2004)130:5(670).
  • 34
    • 20444441426 scopus 로고    scopus 로고
    • Zhang, X. 2005a. Financial viability analysis and capital structure optimization in private public infrastructure projects. Journal of Construction Engineering and Management, 131(6): 656-668. doi:10.1061/(ASCE)0733-9364(2005)131:6(656).
    • Zhang, X. 2005a. Financial viability analysis and capital structure optimization in private public infrastructure projects. Journal of Construction Engineering and Management, 131(6): 656-668. doi:10.1061/(ASCE)0733-9364(2005)131:6(656).
  • 35
    • 26644443645 scopus 로고    scopus 로고
    • Zhang, X. 2005b. Concessionairés financing capacity in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10): 1054- 1064. doi:10.1061/(ASCE)0733-9364(2005)131:10(1054).
    • Zhang, X. 2005b. Concessionairés financing capacity in developing build-operate-transfer type infrastructure projects. Journal of Construction Engineering and Management, 131(10): 1054- 1064. doi:10.1061/(ASCE)0733-9364(2005)131:10(1054).


* 이 정보는 Elsevier사의 SCOPUS DB에서 KISTI가 분석하여 추출한 것입니다.